Powered By Kitlog Pro v2.0
ANDREW'S WEB SITE
Barracuda
Avionics
Work Logs Found:
11
Category Work Time:
92 Hours
Date
Hours
Work Log Summary
Details
11-21-2015
8.00
Antenna
Details
10-31-2015
8.00
Installed components.
Details
10-24-2015
8.00
Installed components.
Details
10-10-2015
8.00
Wiring
Details
10-03-2015
8.00
Wiring.
Details
09-26-2015
9.00
Wiring.
Details
09-19-2015
8.00
Wiring
Details
08-15-2015
8.00
Fabricated the left side dash panel and installed
08-01-2015
10.00
Installed the Dynon 100 on the pilot site of the d
10-24-2014
14.00
Build the wiring panels
Details
09-07-2008
3.00
Comm antenna.
Details
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
89
687
Avionics
11
92
Brakes
2
16
Center section
4
73
Cowling
2
18
Empennage
5
28
Engine
14
102
Fuselage
21
137
Hydraulics
4
30
Landing gear
6
34
Miscellaneous
11
56
Prop
1
8
Shop Supplies
1
4
Wings
7
89
Copyright © 2001-2024 Matronics. All Rights Reserved.