Powered By Kitlog Pro v2.0
RV-7 Some assembly required
RV-7
Fuselage
Work Logs Found:
392
Category Work Time:
782 Hours
Date
Hours
Work Log Summary
Details
09-19-2018
1.00
Finished middle decks
Details
08-29-2018
2.00
Middle deck riveting
Details
08-26-2018
0.10
Reveal, La Fuselage !
Details
08-26-2018
1.00
Middle deck
Details
08-26-2018
1.00
Finishing the cabin frame
Details
08-26-2018
1.00
Finishing F-787 Stiffener web
Details
08-25-2018
1.00
Shoulder harness anchor attachments
Details
08-25-2018
1.50
Finishing F-705 riveting
Details
08-23-2018
1.50
Started the finishing F-705 riveting
Details
08-22-2018
3.00
Top skin riveting
Details
08-21-2018
3.00
Top skin riveting
Details
08-20-2018
3.00
Top skin riveting
Details
08-19-2018
2.00
Top skin riveting
Details
08-19-2018
2.00
Prep for top skin riveting
Details
08-08-2018
1.00
Tested new-old squeezer
Details
08-02-2018
2.00
Console adjustment
Details
05-13-2018
1.50
Installed the rear elevator pushrod
Details
05-11-2018
1.00
Drilled out another floor panel
Details
05-08-2018
1.50
Drilled out a floor panel
Details
05-06-2018
2.00
Empennage hardware
Details
05-02-2018
2.00
Drilling vertical stabilizer - 6
Details
05-01-2018
2.00
Drilling vertical stabilizer - 5
Details
05-01-2018
1.00
Drilling vertical stabilizer - 4
Details
05-01-2018
2.00
Drilling vertical stabilizer - 3
Details
04-30-2018
2.00
Drilling vertical stabilizer - 2
Details
04-30-2018
2.00
Drilling vertical stabilizer - 1
Details
03-10-2018
2.00
Primed and painted new tunnel cover
Details
03-07-2018
2.00
New flap motor
Details
02-11-2018
4.00
Decks in baggage area
Details
02-05-2018
1.00
F-785A Backrest Brace and cross bar
Details
02-04-2018
4.00
Deburred, primed and painted Almost RV-14
Details
01-28-2018
1.50
Almost RV-14 install - 10
Details
01-27-2018
1.50
Almost RV-14 install - 9
Details
01-27-2018
2.00
Almost RV-14 install - 8
Details
01-22-2018
2.00
Almost RV-14 install - 7
Details
01-21-2018
3.50
Almost RV-14 install - 6
Details
01-20-2018
1.50
Almost RV-14 install - 5
Details
01-19-2018
1.00
Almost RV-14 install - 4
Details
01-19-2018
2.00
Almost RV-14 install - 3
Details
01-19-2018
2.00
Almost RV-14 install - 2
Details
01-19-2018
2.00
Almost RV-14 install - 1
Details
01-08-2018
1.00
Riveted the elevator pushrod
Details
01-06-2018
2.00
Primed the elevator pushrod
Details
08-14-2017
1.00
Made slot for locking mechanism
Details
08-05-2017
4.00
Riveted on the front decks
Details
07-30-2017
3.00
Drilled the panel attach angles
Details
07-16-2017
4.00
Finished new the front decks
Details
07-15-2017
4.00
New front decks
Details
05-23-2017
0.00
Ordered new front decks
Details
05-18-2017
0.50
Ball Stud Mount
Details
05-09-2017
2.00
Lowered the fuselage cradle
Details
05-07-2017
2.00
Put fuselage on cradle
Details
04-30-2017
2.00
Fuselage cradle
Details
04-26-2017
1.50
Primed and painted F-705 angles
04-23-2017
2.00
New F-705 angles
Details
04-22-2017
4.00
Riveted forward decks
Details
04-22-2017
0.50
Cabin looking finished
Details
04-20-2017
2.00
Painted F-704
Details
04-17-2017
2.50
Strut mounting hardware
Details
04-17-2017
1.00
Riveted on the panel angles on the forward decks
Details
04-11-2017
0.50
Stripped canopy deck
Details
04-08-2017
1.00
Riveted doublers and stiffeners to aft top skin
Details
04-06-2017
0.50
Aft fuselage conduits
Details
04-04-2017
1.00
Deburring canopy braces
Details
04-02-2017
1.00
ELT doubler riveted
Details
04-01-2017
2.00
Riveted the AHRS rib
Details
03-31-2017
2.50
Primed and painted aft top skin
Details
03-30-2017
1.50
Deburred the canopy braces
Details
03-27-2017
1.50
Primed the click-bond areas
Details
03-26-2017
2.00
Prepping Aft Top Skin
Details
03-25-2017
1.50
Click-bond anchors
Details
03-22-2017
1.50
Details
03-20-2017
1.00
Riveted the canopy frame sides
Details
03-19-2017
4.00
Primed the canopy frame components
Details
03-18-2017
6.00
Drilled the canopy frame
Details
03-17-2017
2.50
Shaping the canopy frame
Details
03-16-2017
2.00
Deburring the canopy frame
Details
03-15-2017
2.00
Adjusted the canopy and skins for clearance
Details
03-14-2017
2.00
Assembled the forward structure
Details
03-13-2017
1.50
Riveting sub-structure
Details
03-12-2017
4.00
Hinge block drilling
Details
03-12-2017
2.00
Drilling hinges
Details
03-08-2017
2.00
Hinge drilling strategy
Details
03-04-2017
1.50
Panel angles
Details
03-03-2017
2.00
Panel alignment
Details
02-26-2017
1.00
Re-evaluate canopy hinges
Details
02-25-2017
2.00
Canopy hinge drilling
Details
02-19-2017
3.00
Primed decks and frame support parts
Details
02-18-2017
3.00
Decks and F-704 covers
Details
02-17-2017
5.00
Primed and paint day
Details
02-16-2017
1.00
Test fitted the F-789 pushrod
Details
02-16-2017
2.00
Deburring and prepping parts for priming
Details
02-15-2017
2.00
Adjusted the co-pilot stick
Details
02-14-2017
1.00
Started the F-789 elevator pushrod
Details
02-13-2017
1.00
Vent line screws
Details
02-13-2017
1.00
Elevator bell crank
Details
02-12-2017
1.00
Shoulder harness cable
Details
02-11-2017
2.00
Static line install and routing
Details
02-11-2017
1.00
GMU-22 harness and static line
Details
02-08-2017
2.00
Exit brake line
Details
02-06-2017
1.50
Booster pump to firewall fuel line
Details
02-04-2017
0.50
Checking rivet head clearance.
Details
02-02-2017
1.50
Painting canopy release rods and delrin bearings
Details
01-31-2017
1.50
Riveted panel angles
Details
01-30-2017
1.50
Latch and panel angles
Details
01-29-2017
2.50
Center panel painting
Details
01-29-2017
1.00
Cabin frame channel and more
Details
01-28-2017
2.00
Fuel line support priming
Details
01-27-2017
2.00
Canopy latch handle
Details
01-26-2017
1.50
Forward fuselage channel replacement
Details
01-22-2017
2.00
Canopy release mechanism
Details
01-21-2017
3.50
Canopy hinge
Details
01-20-2017
2.00
Canopy hinge
Details
01-19-2017
1.50
Canopy hinge
Details
01-18-2017
2.00
Sub-pane assembly
Details
01-17-2017
2.00
Fuel pump support
Details
01-15-2017
3.00
Sub-pane assembly
Details
01-15-2017
3.00
Canopy latch handle
Details
01-14-2017
4.50
Center Channel
Details
01-13-2017
1.00
Center Channel
Details
01-12-2017
2.00
Center Channel
Details
01-11-2017
1.50
Canopy latch handle
Details
01-10-2017
2.50
Canopy latch handle
Details
01-09-2017
2.00
Static line routing
Details
01-08-2017
3.00
Fuel line routing
Details
01-07-2017
3.00
Cabin frame channel
Details
01-06-2017
2.00
Canopy latch weldments
Details
01-06-2017
2.00
Cabin frame mounting
Details
01-05-2017
2.00
Cabin frame mounting
Details
01-03-2017
3.00
Cabin frame trimming
Details
01-02-2017
3.00
Cabin frame riveting
Details
01-01-2017
2.00
Cabin frame riveting
Details
12-31-2016
3.50
Cabin frame priming
Details
12-30-2016
1.50
Rudder pedals
Details
12-30-2016
2.00
Even more cabin frame
Details
12-29-2016
3.50
Cabin frame
Details
12-28-2016
3.00
Rudder pedal weldments
Details
12-28-2016
1.50
Cabin frame
Details
12-27-2016
2.00
Cabin frame
Details
12-26-2016
1.50
Cabin frame
Details
12-25-2016
1.50
Forward fuselage ribs
Details
12-20-2016
1.00
Rudder pedals
Details
12-19-2016
1.00
Rudder pedal
Details
12-18-2016
2.00
Rudder pedal
Details
12-17-2016
0.00
Fuel lines
Details
12-17-2016
2.00
Firewall
Details
12-15-2016
1.00
Rudder pedal
Details
12-14-2016
0.50
Disassembled the rudder/brake pedals assembly,
Details
12-14-2016
0.00
Andair replacement parts
Details
12-13-2016
2.00
Sub-panel
Details
12-12-2016
1.50
Fuel lines
Details
12-09-2016
2.50
Cabin cover plates
Details
12-08-2016
1.00
Cabin cover plates
Details
12-05-2016
2.00
Finish kit is here
Details
12-03-2016
2.00
Fuel selector valve plate
Details
11-27-2016
2.50
Sub-panel
Details
11-23-2016
1.00
Cabin center cover
Details
11-21-2016
1.50
Cabin center cover
Details
11-20-2016
1.50
Cabin center cover
Details
11-19-2016
2.00
S-tube for fuel selector
Details
11-17-2016
1.00
Fuel pump fitting
Details
11-16-2016
0.50
Fuel pump with cosmetic damage.
Details
11-12-2016
1.00
Fuselage cradle
Details
11-09-2016
1.50
Fuselage cradle
Details
11-07-2016
1.50
F-709 bulkhead
Details
11-05-2016
2.00
Fuselage cradle
Details
11-03-2016
1.00
Riveted the left baggage floor. Cabin looks done
Details
11-01-2016
0.50
Storage space template
Details
10-28-2016
1.50
AHRS (or ELT) bracket
Details
10-26-2016
0.50
Cabin nearly done
Details
10-23-2016
1.50
Right floor riveting
Details
10-22-2016
1.50
Finished seat hinges
Details
10-21-2016
1.00
Riveted wear blocks
Details
10-20-2016
2.50
Prosealed conduits
Details
10-18-2016
1.00
Riveting cabin components
Details
10-18-2016
1.50
Finished the storage space
Details
10-18-2016
0.00
Break lines
Details
10-16-2016
2.00
Conduits
Details
10-09-2016
1.00
Heat valve
Details
10-09-2016
6.00
Deburring and priming
Details
10-08-2016
3.00
Tunnel cover
Details
10-07-2016
0.50
Seat hinge pins
Details
10-06-2016
1.50
Baggage floor and center channel
Details
10-05-2016
1.50
Conduits anchors
Details
10-04-2016
2.00
Brake lines
Details
10-04-2016
1.50
Brake fluid reservoir
Details
10-02-2016
1.00
Stick boot rings
Details
10-01-2016
2.50
Flap actuator components
Details
09-28-2016
1.00
Storage space hinge
Details
09-27-2016
2.00
New wear blocks
Details
09-26-2016
1.50
Storage space lid
Details
09-25-2016
3.50
Vent lines
Details
09-24-2016
1.50
Flap actuator components
Details
09-21-2016
2.00
Seat hinges
Details
09-20-2016
2.00
Additional conduits
Details
09-19-2016
3.00
Under floor storage
Details
09-19-2016
3.00
Harness wear blocks
Details
09-18-2016
3.00
Elevator bell cranks and baggage bulkhead
Details
09-17-2016
3.00
Forward decks
Details
09-16-2016
2.00
Replacing fuselage rivets
Details
09-14-2016
2.00
Seats
Details
09-13-2016
0.50
Static ports
Details
09-13-2016
2.00
Fuselage gussets
Details
09-12-2016
1.50
Seat distance plates
Details
09-11-2016
1.00
Static ports
Details
09-11-2016
3.00
Aft fuselage top skin
Details
09-09-2016
3.00
Aft fuselage skin
Details
09-08-2016
3.00
Aft fuselage skin
Details
09-07-2016
2.00
Aft fuselage skin
Details
09-06-2016
2.00
Canopy sub structure
Details
09-05-2016
3.00
Riveted the aft deck.
Details
09-05-2016
1.50
Fuselage gussets
Details
09-04-2016
2.50
F-695 drilling
Details
09-03-2016
3.50
Making spacers and drilled the aft deck.
Details
09-02-2016
2.00
Flipping the canoe !
Details
09-02-2016
2.00
Checking twist
Details
08-30-2016
1.50
Rotisserie assembled
Details
08-28-2016
2.50
Last of the fuselage riveting
Details
08-27-2016
0.50
Prepping for rotisserie
Details
08-27-2016
2.00
Forward fuselage done
Details
08-24-2016
1.50
Prepping for static ports
Details
08-24-2016
1.50
Prepping for rotisserie
Details
08-22-2016
0.00
Testing dimensions
Details
08-22-2016
0.50
Main squeeze repair
Details
08-22-2016
2.00
Armrest riveting
Details
08-21-2016
3.00
Finishing center section bottom skin
Details
08-19-2016
2.00
Finishing up forward fuselage
Details
08-16-2016
2.50
outboard seat ribs riveting
Details
08-16-2016
0.00
Holes pitot, AOA lines
Details
08-15-2016
0.00
Looking at parts
Details
08-15-2016
1.00
Armrest stiffeners riveting
Details
08-14-2016
2.00
Armrest painting
Details
08-13-2016
2.00
Armrest stiffeners
Details
08-12-2016
2.00
Armrest stiffeners
Details
08-11-2016
1.50
F-711 replacement
Details
08-10-2016
2.50
Sealing Firewall
Details
08-09-2016
2.00
Lower longeron bolts
Details
08-08-2016
2.00
Fuselage beatification
Details
08-07-2016
3.00
Firewall sealant
Details
08-06-2016
4.00
Fuselage riveting
Details
08-05-2016
3.50
Fuselage riveting
Details
08-04-2016
1.50
Started fuselage riveting
Details
08-03-2016
2.00
Fuselage assembly
Details
08-02-2016
3.50
Fuselage assembly
Details
08-02-2016
0.50
Countersink for double flush
Details
07-30-2016
3.50
Forward fuselage riveting
Details
07-29-2016
2.00
Testing fit and NACA vent
Details
07-24-2016
0.00
Taking a break
Details
07-23-2016
2.50
Side skin dimpling and FW painting.
Details
07-22-2016
3.50
Bottom and side skin prepping
Details
07-21-2016
1.50
F-705 riveting
Details
07-19-2016
2.50
Center section
Details
07-18-2016
3.50
Mounting outboard ribs
Details
07-17-2016
4.50
Longeron priming and painting
Details
07-15-2016
1.00
F-710B angle tweak
Details
07-14-2016
2.00
Interior paint
Details
07-13-2016
1.00
Vent line
Details
07-12-2016
3.00
Interior paint
Details
07-11-2016
2.00
Side skin masking
Details
07-10-2016
4.00
Priming fuselage components
Details
07-08-2016
2.50
Priming fuselage components
Details
07-03-2016
2.50
Front fuselage
Details
07-02-2016
1.00
Front fuselage
Details
06-30-2016
1.00
Front fuselage
Details
06-29-2016
2.00
Corner ribs
Details
06-28-2016
1.00
Brake cylinders
Details
06-27-2016
1.00
Rudder pedal support
Details
06-26-2016
2.50
Brake cylinders
Details
06-25-2016
2.00
Rudder pedals
Details
06-25-2016
0.50
Inside job
Details
06-24-2016
2.50
Drilled replacement ribs
Details
06-19-2016
3.00
Undressing fuselage
Details
06-17-2016
2.00
Corner rib needs replacement
Details
06-14-2016
2.50
Corner rib tweaking
Details
06-13-2016
2.00
Bottom skin fitting
Details
06-10-2016
3.00
F-717 lower longeron drilling
Details
06-09-2016
1.00
F-684 gusset
Details
06-07-2016
2.50
F-684 gusset
Details
06-04-2016
2.50
F-902 Bulkhead
Details
06-01-2016
1.50
F-717 lower longeron fitting
Details
05-30-2016
2.00
F-719 stiffener
Details
05-28-2016
2.00
Firewall
Details
05-28-2016
0.50
F-904 attach strips
Details
05-26-2016
2.00
Firewall
Details
05-24-2016
3.00
Longeron drilling front
Details
05-23-2016
2.00
Longeron clearance
Details
05-22-2016
2.00
Continued longeron drilling
Details
05-21-2016
2.00
Started longeron drilling
Details
05-20-2016
2.00
Conical bend
Details
05-15-2016
3.50
Longeron fine adjustment
Details
05-14-2016
1.50
Twisting longeron
Details
05-14-2016
3.50
Forward decks
Details
05-13-2016
2.00
Longeron bending
Details
05-10-2016
2.00
Cabin floor
Details
05-08-2016
3.50
Center section riveting
Details
05-07-2016
3.50
Center section riveting
Details
05-06-2016
2.00
Center section clecoing
Details
05-05-2016
2.00
Seat belt anchors painting
Details
04-24-2016
3.50
Center section riveting
Details
04-23-2016
0.50
Tail cone storage
Details
04-23-2016
2.50
Fuselage riveting
Details
04-04-2016
5.50
Fuselage riveting
Details
04-03-2016
1.00
Crotch strap brackets nutplates
Details
04-02-2016
2.50
Fuselage twist check
Details
03-30-2016
2.50
Tail skin riveting
Details
03-28-2016
1.50
Rudder cable fairing nutplates
Details
03-28-2016
2.00
Aft bulkhead fitting
Details
03-28-2016
0.50
5 point harness
Details
03-26-2016
4.00
Misc. parts priming
Details
03-25-2016
4.00
Seat rib priming
Details
03-25-2016
2.00
Rudder cable fairing alignment
Details
03-22-2016
1.50
Rudder cable fairing
Details
03-20-2016
0.50
Electric Trim
Details
03-19-2016
3.00
Seat belt brackets
Details
03-18-2016
0.50
Tail spring bracket
Details
03-18-2016
2.00
Corner ribs straps
Details
03-16-2016
1.00
outboard seat rib fluting
Details
03-16-2016
1.50
Corner ribs
Details
03-15-2016
2.50
Center section assembly
Details
03-14-2016
1.00
Center section assembly
Details
03-13-2016
1.00
Static port drilling
Details
03-13-2016
1.00
Seat rib tie-in spacers
Details
03-13-2016
2.50
F-706 riveting
Details
03-12-2016
2.50
Aft fuselage skin dimpled
Details
03-07-2016
1.50
Started seat ribs
Details
03-07-2016
2.00
New F-916C spacers
Details
03-05-2016
4.50
Aft skin priming
Details
03-04-2016
2.00
Tailwheel weldment wedge
Details
03-04-2016
1.50
Tailwheel spring adjustment
Details
03-04-2016
2.00
Checking twist
Details
03-03-2016
2.00
Aft fuselage deburring
Details
02-29-2016
2.00
Aft fuselage drilling
Details
02-28-2016
4.50
Aft fuselage drilling
Details
02-27-2016
2.00
J-channel fitting
Details
02-27-2016
2.00
F-706 part II
Details
02-27-2016
0.50
Aft bottom skin done ?
Details
02-26-2016
1.50
Tail skin adjustments
Details
02-25-2016
3.50
F-711 part II
Details
02-23-2016
1.50
Static line routing
Details
02-22-2016
1.50
J-channels
Details
02-21-2016
4.00
F-705 deburring and priming
Details
02-21-2016
3.00
Aft fuselage assembly
Details
02-20-2016
1.00
Mark cut out got tail spring
Details
02-20-2016
2.00
Flap actuator bearings
Details
02-19-2016
1.00
Tail bottom skin trimming
Details
02-19-2016
1.00
Spar assembly
Details
02-19-2016
2.00
Fitting the tail bottom skin
Details
02-19-2016
1.00
Destruction of parts
Details
02-19-2016
1.50
Center section assembly
Details
02-19-2016
1.50
Bulk heads to bottom skin
Details
02-18-2016
1.50
Seat back angles
Details
02-14-2016
2.00
Seat back angles
Details
02-14-2016
2.00
F-705 drilling
Details
02-13-2016
1.00
Seat belt anchors
Details
02-13-2016
3.00
Center section brackets
Details
02-12-2016
2.00
Continued work on the F-705.
Details
02-11-2016
2.00
F-706 Assembly
Details
02-11-2016
2.00
F-705 Part II
Details
02-11-2016
0.50
Bulkheads done, nearly
Details
02-10-2016
2.00
Riveted Bulkheads angles
Details
02-09-2016
2.00
Started Bulkheads angles
Details
02-08-2016
2.00
Center Section brackets and elevator bell crank
Details
02-07-2016
4.00
Primed the bulkheads
Details
02-07-2016
1.00
Prepped bulkhead for priming
Details
02-07-2016
1.00
F-705 Bulkhead, the F-730 plate
Details
02-06-2016
2.00
Longeron bending
Details
02-06-2016
2.00
Assembled elevator bell crank (F-635).
Details
02-05-2016
2.00
Elevator Servo Bracket
Details
02-02-2016
2.00
Bulkhead slots for longerons
Details
02-01-2016
1.00
Started F-711 Bulkhead
Details
02-01-2016
0.50
Started F-710 Bulkhead
Details
02-01-2016
1.00
F-705 Drilling failure
Details
01-31-2016
6.00
Started the F-706 bulkhead
Details
01-31-2016
1.50
Assembled F-706 Bulkhead
Details
01-30-2016
5.50
Started the bulkheads
Details
01-26-2016
3.00
Riveted Firewall
Details
01-23-2016
4.00
Started riveting the center section
Details
01-22-2016
2.00
Test fitted the control column
Details
01-20-2016
2.00
Trimmed the control column mounts
Details
01-19-2016
3.00
Drilled the control column mounts
Details
01-18-2016
2.00
Made holes for cables in center section
Details
01-17-2016
3.00
Priming of the firewall aluminum stiffeners
Details
01-17-2016
2.00
Deburring of F-704 bulkhead parts
Details
01-16-2016
2.00
Deburred firewall aluminum angles
Details
01-13-2016
0.50
Got remaining fuselage parts
Details
01-10-2016
4.00
Countersunk firewall parts
Details
01-09-2016
4.00
Drilled firewall parts
Details
01-09-2016
2.00
Brake line FW pass through stiffener
Details
01-08-2016
5.00
Started firewall
Details
01-06-2016
4.00
Fuselage inventory continues
Details
01-05-2016
3.00
Fuselage inventory
Details
01-04-2016
1.00
Fuselage Kit Arrives
Details
SITE NAVIGATION
RV-7 Home
Category
# Logs
# Hours
All
984
2084
Avionics
27
40
Empennage
122
300
Engine
4
19
Finishing
103
211
Firewall Forward
20
28
Fuselage
392
782
Miscellaneous
10
13
None
1
Practice
4
6
Shop Supplies
8
14
Training
2
16
Wings
275
627
Workshop
8
14
Workshop and Supplie
8
14
Copyright © 2001-2024 Matronics. All Rights Reserved.