ANDREW'S WEB SITE
Barracuda
Fuselage
Work Logs Found:
21
Category Work Time:
137 Hours
Date
Hours
Work Log Summary
Details
08-08-2015
8.00
Installed the windshield with structural adhesive
09-18-2009
4.50
Installed the side fuselage skins permanently. Th
04-16-2009
4.50
Cabin doors
Details
03-26-2009
6.50
Cabin doors
Details
03-25-2009
8.00
Cabin doors.
Details
03-23-2009
6.00
Installed the rear windows.
Details
02-28-2009
4.00
Fabricated and installed the anchor cables.
Details
02-26-2009
8.50
Fabricated the canopy door frames (curved layups).
02-12-2009
3.50
Installed upholstery in the baggage compartment.
02-11-2009
8.00
Fitted rear windows in the fuselage.
Details
11-03-2008
6.00
Fabricated firewall upper panel.
Details
10-29-2008
9.00
Installed flap motor.
Details
09-21-2008
10.00
Fabricated tie down.
Details
09-20-2008
8.00
Varnished.
Details
09-12-2008
8.00
Completed installation of the control cables.
Details
09-11-2008
8.00
Continued installing control cables.
Details
09-10-2008
4.00
Fabricating and mounting control cables.
07-06-2008
2.50
Fitting components to the firewall. Fabricating b
07-01-2008
2.00
Firewall.
Details
06-16-2008
8.00
Trimmed the openings.
Details
05-15-2008
10.00
Purchased partial kit (parts)
Details
SITE NAVIGATION
Contact Builder
Barracuda Home
Category
# Logs
# Hours
All
89
687
Avionics
11
92
Brakes
2
16
Center section
4
73
Cowling
2
18
Empennage
5
28
Engine
14
102
Fuselage
21
137
Hydraulics
4
30
Landing gear
6
34
Miscellaneous
11
56
Prop
1
8
Shop Supplies
1
4
Wings
7
89
Copyright © 2001-2024 Matronics. All Rights Reserved.