Powered By Kitlog Pro v2.0
Air Camper Construction Log
NX762R
Engine
Work Logs Found:
61
Category Work Time:
198 Hours
Date
Hours
Work Log Summary
Details
11-16-2016
1.50
Engine Run on Airframe
Details
11-15-2016
2.00
Cooling System
Details
11-14-2016
2.50
Cooling System
Details
11-12-2016
2.50
Cooling System
Details
11-09-2016
2.00
Cooling System
Details
11-05-2016
1.50
Cooling System
Details
11-02-2016
2.50
Cooling System
Details
10-29-2016
2.00
Cooling System
Details
10-23-2016
2.50
Cooling System
Details
08-04-2015
0.50
Exhaust System
Details
03-01-2015
10.00
Corvair College #32 – San Marcos, TX
Details
02-28-2015
10.00
Corvair College #32 – San Marcos, TX
Details
02-28-2015
10.00
Corvair College #32 – San Marcos, TX
Details
02-27-2015
10.00
Corvair College #32 – San Marcos, TX
Details
09-17-2014
10.00
Corvair College #30 – Mexico, MO
Details
09-16-2014
10.00
Corvair College #30 – Mexico, MO
Details
09-15-2014
10.00
Corvair College #30 – Mexico, MO
Details
03-30-2014
2.50
Engine Lifter Check
Details
03-02-2014
10.00
Corvair College 28
Details
03-01-2014
10.00
Corvair College 28
Details
02-28-2014
10.00
Corvair College 28
Details
02-10-2014
1.50
Corvair College 28 Prep
Details
08-03-2013
0.50
Got Her Home!
Details
07-26-2013
0.50
Engine
Details
07-22-2013
0.50
Roy's Garage
Details
03-08-2012
30.00
Corvair College #22
Details
04-29-2011
1.00
Shipped Engine to Roy Szarafinski
Details
03-20-2011
1.00
Preparing Engine for Shipping
Details
03-20-2011
1.00
Preparing Engine for Shipping
Details
02-23-2011
2.00
Preparing Engine for Shipping
Details
02-19-2011
1.00
Preparing Engine for Shipping
Details
05-20-2010
1.00
Received Heads from Falcon
Details
12-12-2009
0.50
Recieved Crankshaft from Moldex
Details
10-31-2009
1.50
Welded Engine Jig
Details
10-31-2009
1.50
Cut Material for Engine Jig
Details
10-30-2009
0.50
Shipped Crankshaft to Moldex
Details
10-25-2009
1.00
Engine Front Cover
Details
10-24-2009
1.50
Engine Front Cover
Details
10-19-2009
0.00
Marvel Schebler Carburetor
Details
10-04-2009
1.00
Corvair Engine Parts
Details
09-14-2009
0.10
Crankshaft Update
Details
09-02-2009
0.50
Shipped Crankshaft
Details
08-26-2009
2.00
Packaged Crankshaft
Details
07-22-2009
1.00
Took Heads to Falcon
Details
07-16-2009
0.00
Corvair Cylinder
Details
07-11-2009
0.50
Painted Valve Covers and Baffles
Details
07-11-2009
1.00
Painted Exhaust Logs and Pushrod Tubes
Details
07-10-2009
0.50
Sand Blasted Exhaust Logs
Details
07-10-2009
1.00
Engine Cleaning (phase 1)
Details
07-09-2009
1.00
Exhaust Logs
Details
07-08-2009
1.00
Magnaflux Crank Shaft
Details
07-06-2009
0.50
Engine Cylinder Replacement
Details
07-05-2009
0.50
Engine Overhaul
Details
07-03-2009
2.50
Engine Overhaul
Details
06-24-2009
2.00
Engine Overhaul
Details
06-23-2009
1.50
Engine Overhaul
Details
06-21-2009
4.00
Engine Ovehaul
Details
06-20-2009
5.00
Corvair Engine Removal
Details
06-19-2009
2.00
Corvair Purchase and Delivery
Details
06-18-2009
0.50
Engine Search
Details
06-12-2009
1.00
Engine Search
Details
SITE NAVIGATION
Contact Builder
NX762R Home
Category
# Logs
# Hours
All
661
1506
Cables and Control
13
23
Covering
64
122
Electric/Instruments
23
37
Empennage
7
48
Engine
61
198
Firewall Forward
13
19
Fuel System
16
20
Fuselage
58
153
Landing Gear
52
113
Metal Fabrication
76
176
Miscellaneous
40
94
Shop Prep
6
30
Tools
20
38
Wings
212
435
Copyright © 2001-2024 Matronics. All Rights Reserved.