Powered By Kitlog Pro v2.0
Mark's Web Site
RV-12
Finishing
Work Logs Found:
144
Category Work Time:
290 Hours
Date
Hours
Work Log Summary
Details
04-26-2019
10.00
Finish fairings and prep for paint
Details
04-24-2019
5.00
Nose wheel fairing (36is)
Details
04-23-2019
2.00
Nose wheel & gear leg fairing (36is)
Details
04-22-2019
1.00
More tools needed (36is)
Details
04-20-2019
1.00
Complete nose fork (35 & 36is)
Details
04-19-2019
2.00
Paint nose wheel fork (35)
Details
04-15-2019
8.00
Re-install main gear
Details
04-13-2019
10.00
Remove and paint main gear legs (35)
Details
04-06-2019
10.00
Main Wheel Fairings (36A)
Details
02-02-2019
2.00
Wheel Fairings (36-03)
Details
01-27-2019
1.00
Wheel Fairings (36-02)
Details
08-31-2018
3.00
Rear Window install (25-06)
Details
08-18-2018
2.50
Fill brake system (35-08)
Details
07-06-2018
1.00
Rudder pedal access covers (33-03)
Details
07-05-2018
1.00
Fuel tank filler neck install (37-09)
Details
07-04-2018
1.00
Misc items and covers (33-02)
Details
06-22-2018
2.00
Paint remaining floor sections (42C-11)
Details
03-23-2018
1.00
Install canopy catch (34-25)
Details
12-09-2017
1.00
Finish lower cowl close out (38-09)
Details
12-08-2017
2.00
Lower cowling close out (38-09)
Details
11-15-2017
1.00
Attach oil access door (38-08)
Details
11-14-2017
1.00
Cut out oil door and access hole (38-07)
Details
11-13-2017
1.00
Attach nut plates to fwd cowling (38-07)
Details
11-12-2017
6.00
Set cowling rivets (38-06)
Details
11-08-2017
2.00
Countersink all the cowling holes (38-06)
Details
11-07-2017
3.00
Drill hinge attachment holes (38-06)
Details
11-04-2017
6.00
Cowling trim/fit (38-05)
Details
10-31-2017
2.00
Cowling fit / trim (38-05)
Details
10-26-2017
3.00
Fabricating cowling hinges and pins (38-03,04)
Details
10-11-2017
3.00
Prep cowling for install (38-02)
Details
09-02-2017
1.00
Instal fuel vent lines (37-08)
Details
09-01-2017
2.00
fuel vent line install (37-08)
Details
08-26-2017
1.00
Fuel vent line (37-08)
Details
08-25-2017
1.00
Fuel vent lines (37-08)
Details
08-24-2017
0.50
Fule neck plate nuts (37-07)
Details
08-23-2017
0.50
Fule neck plate nuts (37-07)
Details
08-22-2017
2.00
Fuel Tank Install (37-07)
Details
08-21-2017
3.00
Canopy sanding (34-16)
Details
08-05-2017
2.00
Canopy trim work (34-15)
Details
07-22-2017
1.00
More trimming on canopy (34-15)
Details
07-21-2017
3.00
Canopy re-install (34-15)
Details
07-01-2017
1.00
Detailed finishing on canopy (34-15)
Details
06-03-2017
1.00
Remove canopy (34-15)
Details
06-02-2017
2.00
Remove canopy (34-15)
Details
05-21-2017
1.00
Locate bolt hole through fiberglass (34-15)
Details
05-20-2017
4.00
Lots of sanding sanding (34-15)
Details
05-07-2017
1.00
Peel-ply off and added some epoxy flox (34-15)
Details
05-06-2017
1.00
Last layer and peel-ply (34-14)
Details
05-06-2017
1.00
Continue layup (34-14)
Details
05-05-2017
1.00
Fiberglass Layup (34-14)
Details
05-04-2017
1.00
starting the fiberglass (34-14)
Details
05-03-2017
1.00
Cut out fiberglass (34-14)
Details
05-02-2017
1.00
Fiberglass prep (34-14)
Details
05-01-2017
0.50
Smoother transition for masking line (34-14)
Details
04-29-2017
0.50
Mask edge for fiberglass (34-14)
Details
04-28-2017
0.50
Mask edging for fiberglass (34-14)
Details
04-27-2017
0.50
Shape foam (34-13)
Details
04-26-2017
1.00
Attach foam blocks (34-13)
Details
04-25-2017
0.50
Cut foam blocks to canopy (34-13)
Details
04-24-2017
0.50
Prep for foam blocks (34-13)
Details
04-22-2017
0.50
Masking prep (34-13)
Details
04-21-2017
0.50
Masking Prep (34-13)
Details
04-20-2017
0.50
Masking in prep for fiberglass (34-13)
Details
04-19-2017
0.50
Wire canopy latch switch (34-11)
Details
04-04-2017
1.00
Install canopy latch micro switch (34-11)
Details
04-02-2017
0.50
Canopy latch (34-11)
Details
04-01-2017
0.50
Install canopy latch (34-10)
Details
03-26-2017
2.00
Canopy guide blocks (34-12)
Details
03-25-2017
2.00
Attach canopy (34-09)
Details
03-22-2017
1.00
Attach canopy to frame (34-09)
Details
03-19-2017
2.00
Attach canopy side and skirt (34-09)
Details
03-18-2017
1.00
Don't drop the canopy (34-09)
Details
03-17-2017
1.00
Additional clearance for canopy edge (34-09)
Details
03-16-2017
3.00
Attaching canopy to rear frame (34-09)
Details
03-15-2017
1.00
Canopy back on (34-09)
Details
03-08-2017
2.00
Fabricate canopy lift handles (34-09)
Details
02-18-2017
1.00
Canopy guide plate installation (34-08)
Details
02-10-2017
2.00
Canopy install (34-07)
Details
02-04-2017
1.00
Guide plate and block installation (34-08)
Details
01-28-2017
0.50
Canopy handle (34-07)
Details
01-27-2017
0.50
Canopy latch (34-07)
Details
01-26-2017
2.00
Tension stabilator cables (32-14)
Details
01-24-2017
1.00
Install canopy (34-06)
Details
01-22-2017
3.00
Install canopy (34-06)
Details
01-21-2017
2.00
Canopy intallation (34-05)
Details
01-20-2017
1.00
Canopy Installation (34-04)
Details
01-19-2017
1.00
Canopy installation (34-04)
Details
01-18-2017
1.00
Canopy installation (34-03)
Details
01-17-2017
1.00
fix bolt orientation for flight control (32-05)
Details
01-14-2017
3.00
Canopy Frame (34-02)
Details
01-09-2017
0.50
Canopy Struts (34-02) - NOTIFICATION 16-11-04
Details
01-07-2017
0.50
Completed front gear stops (35-07)
Details
01-06-2017
1.00
Remove damaged ES-00078 connector (30-03)
Details
01-05-2017
1.00
Finsh falperon torque arms (32-10)
Details
01-04-2017
2.00
Flaperon torque arms (32-10)
Details
01-03-2017
2.00
Flaperon torque arms (32-10)
Details
01-02-2017
1.00
Wings on (30-04)
Details
01-01-2017
3.00
Wings trial fit (30-03)
Details
12-31-2016
2.00
Horizontal stabilizer control cables (32-13)
Details
12-30-2016
3.00
Attach rudder cables (32-12)
Details
12-29-2016
2.00
Rudder cables (32-11 &12)
Details
12-29-2016
2.00
Rudder cables (32-11 & 12)
Details
12-28-2016
3.00
Flaperon torque arm spacer (32-08)
Details
12-27-2016
5.00
Flaperon bell cranks & flap handle (32-07)
Details
12-26-2016
3.00
Flaperon control arms (32-06)
Details
12-25-2016
3.00
Install mixer and control rods (32-05)
Details
12-24-2016
2.00
Attach flap handle (32-04)
Details
12-23-2016
2.00
Installed brake lines (32-02)
Details
12-22-2016
1.00
Plane is on it's feet (35-07)
Details
12-22-2016
3.00
Install vertical stabilzer (32-02 & 11-02)
Details
12-22-2016
3.00
Install brake lines (35-06)
Details
12-21-2016
2.00
Attach front wheel (35-07)
Details
12-20-2016
4.00
Install axils main gear (35-04)
Details
12-19-2016
5.00
Install right gear spar (35-03)
Details
12-18-2016
3.00
Tires (35-02)
Details
12-17-2016
1.00
Install engine mount (35-02)
Details
12-16-2016
2.00
Canopy roll bar wires (31B-26)
Details
12-15-2016
3.00
Group wires and add shield (31B-25)
Details
12-14-2016
3.00
Wing connect cover plates (31B-24)
Details
12-13-2016
3.00
Noise filter intall (31B-22)
Details
12-10-2016
2.00
Complete tail cone wiring (31B-21)
Details
12-09-2016
3.00
Tailcone wire routing (31B-21)
Details
12-08-2016
1.00
Wire wing connectors (31B-18)
Details
12-07-2016
2.00
Headset connections (31B-17)
Details
12-06-2016
3.00
Attach power outlet (31B-16)
Details
12-05-2016
3.00
Started routing Options wire harness (31B-15)
Details
12-03-2016
3.00
Attach control sticks and wire PTT (31B-12)
Details
12-01-2016
1.50
Fule pump wire (31B-11)
Details
11-30-2016
3.00
Spar pin switch installation (31B-10)
Details
11-12-2016
1.00
Prep plane for some weekend visitors (31B-04)
Details
11-09-2016
0.50
Trail fit spar pins
Details
11-07-2016
0.50
Spar pin assembly (30-02)
Details
11-05-2016
0.50
Wing spar pin (30-02)
Details
11-04-2016
0.50
Wire fuel sensor and aux music jack (31B-06,07)
Details
11-03-2016
0.50
Install CPU fans (31B-05)
Details
11-02-2016
0.50
Complete WH-00046 plug (31B-05)
Details
10-10-2016
1.00
Run WH-00046 wire harness (31B-05)
Details
09-29-2016
0.50
Run ELT line (31B-03)
Details
09-28-2016
0.50
Run cables (31B-03)
Details
09-24-2016
1.00
Grommet and cushion clamp installation (31B-02)
Details
08-13-2016
2.00
Rear baggage panel prep (33-03)
Details
03-23-2016
2.00
Completed fuel line to gascolator
Details
01-16-2016
8.00
Inventory Finishing Kit
Details
01-15-2016
8.00
Finishing Kit Inventory
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
Category
# Logs
# Hours
All
632
1257
Avionics
23
22
Certification
1
1
Empennage
76
176
Engine
67
78
Finishing
144
290
Flight
3
Fuselage
163
348
Miscellaneous
2
None
9
3
Paint
24
50
PAP
14
18
Service Bulletin
21
30
Shop Supplies
4
Tools
2
Wings
79
241
Copyright © 2001-2024 Matronics. All Rights Reserved.