KitLog pro

Powered By Kitlog Pro v2.0

Tims Web Site
Work Logs Found: 37
Category Work Time: 170 Hours
 Date
Hours
Work Log Summary

Details

 03-02-2015
3.50
Installation of elevator trim tab servo
Details
       

 03-02-2015
1.00
Finished the empennage, wrapped with clear plasti
Details

 03-01-2015
6.00
Temporarily installed both elevators on horizontal
Details
       

 02-28-2015
2.50
Rolling leading edge of right elevator
Details
       

 02-28-2015
2.00
Rolled edge of Left elevator leading edge
Details
       

 02-27-2015
2.50
Trim tab assembly and riveting
Details
       

 02-27-2015
3.00
Insallation of rear spar on Horizontal, with inbou
Details
       

 02-26-2015
1.50
Scuffed with scotch brite ready for pre treatment
Details

 02-26-2015
6.00
Attaching skin on Horizontal stabilizer
Details
       

 02-25-2015
2.50
Fit hinge to elevator trim tab, trim tab to elevat
Details
       

 02-24-2015
2.50
Finished riveting skin on Left elevator
Details
       

 02-23-2015
3.50
Left elevator assembled to frame
Details
       

 02-23-2015
2.00
Finished Main skin riveting right elevator
Details
       

 02-22-2015
8.50
Riveted Horizontal stabilizer frame with replaceme
Details
       

 02-22-2015
3.50
Right elevator frame/stiffiners on skin
Details
       

 02-22-2015
1.50
Attached skin to right elevator/ bent with 2 x 8 t
Details
       

 02-21-2015
4.00
Left Elevator frame with SB Parts
Details
       

 02-19-2015
1.00
Finished thru Primer elevator skins
Details
       

 02-17-2015
4.50
Alumi-prep, alodine, prime P60-G2
Details
       

 01-11-2015
2.50
Elevator trim tab
Details
       

 01-10-2015
6.50
Left elevator trim tab assembly
Details
       

 01-10-2015
2.50
Dissasembled Horizontal for replacement front spar
Details
       

 01-09-2015
1.50
left elevator counter weight assembly
Details

 01-05-2015
1.50
Deburred remaining left elevator parts
Details

 01-04-2015
5.50
final prep elevators before alumi-prep thru primer
Details
       

 01-01-2015
8.50
Elevator parts before corrosion protection
Details
       

 12-30-2014
5.00
Temporarily assemblied elevator frames
Details
       

 12-13-2014
6.50
Skin to rudder
Details
       

 12-12-2014
5.00
Rudder frame assembly
Details

 12-11-2014
6.00
Rudder
Details

 12-10-2014
10.00
Rudder
Details
       

 12-09-2014
7.00
Assembly of verical stabilizer
Details
       

 12-08-2014
8.00
Back to vertical stabiizer
Details

 12-06-2014
6.50
Replacement parts an primer received
Details

 12-04-2014
9.00
horizontal stabilizer
Details

 12-03-2014
8.00
continued with horizontal stab
Details
       

 12-01-2014
8.50
vertical stabalizer
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.