Powered By Kitlog Pro v2.0
Alton's Web Site
RV-7A
Empennage
Work Logs Found:
29
Category Work Time:
117 Hours
Date
Hours
Work Log Summary
Details
07-14-2010
10.00
installed empennage tips.
Details
03-26-2007
4.00
Rigged the elavator and rudder
Details
03-23-2007
12.00
Drilled the vertical stabilizer
Details
03-15-2007
4.00
Mounted the Horizontal stabilizer
Details
12-09-2005
2.00
Mounted Both elevators to the HS
Details
12-09-2005
4.00
Left Elevator - rolled leading edge.
Details
11-29-2005
5.00
Fiberglass Tips
Details
11-25-2005
4.00
Rudder and VS test fit
Details
11-25-2005
4.00
Right elevator
Details
11-23-2005
4.00
Rudder Trailing edge
Details
11-18-2005
8.00
Trim tab
Details
11-17-2005
2.00
Right Elevator
Details
11-11-2005
2.00
Elevator skins
Details
11-10-2005
2.00
HS Rear Spar
Details
11-10-2005
2.00
HS Frame
Details
11-10-2005
4.00
Elevators
Details
11-09-2005
6.00
HS skin
Details
11-07-2005
2.00
HS Rear Spar
Details
11-04-2005
4.00
Rudder assembly
Details
11-04-2005
1.00
More Rudder Pics
11-04-2005
1.00
HS prime
Details
10-30-2005
4.00
Rudder Frame
Details
10-29-2005
6.00
Rudder Stiffeners
Details
10-28-2005
4.00
Riveted VS
Details
10-27-2005
4.00
Riveted VS frame
Details
10-26-2005
4.00
Verticle Stab
Details
10-26-2005
3.00
Verticle Stab
Details
10-21-2005
1.00
Kit Arrives
Details
10-21-2005
4.00
Getting started
Details
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
242
1656
Avionics
9
86
Electrical
4
69
Empennage
29
117
Engine
17
185
Flying
3
Fuselage
104
741
Instruments
1
16
Miscellaneous
3
24
Prop
7
24
Wings
65
394
Copyright © 2001-2024 Matronics. All Rights Reserved.