ANDREW'S WEB SITE
Barracuda
Hydraulics
Work Logs Found:
4
Category Work Time:
30 Hours
Date
Hours
Work Log Summary
Details
11-14-2015
8.00
Hoses.
Details
08-22-2015
8.00
Installed the hydraulic pump in the rear fuselage.
06-11-2008
7.50
Manufactured hydraulic lines.
06-10-2008
6.50
Fabricated hydraulic lines.