Date
|
Hours
|
Work Log Summary
|
Details
|
06-22-2016
|
3.50
|
added stainless steel to floor area for wear plate
|
Details
|
|
|
06-21-2016
|
3.50
|
Temporarily installed front skin and baggage door
|
Details
|
|
|
06-19-2016
|
3.50
|
Assembly of the forward baggage door
|
Details
|
|
|
06-18-2016
|
1.50
|
Com antenna and transponder antenna doubler plates
|
Details
|
|
|
06-17-2016
|
3.50
|
counter sink all doubler plates and fuselage for a
|
Details
|
|
|
06-11-2016
|
2.50
|
Doubler plates for Com antenna and Transponder Ant
|
Details
|
|
|
06-06-2016
|
2.50
|
Finished riveting Turtle deck
|
Details
|
|
|
06-04-2016
|
1.00
|
View from the left side of the turtle deck. Bulkhe
|
Details
|
|
|
06-04-2016
|
5.00
|
Start of riveting on the Turtle deck
|
Details
|
|
|
06-03-2016
|
2.00
|
Used pro seal to attach the items listed in the pi
|
Details
|
|
|
06-03-2016
|
2.50
|
Temporarily installed the rear turtle deck
|
Details
|
|
|
06-03-2016
|
3.00
|
Placed moving blankets inside the floor area to be
|
Details
|
|
|
06-03-2016
|
3.50
|
Fabricated avionics shelf behind panel
|
Details
|
|
|
06-03-2016
|
2.50
|
Drilled and installed the rudder cable fairings
|
Details
|
|
|
05-30-2016
|
2.50
|
Finish paint on Forward baggage, and rear skin
|
Details
|
|
|
05-29-2016
|
2.50
|
Primmed rear skin, step and front skin parts
|
Details
|
|
|
05-29-2016
|
2.50
|
Primmed panel, forward skin, baggage parts and rea
|
Details
|
|
|
05-28-2016
|
2.50
|
Assemble mounting rings and brackets on panel
|
Details
|
|
|
05-27-2016
|
2.50
|
Received the mounting kit for the Garmin G3X scree
|
Details
|
|
|
05-19-2016
|
3.50
|
Installation of front throttle quadrant and tempor
|
Details
|
|
|
05-18-2016
|
2.50
|
Received the Panel from Stein Air
|
Details
|
|
|
05-15-2016
|
1.50
|
Installed rear throttle quadrant
|
Details
|
|
|
05-14-2016
|
3.50
|
Drilled all floor holes to install nut plates
|
Details
|
|
|
05-07-2016
|
2.00
|
Alodine GMU and Elt mounts
|
Details
|
|
|
05-05-2016
|
3.50
|
Magnotometer and Elt antenna mount
|
Details
|
|
|
05-02-2016
|
2.50
|
Sent panel off to Stein Air
|
Details
|
|
|
05-01-2016
|
3.00
|
Fit forward baggage door and instrument panel
|
Details
|
|
|
04-30-2016
|
3.50
|
Final installation of landing gear weldment screws
|
Details
|
|
|
04-23-2016
|
2.00
|
Terminal at firewall and firewall pass thru
|
Details
|
|
|
04-22-2016
|
2.50
|
Installed master contactor and firewall pass thru
|
Details
|
|
|
04-21-2016
|
2.50
|
run battery cable from aft battery location to fir
|
Details
|
|
|
04-20-2016
|
2.00
|
Forward skin roll edge and dimple
|
Details
|
|
|
04-19-2016
|
3.50
|
Prep forward baggage door
|
Details
|
|
|
04-18-2016
|
4.00
|
prepped front skin for attachment
|
Details
|
|
|
04-17-2016
|
4.50
|
Install forward wind screen roll bar
|
Details
|
|
|
04-16-2016
|
3.50
|
Panel clecoed, then riveted
|
Details
|
|
|
04-15-2016
|
5.50
|
Prep parts for instrument panel
|
Details
|
|
|
04-10-2016
|
3.50
|
Front wind screen roll bar fit and drilling
|
Details
|
|
|
04-08-2016
|
4.50
|
Prepare turtle deck skin
|
Details
|
|
|
04-07-2016
|
2.50
|
Static line install
|
Details
|
|
|
04-04-2016
|
2.50
|
Rear seat back bulkhead storage bracket gussets
|
Details
|
|
|
04-03-2016
|
4.00
|
Parking brake process #2
|
Details
|
|
|
04-02-2016
|
2.00
|
Parking brake installation ( Grove valve)
|
Details
|
|
|
03-31-2016
|
6.50
|
Rear bulkhead prep for paint and installation
|
Details
|
|
|
03-30-2016
|
3.50
|
Brake lines to landing gear fabrication
|
Details
|
|
|
03-29-2016
|
1.00
|
fuel selector cover plate and valve handle
|
Details
|
|
|
03-29-2016
|
3.50
|
Fuel pump installation with fuel filter
|
Details
|
|
|
03-29-2016
|
3.00
|
Final fuel line installation in Fuselage
|
Details
|
|
|
03-28-2016
|
6.50
|
Tank Vent lines installation with vent farings
|
Details
|
|
|
03-27-2016
|
3.00
|
Prep for top coat interior fuselage
|
Details
|
|
|
03-26-2016
|
3.50
|
Applied Polyurethane primer to fuselage interior
|
Details
|
|
|
03-25-2016
|
4.50
|
Prep for paint interior fuselage
|
Details
|
|
|
03-23-2016
|
1.50
|
temporarily installed rear bulkheads and turtle de
|
Details
|
|
|
03-21-2016
|
3.25
|
Test step and hardware for fit
|
Details
|
|
|
03-20-2016
|
2.00
|
Final installation requirements for rear throttle
|
Details
|
|
|
03-19-2016
|
3.00
|
Rear throttle quadrant pushrod and mounting plate
|
Details
|
|
|
03-18-2016
|
3.50
|
Rear seat throttle quadrant install
|
Details
|
|
|
03-18-2016
|
3.50
|
Another modification/ Map pocket
|
Details
|
|
|
03-04-2016
|
2.50
|
Painted front baggage floor, repainted seat back
|
Details
|
|
|
03-03-2016
|
3.50
|
Front baggage floor modification for master cylind
|
Details
|
|
|
03-02-2016
|
2.50
|
More parts of fuselage painting
|
Details
|
|
|
03-01-2016
|
2.50
|
Type of paint used and first parts painted
|
Details
|
|
|
02-29-2016
|
6.50
|
Battery tray modification for transponder/ELT
|
Details
|
|
|
02-28-2016
|
2.50
|
Installed and riveted Panel access door
|
Details
|
|
|
02-27-2016
|
5.50
|
Cont' panel access door
|
Details
|
|
|
02-26-2016
|
4.50
|
Rear panel access door
|
Details
|
|
|
02-25-2016
|
2.50
|
Map, or what ever pocket under switch tray
|
Details
|
|
|
02-23-2016
|
5.00
|
Baggage door battery access
|
Details
|
|
|
02-22-2016
|
5.50
|
Baggage door battery access modification
|
Details
|
|
|
02-19-2016
|
2.50
|
Battery tray assembly/ Marked shelf for access
|
Details
|
|
|
02-18-2016
|
3.00
|
Alieron trim servo brackets/ battery tray
|
Details
|
|
|
02-17-2016
|
4.00
|
Drill, install garmin pitch servo brackets
|
Details
|
|
|
02-11-2016
|
3.50
|
Final drilling of grove gear legs
|
Details
|
|
|
02-10-2016
|
2.50
|
Final check gear measurements/ Drilled one side
|
Details
|
|
|
02-09-2016
|
1.50
|
Plumb bob locations
|
Details
|
|
|
02-08-2016
|
3.50
|
Leveled Fuselage, Prep for gear attachment
|
Details
|
|
|
02-07-2016
|
2.00
|
Outboard brackets trim adjustments
|
Details
|
|
|
02-06-2016
|
1.50
|
Installed gear legs for setup
|
Details
|
|
|
01-31-2016
|
2.00
|
Grove gear mounting brackets set up
|
Details
|
|
|
12-14-2015
|
3.00
|
Disassembly of interior parts to allow for paint
|
Details
|
|
|
12-13-2015
|
2.00
|
Final adjustment of Elevator travel. ( no pics)
|
Details
|
|
|
12-12-2015
|
4.00
|
Installed rudder cables/rear seat pedal assembly
|
Details
|
|
|
12-11-2015
|
2.00
|
Pedal assembly slide lock
|
Details
|
|
|
12-06-2015
|
1.50
|
Master cylinder installation
|
Details
|
|
|
12-05-2015
|
4.50
|
Rudder/brake pedals
|
Details
|
|
|
12-04-2015
|
2.50
|
Rudder installation and tavel set
|
Details
|
|
|
12-02-2015
|
1.00
|
Additional views of control sticks, pushrods
|
Details
|
|
|
12-01-2015
|
6.00
|
Finished vertical forward mount/ forward controls
|
Details
|
|
|
11-30-2015
|
3.00
|
finished riveting elevator pushrods/bell crank
|
Details
|
|
|
11-29-2015
|
4.00
|
Seperated control lever parts
|
Details
|
|
|
11-28-2015
|
5.50
|
Set height for front vertical stabilizer. Drilled
|
Details
|
|
|
11-26-2015
|
3.50
|
setup of vertical stabilizer
|
Details
|
|
|
11-25-2015
|
1.00
|
Finished attaching horizontal to aft deck
|
Details
|
|
|
11-19-2015
|
3.00
|
Leveled fuselage, prepped for empennage install
|
Details
|
|
|
11-18-2015
|
3.00
|
Installation of remaining forward nut plates
|
Details
|
|
|
11-16-2015
|
4.00
|
Rear baggage shelf, forward bulkhead parts
|
Details
|
|
|
11-15-2015
|
5.00
|
Throttle cable ahchor/ front bulkhead covers
|
Details
|
|
|
11-12-2015
|
4.00
|
Mounting bracket for Andair Fuel Valve
|
Details
|
|
|
11-08-2015
|
3.50
|
Stiffiners to flooring/ floor panels to fuselage
|
Details
|
|
|
11-07-2015
|
3.00
|
Front, rear seatback. Foot well final assembly
|
Details
|
|
|
11-06-2015
|
2.00
|
Primed all seat back/floor parts
|
Details
|
|
|
11-05-2015
|
1.50
|
Alumi-prep/alodine, seat/floor parts
|
Details
|
|
|
11-04-2015
|
2.00
|
Scotch brite all seat parts an flooring parts
|
Details
|
|
|
11-01-2015
|
7.00
|
Main floor stiffners/ foot well parts assembly
|
Details
|
|
|
10-31-2015
|
8.00
|
floor parts installed temporarily
|
Details
|
|
|
10-30-2015
|
6.50
|
Seperated front and rear seat back parts.
|
Details
|
|
|
10-26-2015
|
6.50
|
Verifying quick build assembly from factory
|
Details
|
|
|
10-24-2015
|
1.00
|
Fuselage rolled 180 degrees, shop setup for assem
|
Details
|
|
|
10-23-2015
|
3.50
|
Checked off pic ticket for the fuselage
|
Details
|
|