Date
|
Hours
|
Work Log Summary

|
Details

|
05-29-2018
|
1.00
|
Move completed
|
Details
|
|
|
05-28-2018
|
6.00
|
Moving Day
|
Details
|
|
|
05-20-2018
|
6.00
|
Coat of K38 primer to cowling, spinner installed,
|
Details
|
|
|
05-01-2018
|
2.00
|
Firewall barrier and proseal canopy seal area
|
Details
|
  |
|
02-20-2018
|
4.00
|
Forward top skin riveted!
|
Details
|
|
|
02-20-2018
|
3.50
|
|
Details
|
  |
|
02-17-2018
|
1.00
|
Forward Central Tunnel Covers
|
Details
|
|
|
02-01-2018
|
0.50
|
Installed N-numbers on tailcone
|
Details
|
|
|
01-23-2018
|
0.50
|
Vent tubing insstalled for NACA fresh air ducts
|
Details
|
  |
|
05-09-2017
|
1.50
|
Installed brake lines, new fuel pump line
|
Details
|
  |
|
05-08-2017
|
1.00
|
Riveted F-723 Cabin Frame Channel Ass'y
|
Details
|
  |
|
05-04-2017
|
1.00
|
Canopy latch installed, flap motor installed, FWD
|
Details
|
  |
|
05-03-2017
|
2.00
|
Final installed rudder pedals, parking brake/lines
|
Details
|
|
|
05-02-2017
|
2.00
|
Installed interior items (Cabin Frame, Spar/Gear r
|
Details
|
|
|
04-30-2017
|
2.00
|
Finished painting - touch up and removed masking
|
|
|
|
04-29-2017
|
10.00
|
Painted Fuselage interior JetFlex WR Basic Gray.
|
Details
|
|
|
04-27-2017
|
3.00
|
Cut flap rod holes. Central tunnel and FW adels.
|
Details
|
|
|
04-26-2017
|
1.00
|
Removed all cabin items, getting ready for paint.
|
|
 |
|
04-23-2017
|
2.50
|
Prosealed NACA vents, main fuel line from pump to
|
Details
|
|
|
04-22-2017
|
8.00
|
Fuel Line Fabrication
|
Details
|
 |
|
04-21-2017
|
1.00
|
Fuel Line Fabrication started
|
Details
|
|
|
04-19-2017
|
1.00
|
Drilled and riveted rudder cable fairing
|
Details
|
 |
|
04-16-2017
|
6.00
|
-4 (3003) vent and brake lines fabricated.
|
Details
|
|
|
04-12-2017
|
3.00
|
Throttle/Prop/Mixt cable pass thrus drilled.
|
Details
|
|
|
04-11-2017
|
1.00
|
F-774 aft top skin riveting complete
|
Details
|
|
|
04-10-2017
|
0.50
|
Brake Cable Mount Fabricated
|
Details
|
  |
|
04-09-2017
|
5.00
|
F774 Top Skin Riveted
|
Details
|
 |
|
04-01-2017
|
9.00
|
Finished Riveting aft fuselage - all and ADAHRS mo
|
Details
|
|
|
03-31-2017
|
2.00
|
Riveting on F775 Rear Top Skin
|
|
  |
|
03-19-2017
|
1.00
|
Rudder pedals, helper springs added, AN fittings i
|
Details
|
 |
|
03-17-2017
|
0.50
|
Rudder Pedals - sprayed additional coat of white
|
Details
|
  |
|
03-17-2017
|
0.50
|
Cabin Frame - drilled pilot holes on frame and aft
|
Details
|
 |
|
03-15-2017
|
3.00
|
Cabin Frame Support - drilled small brackets/brace
|
Details
|
|
|
03-15-2017
|
3.00
|
Cabin Frame - Drilled frame to main brackets, CSK
|
Details
|
|
|
03-14-2017
|
2.50
|
Cabin Frame - Drilled brackets to fuse and deburre
|
Details
|
|
|
03-10-2017
|
2.00
|
Cabin Frame - completed primary structure
|
Details
|
|
|
03-09-2017
|
2.50
|
Cabin Frame - deburred holes and riveted joint pla
|
Details
|
|
|
03-08-2017
|
3.50
|
Cabin Frame - redid edges on all flanges. Made 7/
|
Details
|
  |
|
03-07-2017
|
2.00
|
Cabin Frame - drilled strips & splice plate to AFT
|
Details
|
|
|
03-06-2017
|
2.50
|
Cabin Frame - drilled Access holes and deburred al
|
Details
|
  |
|
03-05-2017
|
1.00
|
Cabin Frame filing for alignment. Fabricated jig.
|
Details
|
 |
|
03-04-2017
|
1.00
|
Removed extra tabs from weldment and filed.
|
Details
|
  |
|
03-03-2017
|
2.00
|
Rudder Pedals - riveted and brake arms drilled
|
Details
|
|
|
03-02-2017
|
2.50
|
Rudder Pedals - drilling, deburr and prime.
|
Details
|
  |
|
03-01-2017
|
2.00
|
Rudder Pedals - deburring and cabin frame angle de
|
Details
|
  |
|
02-28-2017
|
1.50
|
Cabin Frame mounts cut and sanded. Rudder pedal d
|
Details
|
 |
|
02-27-2017
|
3.00
|
Finished deburring of flanges
|
Details
|
|
|
02-26-2017
|
1.50
|
Deburring of flanges
|
Details
|
  |
|
02-25-2017
|
2.00
|
Cut lightening areas in FWD flanges.
|
Details
|
|
|
02-24-2017
|
4.00
|
Drilled all remaining holes for lightening, measur
|
Details
|
 |
|
02-22-2017
|
3.00
|
Made small side pieces and drilled mounting holes
|
Details
|
  |
|
02-21-2017
|
1.00
|
fabricated .020 spacers and drilled
|
Details
|
  |
|
02-16-2017
|
1.00
|
Mounted seats and FWD Bulkhead, started cowl mount
|
Details
|
 |
|
02-15-2017
|
4.50
|
Drilled all seatback holes, deburred, primed & riv
|
Details
|
|
|
02-14-2017
|
3.00
|
Cut 2.5" holes in support. Cut/Deburred tall angl
|
Details
|
  |
|
02-13-2017
|
1.50
|
Filed and Deburred seatback angles.
|
Details
|
  |
|
02-12-2017
|
4.00
|
Riveted F-768-A/L and F-643 to F768-A. Made canop
|
Details
|
|
|
02-10-2017
|
4.00
|
Assembled Panel and FWD Deck. Riveted F-745 angle
|
Details
|
  |
|
02-09-2017
|
3.00
|
New F-745-R fabricated, panel nutplates installed.
|
Details
|
  |
|
02-08-2017
|
2.00
|
Finished deburring panel and riveted angles/nutpla
|
Details
|
  |
|
02-07-2017
|
2.00
|
CSK panel reinf and deburred flanges. Pilot holes
|
Details
|
 |
|
02-06-2017
|
3.00
|
Fabricated /Drilled Canopy hinge blocks
|
Details
|
  |
|
02-05-2017
|
5.00
|
Completed deburring of FWD bulkhead parts.
|
Details
|
  |
|
01-31-2017
|
2.50
|
Deburring of FWD bulkhead parts.
|
|
  |
|
01-30-2017
|
1.50
|
Drilled T/U seals, drilled NP holes for F745 panel
|
Details
|
 |
|
01-29-2017
|
1.00
|
Removed FWD Bulkhead Assembly. Measured C-617/C-1
|
Details
|
  |
|
01-28-2017
|
4.00
|
Deburred T/U seal & Panel Reinf. Drilled Panel fla
|
Details
|
  |
|
01-27-2017
|
2.50
|
F-697 Hat Section Cut/Drilled & F643 center rib an
|
Details
|
 |
|
01-26-2017
|
2.00
|
Drilled & Cut Angles for T/U seal and panel reinf
|
Details
|
  |
|
01-25-2017
|
4.50
|
Fab'd seatback angles, tip up seal, panel refinf a
|
Details
|
  |
|
01-24-2017
|
1.50
|
Riveted vent bracket and F-721B FWD canopy decks
|
Details
|
|
|
01-23-2017
|
1.00
|
Final fit of vent bracket, nutplate holes drilled
|
Details
|
|
|
01-22-2017
|
1.50
|
Fabricated/Drilled air vent supports to side skins
|
Details
|
 |
|
01-21-2017
|
1.50
|
jigged and drilled new F745 ribs/brackets to F786
|
Details
|
|
|
01-19-2017
|
1.00
|
2 deg bend in F768 subpanel. Fabricated angle bra
|
Details
|
 |
|
01-18-2017
|
1.50
|
Trimmed F-745-L/R ribs and measured/drilled new lo
|
Details
|
  |
|
01-13-2017
|
1.50
|
Carbon Panel Trimming and Initial Fit/Install
|
Details
|
|
|
01-12-2017
|
1.00
|
Carbon Panel Subframe - inserts drilled
|
Details
|
  |
|
12-14-2016
|
1.00
|
Riveted F-721C/D angles to F-721A fwd canopy decks
|
Details
|
|
|
12-13-2016
|
1.00
|
Fabricated F-703C and F-721C/D angles
|
Details
|
  |
|
12-12-2016
|
1.00
|
Rivated F-704K cap strips
|
Details
|
|
|
12-11-2016
|
5.00
|
Canopy Decks and F757s riveted. Tail removed.
|
Details
|
|
|
12-08-2016
|
8.00
|
Control System Installed
|
Details
|
|
|
11-30-2016
|
1.00
|
Deburred, primed and riveted small elevator pushro
|
Details
|
  |
|
11-29-2016
|
1.50
|
Drilled Tailwheel Assembly to Rod, installed bolts
|
Details
|
|
|
11-28-2016
|
0.50
|
Final wire to rudder nav/strobe and elevator pushr
|
Details
|
  |
|
11-26-2016
|
3.00
|
Reamed new tailwheel assembly on lathe
|
Details
|
 |
|
11-20-2016
|
0.50
|
Reinstalled empennage
|
Details
|
|
|
11-19-2016
|
3.00
|
Installed FWD seat floors and flap assembly, bagga
|
Details
|
|
|
11-18-2016
|
4.00
|
Wiring runs continued: ELT antenna, pitot/static/
|
Details
|
|
|
11-17-2016
|
3.00
|
Wiring Runs: Pitch Trim, Nav/Strobe/ADSB Ant
|
Details
|
|
|
11-16-2016
|
4.00
|
Riveted all cabin small parts, riveted seat hinges
|
Details
|
|
|
11-15-2016
|
3.00
|
Primed all forward/top parts, initial riveting and
|
Details
|
|
|
11-14-2016
|
1.00
|
Installed forward lower conduit
|
Details
|
 |
|
11-13-2016
|
3.00
|
Aft conduit mounts fabricated and drilled
|
Details
|
 |
|
11-12-2016
|
1.00
|
Deburring forward cabin components - finished!
|
Details
|
  |
|
11-11-2016
|
3.00
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-10-2016
|
1.00
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-09-2016
|
5.50
|
Deburring forward cabin components - cont'd
|
Details
|
  |
|
11-08-2016
|
1.00
|
Deburring forward cabin components
|
Details
|
  |
|
11-06-2016
|
2.00
|
Shoulder harness - F-706/F-751/F-652 UHMW pass thr
|
Details
|
  |
|
11-05-2016
|
2.00
|
Top skin edge deburring - both skins
|
Details
|
  |
|
11-03-2016
|
1.00
|
Forward cabin - underseat/baggage conduit drilled
|
Details
|
  |
|
11-01-2016
|
2.00
|
Floor - seatback hinge fabrication.
|
Details
|
  |
|
10-29-2016
|
2.00
|
Forward tunnel cover fabrication, drilling and csk
|
Details
|
 |
|
10-28-2016
|
2.00
|
Andair Fuel Valve work.
|
Details
|
|
|
10-27-2016
|
2.00
|
Drilled new baggage floors. Drilled center flap b
|
Details
|
|
|
10-24-2016
|
3.00
|
Flap housing drilled, WD-613 flap weldment holes r
|
Details
|
  |
|
10-23-2016
|
1.00
|
Drilled tailcone inspection panels and installed n
|
Details
|
  |
|
10-22-2016
|
6.00
|
ELT bracket drilled to mount/fuselage, F-706 nutpl
|
Details
|
 |
|
10-21-2016
|
1.00
|
ELT bracket drilled to mount/fuselage
|
Details
|
|
|
10-18-2016
|
1.00
|
Drilled fuel pump/center covers - final fit
|
Details
|
 |
|
10-17-2016
|
1.50
|
Drilled fuel pump covers
|
Details
|
  |
|
10-16-2016
|
2.00
|
Baggage Bulkhead Covers Drilled and Trimmed
|
Details
|
 |
|
10-15-2016
|
1.50
|
Rudder Stops adjusted and riveted.
|
|
|
|
10-14-2016
|
2.00
|
Drilled 2 aft skins, drilled FWD top skin, F-707B
|
Details
|
|
|
10-11-2016
|
1.50
|
Drilled aft top stringers F-786L/R. Drilled and r
|
Details
|
  |
|
10-10-2016
|
2.00
|
Riveted F-781 VS attach plate and filed elevator s
|
Details
|
|
|
10-09-2016
|
3.00
|
Finished VS Mounting
|
Details
|
|
|
10-08-2016
|
2.00
|
VS initial alignment and drilling aft spar to F-71
|
Details
|
  |
|
10-07-2016
|
3.00
|
Drilled HS to fuselage - fore and aft spars.
|
Details
|
|
|
10-05-2016
|
1.00
|
FWD upper fuselage structure drilled
|
Details
|
|
|
10-04-2016
|
0.50
|
Drilled upper fwd fuselage. Riveted F-902s to long
|
Details
|
  |
|
10-01-2016
|
2.00
|
Riveted F-695 gussets. Drilled 2 aft F-695s to bu
|
Details
|
|
|
09-30-2016
|
2.50
|
Drilled F-695 gussets to longerons and FW
|
Details
|
 |
|
09-29-2016
|
0.50
|
Finished riveting aft deck and deburred F-757 hole
|
Details
|
  |
|
09-26-2016
|
2.00
|
F-757s drilled, aft deck deburred and riveted
|
Details
|
|
|
09-25-2016
|
3.00
|
Fabricated and drilled new F-712 aft elev stop and
|
Details
|
|
|
09-24-2016
|
1.50
|
Drilled FWD95 elevator stop and deburred F-695s
|
Details
|
  |
|
09-23-2016
|
3.00
|
Finished Fuselage Riveting and Flipped the Canoe!
|
Details
|
|
|
09-22-2016
|
3.00
|
Riveted FWD fuselage remaining and center section
|
Details
|
 |
|
09-18-2016
|
0.50
|
Finished riveting two outboard floor stiffeners wi
|
Details
|
 |
|
09-17-2016
|
1.50
|
Firewall prep and forward section riveting.
|
Details
|
  |
|
09-16-2016
|
3.00
|
Forward side skins riveted to angles and F-772 flo
|
Details
|
|
|
09-15-2016
|
2.00
|
More Forward Section riveting.
|
Details
|
|
|
09-14-2016
|
2.50
|
Riveting forward fuselage
|
Details
|
  |
|
09-13-2016
|
3.00
|
F-704 riveted - #30 and #40 entire length. F706 t
|
Details
|
  |
|
09-12-2016
|
2.00
|
Initial forward section riveting
|
Details
|
|
|
09-11-2016
|
6.00
|
Moved fuselage components to garage and re-assembl
|
Details
|
|
|
09-10-2016
|
5.00
|
Primed all remaining forward fuselage parts and mo
|
Details
|
|
|
09-09-2016
|
4.00
|
Deburred and dimpled F-770 side skins, and upper f
|
Details
|
|
|
09-08-2016
|
2.50
|
F-772 forward skin deburred, rolled edges on F-772
|
Details
|
  |
|
09-07-2016
|
3.50
|
Countersunk both F-718 longerons
|
Details
|
|
|
09-06-2016
|
1.00
|
Riveted F-902 to F-7101 and F-684 gussets
|
Details
|
|
|
09-05-2016
|
6.00
|
Deburring, Dimpling and Final Fabrication of Aft D
|
Details
|
|
|
09-04-2016
|
2.00
|
Deburring, Dimpling and Fabrication of Aft Deck it
|
Details
|
  |
|
09-03-2016
|
8.00
|
Deburring/Dimpling/CSK and priming
|
Details
|
|
|
09-02-2016
|
3.50
|
Deburring/Dimpling
|
Details
|
 |
|
09-01-2016
|
3.00
|
Disassembly and Deburring Begins
|
Details
|
 |
|
08-26-2016
|
2.00
|
Drilled Skybolt FW fastener mounting strips. Dril
|
Details
|
|
|
08-22-2016
|
1.00
|
Began FW strips for Skybolt fasteners
|
Details
|
  |
|
08-21-2016
|
2.00
|
Baggage area bulkhead - fab of lower flanges and a
|
Details
|
|
|
08-19-2016
|
2.00
|
Redo of F-710-B angle
|
Details
|
|
|
08-18-2016
|
3.50
|
Fabricated/Installed F-782D angles to forward cove
|
Details
|
|
|
08-17-2016
|
1.00
|
Drilled F-6115 center rudder bearing block to rudd
|
Details
|
|
|
08-16-2016
|
2.00
|
Rudder Blocks Drilled
|
Details
|
|
|
08-14-2016
|
3.00
|
Forward stiffeners, and CSK #12 hole for tank brac
|
Details
|
|
|
08-13-2016
|
2.00
|
Tank Bracket Installed
|
Details
|
|
|
08-12-2016
|
2.00
|
Fabricated F-796C/D brackets
|
Details
|
  |
|
08-11-2016
|
4.00
|
Final fabrication and drilling of F-684 gussets an
|
Details
|
|
|
08-10-2016
|
2.50
|
F902's installed, lower longerons/gear webs drille
|
Details
|
|
|
08-08-2016
|
1.00
|
Fabricated F-684 gussets
|
Details
|
 |
|
08-08-2016
|
1.00
|
Drilled F717 lower longeron to WD-603 weldment to
|
Details
|
|
|
08-07-2016
|
1.50
|
Initial Drilling of lower longeron to wedment.
|
Details
|
  |
|
08-06-2016
|
2.00
|
Drilled fuel vents, fuel line holes, radiused bott
|
Details
|
  |
|
08-05-2016
|
2.00
|
Twisted lower longerons and marked, gear webs dril
|
Details
|
|
|
08-03-2016
|
3.00
|
F719 stiffeners completed, gear web started, lower
|
Details
|
|
|
08-02-2016
|
2.00
|
New F719s drilled and clips started for fore/aft
|
Details
|
  |
|
08-01-2016
|
2.00
|
F-719 stiffener work
|
Details
|
  |
|
07-31-2016
|
10.00
|
Firewall drilled to skins, longerons to weldments
|
Details
|
|
|
07-30-2016
|
1.50
|
Longeron twist tweaking and mounted firewall
|
Details
|
|
|
07-29-2016
|
2.50
|
Trimmed longeron ends; installed F904L attach stri
|
Details
|
|
|
07-28-2016
|
1.50
|
Longeron drilling complete to firewall.
|
Details
|
|
|
07-27-2016
|
3.00
|
Drilled Longerons F-704 and aft
|
Details
|
|
|
07-07-2016
|
2.00
|
Match drilled all holes aft of and including F-704
|
Details
|
 |
|
07-06-2016
|
2.50
|
Tweaked fwd longeron bends and F770 conical bends
|
Details
|
  |
|
07-05-2016
|
2.50
|
Conical Bends at Aft/Center fuselage interface, ad
|
Details
|
|
|
07-03-2016
|
2.00
|
Clecoed F770 side skins to fuselage, clamped longe
|
Details
|
  |
|
06-30-2016
|
2.00
|
Aileron Trim Kit assembled/test mounted
|
Details
|
|
|
06-29-2016
|
2.00
|
Riveted F715 end seat ribs and tested longeron
|
Details
|
|
|
06-28-2016
|
2.50
|
Deburred/dimpled F715 seat ribs and F776 skin, sea
|
Details
|
  |
|
06-27-2016
|
0.50
|
Reorganized shop and reconfigured sawhorses
|
Details
|
|
|
06-27-2016
|
2.00
|
Drilled F715 ribs to F776/F704/H, drilled floor sk
|
Details
|
|
|
06-26-2016
|
4.50
|
Riveted F776 skin to center section structure
|
Details
|
|
|
06-23-2016
|
2.00
|
AN3/AN4 bolts torqued to F704 assembly, clecoed F7
|
Details
|
|
|
06-22-2016
|
4.00
|
Riveted center section structure.
|
Details
|
|
|
06-21-2016
|
1.50
|
Riveted all NPs on F716s and forward cover support
|
Details
|
  |
|
06-20-2016
|
3.50
|
Prepped and primed all center section parts
|
Details
|
|
|
06-19-2016
|
2.00
|
VHF comm mounts fabricated. F776 debur & dimple
|
Details
|
 |
|
06-18-2016
|
0.50
|
Deburred F776 edges
|
Details
|
  |
|
06-17-2016
|
2.00
|
Misc center section tasks
|
Details
|
  |
|
06-16-2016
|
3.00
|
Drilled Crotch Strap Brackets
|
Details
|
|
|
06-15-2016
|
1.00
|
Fabricated and drilled F623A AFT straps.
|
Details
|
|
|
06-14-2016
|
1.50
|
Drilled, Cut, Deburred F-623 holes and ends.
|
Details
|
  |
|
06-13-2016
|
4.00
|
Drilled F704H to F704 assembly. F623s started
|
Details
|
|
|
06-12-2016
|
5.50
|
Deburred all baggage ribs, flanged and fluted all
|
Details
|
 |
|
06-11-2016
|
1.50
|
Deburred 4 F716 ribs, drilled holes for forward co
|
Details
|
|
|
06-10-2016
|
5.00
|
Control Mount lightening areas, 6 F715/F716 ribs d
|
Details
|
  |
|
06-09-2016
|
1.00
|
F704 Work - drilled control mounts and cover suppo
|
Details
|
 |
|
06-05-2016
|
1.50
|
Drilled control column mounts - initial hole, acce
|
Details
|
 |
|
06-04-2016
|
0.75
|
Cut 1.5" holes in the 4 center F-716 ribs and cut
|
Details
|
  |
|
06-02-2016
|
3.00
|
Aft Fuselage riveting completed
|
Details
|
|
|
06-01-2016
|
3.50
|
Aft Fuselage riveting with Ralph - lower areas
|
Details
|
  |
|
05-27-2016
|
1.00
|
More adjustment to F712/711 - reclecoed
|
Details
|
|
|
05-26-2016
|
3.00
|
Riveted F779, F711, F712 and bolted WD-409
|
Details
|
|
|
05-25-2016
|
2.00
|
Primed aft skins and misc parts
|
Details
|
  |
|
05-23-2016
|
4.00
|
F773 R and L tailcone sideskins deburred and dimpl
|
Details
|
  |
|
05-22-2016
|
0.50
|
Rudder Cable Fairings cut, shaped and deburred
|
Details
|
  |
|
05-19-2016
|
2.00
|
Aft bottom skin deburred edges, drilled transponde
|
|
|
|
05-18-2016
|
2.00
|
Deburred and dimpled all Jstringers, F779 skin
|
Details
|
  |
|
05-17-2016
|
2.00
|
Deburred and dimpled all bulkhead holes
|
Details
|
  |
|
05-15-2016
|
2.50
|
Drilled Static Ports and Disassembled entire aft f
|
Details
|
  |
|
05-14-2016
|
1.50
|
J-stringers drilled
|
Details
|
|
|
05-13-2016
|
1.00
|
AN174-14A Close Tolerance Bolt for WD-409
|
Details
|
  |
|
05-12-2016
|
1.00
|
F712 - clearanced aft tabs and more adjusting. F6
|
Details
|
  |
|
05-11-2016
|
2.00
|
F711 and F712 flanging
|
Details
|
  |
|
05-10-2016
|
2.00
|
Drilled lower J-stringers in aft most tail
|
Details
|
  |
|
05-09-2016
|
4.00
|
WD-409 and tailspring drilled to final size
|
Details
|
 |
|
05-08-2016
|
2.00
|
Clecoed entire aft fuselage
|
|
|
|
05-07-2016
|
2.00
|
WD-409 and F711/712/779 measurement/fitting
|
Details
|
|
|
05-06-2016
|
3.00
|
Finished riveting F705, flap bushings drilled, F70
|
Details
|
|
|
05-04-2016
|
2.00
|
Riveted all AFT bulkheads
|
Details
|
 |
|
05-03-2016
|
3.00
|
Primed alll bulkheads
|
Details
|
|
|
05-02-2016
|
8.00
|
F705 Final prep
|
Details
|
|
|
05-01-2016
|
4.00
|
F705 continued - finished F634s, and deburred all
|
Details
|
  |
|
04-30-2016
|
2.00
|
Drilled F634 lap belt anchors
|
Details
|
|
|
04-29-2016
|
2.00
|
F705H spacer drilled
|
Details
|
  |
|
04-28-2016
|
1.50
|
F705 C/B Drilled
|
Details
|
  |
|
04-26-2016
|
1.00
|
Began F-705 and cut F705-B/K
|
Details
|
|
|
04-25-2016
|
3.00
|
Finished and debured/fluted F-706
|
Details
|
  |
|
04-24-2016
|
2.00
|
F706 and autopilot bracket started
|
Details
|
|
|
04-22-2016
|
1.00
|
F729-A/B/C and F-728-A/B fab
|
Details
|
 |
|
04-21-2016
|
1.00
|
Finished F707 and F708 including deburr and flutin
|
Details
|
 |
|
04-20-2016
|
2.00
|
Drilled F707 and F708 including rudder bushing hol
|
Details
|
  |
|
04-19-2016
|
3.00
|
Drilled F711-A/B/C/D, deburred/finished
|
Details
|
|
|
04-18-2016
|
5.00
|
Aft fuselage bulkheads - prep
|
Details
|
 |
|
04-14-2016
|
2.50
|
Deburred and Finished all J-channels
|
Details
|
 |
|
04-13-2016
|
1.00
|
Cut J-stringers
|
Details
|
 |
|
04-12-2016
|
1.50
|
Riveted new F601Js. Firewall done!
|
Details
|
|
|
04-05-2016
|
3.00
|
FW riveting - all except F-601J
|
Details
|
|
|
04-04-2016
|
2.00
|
Primed and top coat of FW angle and doublers
|
|
  |
|
04-03-2016
|
7.00
|
Deburred/Dimpled SS FW, made another F601J-L
|
Details
|
  |
|
04-02-2016
|
7.50
|
Deburred and prepped, countersunk all angles/doubl
|
Details
|
  |
|
03-28-2016
|
1.50
|
Disassembled FW, csk SS nutplate holes, fabricated
|
Details
|
  |
|
03-20-2016
|
3.50
|
Firewall - final item prep
|
Details
|
|
|
03-18-2016
|
5.00
|
Firewall Misc: Heater Valve, Transducer Manifold,
|
Details
|
|
|
03-17-2016
|
1.00
|
Parking Brake Mount Fabrication - completed
|
Details
|
 |
|
03-15-2016
|
2.00
|
Parking Brake Mount Fabrication
|
Details
|
 |
|
03-14-2016
|
2.50
|
FW - completed match drilling including F-601J ang
|
Details
|
|
|
03-11-2016
|
2.50
|
Match drilled FW and F601J fabrication
|
Details
|
|
|
03-08-2016
|
3.00
|
Completed inventory and organization
|
Details
|
  |
|
03-07-2016
|
5.00
|
Fuselage Arrived and Inventory
|
Details
|
|
|
02-20-2016
|
1.50
|
Pre-prepped Parts for Firewall
|
Details
|
 |
|
02-19-2016
|
2.00
|
Deburring F721-B Aft Canopy Decks and F714 Aft Dec
|
Details
|
|
|
02-18-2016
|
5.00
|
New RIGHT Longeron Completed
|
Details
|
|
|
02-14-2016
|
1.50
|
Downward Bend LEFT Longeron
|
Details
|
  |
|
02-09-2016
|
4.00
|
Final finishing of R & L shallow bends and drilled
|
Details
|
|
|
02-08-2016
|
5.00
|
Finished most of LEFT bend and started RIGHT bend,
|
Details
|
|
|
02-07-2016
|
3.00
|
Shallow Bend in LEFT Longeron
|
Details
|
 |
|
02-01-2016
|
3.00
|
F704 Final Finishing
|
Details
|
|
|
01-28-2016
|
0.50
|
F-704 Nutplates riveted to center section x 18
|
Details
|
  |
|
01-27-2016
|
2.00
|
F704 Center Section Riveting
|
Details
|
|
|
01-27-2016
|
3.00
|
Aft deck relief notches in longerons & F704M reinf
|
Details
|
|
|
01-26-2016
|
2.00
|
F704M -R/L stiffeners fabricated, drilled, deburre
|
Details
|
  |
|
01-25-2016
|
4.00
|
F704 Center Section - Initial Drilling
|
Details
|
|
|
01-23-2016
|
1.00
|
More aft longeron filing/dressing
|
Details
|
  |
|
01-18-2016
|
2.00
|
Cut aft longeron areas - bulkhead interface
|
Details
|
|
|
01-16-2016
|
2.00
|
Longerons
|
Details
|
  |
|
01-08-2016
|
1.00
|
Ordered Fuselage!
|
Details
|
  |