KitLog pro

Powered By Kitlog Pro v2.0

Air Camper Construction Log
Work Logs Found: 61
Category Work Time: 198 Hours
 Date
Hours
Work Log Summary

Details

 11-16-2016
1.50
Engine Run on Airframe
Details
       

 11-15-2016
2.00
Cooling System
Details
     

 11-14-2016
2.50
Cooling System
Details
     

 11-12-2016
2.50
Cooling System
Details
     

 11-09-2016
2.00
Cooling System
Details
     

 11-05-2016
1.50
Cooling System
Details
       

 11-02-2016
2.50
Cooling System
Details
       

 10-29-2016
2.00
Cooling System
Details
       

 10-23-2016
2.50
Cooling System
Details
     

 08-04-2015
0.50
Exhaust System
Details
       

 03-01-2015
10.00
Corvair College #32 – San Marcos, TX
Details
       

 02-28-2015
10.00
Corvair College #32 – San Marcos, TX
Details
       

 02-28-2015
10.00
Corvair College #32 – San Marcos, TX
Details
       

 02-27-2015
10.00
Corvair College #32 – San Marcos, TX
Details
       

 09-17-2014
10.00
Corvair College #30 – Mexico, MO
Details
       

 09-16-2014
10.00
Corvair College #30 – Mexico, MO
Details
       

 09-15-2014
10.00
Corvair College #30 – Mexico, MO
Details
       

 03-30-2014
2.50
Engine Lifter Check
Details
       

 03-02-2014
10.00
Corvair College 28
Details
       

 03-01-2014
10.00
Corvair College 28
Details
       

 02-28-2014
10.00
Corvair College 28
Details
       

 02-10-2014
1.50
Corvair College 28 Prep
Details
     

 08-03-2013
0.50
Got Her Home!
Details
       

 07-26-2013
0.50
Engine
Details
     

 07-22-2013
0.50
Roy's Garage
Details
       

 03-08-2012
30.00
Corvair College #22
Details
       

 04-29-2011
1.00
Shipped Engine to Roy Szarafinski
Details

 03-20-2011
1.00
Preparing Engine for Shipping
Details
       

 03-20-2011
1.00
Preparing Engine for Shipping
Details
       

 02-23-2011
2.00
Preparing Engine for Shipping
Details
       

 02-19-2011
1.00
Preparing Engine for Shipping
Details
       

 05-20-2010
1.00
Received Heads from Falcon
Details
       

 12-12-2009
0.50
Recieved Crankshaft from Moldex
Details
       

 10-31-2009
1.50
Welded Engine Jig
Details

 10-31-2009
1.50
Cut Material for Engine Jig
Details

 10-30-2009
0.50
Shipped Crankshaft to Moldex
Details

 10-25-2009
1.00
Engine Front Cover
Details
     

 10-24-2009
1.50
Engine Front Cover
Details
     

 10-19-2009
0.00
Marvel Schebler Carburetor
Details
       

 10-04-2009
1.00
Corvair Engine Parts
Details

 09-14-2009
0.10
Crankshaft Update
Details

 09-02-2009
0.50
Shipped Crankshaft
Details

 08-26-2009
2.00
Packaged Crankshaft
Details
       

 07-22-2009
1.00
Took Heads to Falcon
Details
     

 07-16-2009
0.00
Corvair Cylinder
Details
     

 07-11-2009
0.50
Painted Valve Covers and Baffles
Details
       

 07-11-2009
1.00
Painted Exhaust Logs and Pushrod Tubes
Details
       

 07-10-2009
0.50
Sand Blasted Exhaust Logs
Details
       

 07-10-2009
1.00
Engine Cleaning (phase 1)
Details
       

 07-09-2009
1.00
Exhaust Logs
Details
     

 07-08-2009
1.00
Magnaflux Crank Shaft
Details

 07-06-2009
0.50
Engine Cylinder Replacement
Details

 07-05-2009
0.50
Engine Overhaul
Details
       

 07-03-2009
2.50
Engine Overhaul
Details
       

 06-24-2009
2.00
Engine Overhaul
Details
       

 06-23-2009
1.50
Engine Overhaul
Details

 06-21-2009
4.00
Engine Ovehaul
Details
       

 06-20-2009
5.00
Corvair Engine Removal
Details
       

 06-19-2009
2.00
Corvair Purchase and Delivery
Details
       

 06-18-2009
0.50
Engine Search
Details

 06-12-2009
1.00
Engine Search
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.