KitLog pro

Powered By Kitlog Pro v2.0

Daytons Web site
Work Logs Found: 17
Category Work Time: 168 Hours
 Date
Hours
Work Log Summary

Details

 04-03-2006
3.00
Re-Build Left Elevator
Details

 03-28-2006
3.00
Re-Build Left Elevator
Details
       

 03-24-2006
2.00
Re-Build Left Elevator
Details
     

 03-21-2006
2.00
Re- Build Left Elevator
Details
       

 03-19-2006
3.00
Re- Build Left Elevator
Details
       

 05-03-2000
5.00
Elevator Trim Tab
Details
       

 05-01-2000
30.00
Elevators
Details
       

 04-01-2000
25.00
Starting Rudder
Details

 03-05-2000
10.00
Riveting Vertical Stab
Details
       

 03-04-2000
5.00
Vertical Stab Frame
Details
     

 03-03-2000
10.00
Assembling Vertical Stab
Details
     

 03-02-2000
5.00
Vertical Spar
Details

 03-01-2000
10.00
Starting Vertical Stab.
Details
     

 02-16-2000
25.00
Skinning Horizontal
Details
       

 02-13-2000
10.00
Horazontal Spar
Details

 02-12-2000
10.00
Horazontal Spar
Details
     

 02-10-2000
10.00
Wing Jig
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.