Date
|
Hours
|
Work Log Summary
|
Details
|
03-13-2006
|
1.00
|
Fiberglas inside tip of Tail Cone Slider Cover
|
Details
|
|
|
03-12-2006
|
3.00
|
Final Installation of Tail Rotor
|
|
|
|
03-12-2006
|
2.00
|
Final assembly of Tail Rotor parts
|
|
|
|
01-06-2006
|
4.30
|
Fab Slider to Actuator Clevis Weldment
|
|
|
|
12-30-2005
|
0.40
|
Finalize Fabrication of Vertical Trim Fin Doubler
|
Details
|
|
|
12-28-2005
|
4.80
|
Final Installation of Tail Rotor Slider Rails
|
|
|
|
12-28-2005
|
0.00
|
Completed tail rotor slider rail installation
|
|
|
|
12-27-2005
|
12.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-27-2005
|
0.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-27-2005
|
0.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-17-2005
|
0.00
|
Final shaping of the lower vertical trim fin plugs
|
|
|
|
12-17-2005
|
4.30
|
Fabrication of vertical stabilizer trim fin plugs
|
|
|
|
12-17-2005
|
0.00
|
Fabrication of the lower vertical trim fin plugs
|
|
|
|
12-16-2005
|
3.30
|
Fabrication of the lower vertical trim fin plugs
|
|
|
|
12-11-2005
|
4.20
|
Fabricate Tail Rotor Pitch Actualtor Arms
|
Details
|
|
|
11-29-2005
|
3.00
|
Completed the Horiz Trim Fin Assembly for the Co-p
|
Details
|
|
|
11-28-2005
|
4.00
|
Assembled Winglet to Horizontal Trim Fin
|
Details
|
|
|
11-27-2005
|
6.10
|
Positioned and drilled Horizontal Trim Fins
|
|
|
|
11-25-2005
|
0.00
|
Final installation of the horizontal stabilizer do
|
|
|
|
11-25-2005
|
0.00
|
Final inspection of the horizontal stabilizer doub
|
|
|
|
11-25-2005
|
4.90
|
Fabricated and Installed Horiz Stabilizer Doublers
|
|
|
|
11-20-2005
|
7.80
|
Final Assembly of Tail Boom to Airframe
|
Details
|
|
|
11-16-2005
|
3.80
|
Tail Boom Installation
|
|
|
|
11-14-2005
|
4.00
|
Fabricating Winglets
|
|
|
|
10-23-2005
|
2.70
|
Fiberglass Winglet
|
|
|
|
10-22-2005
|
2.40
|
Preparing Boom for Inspection Covers
|
|
|
|
10-22-2005
|
2.20
|
Fabricated Inspection Covers
|
|
|