KitLog pro

Powered By Kitlog Pro v2.0

Kents RV-10 Construction Site
Work Logs Found: 15
Category Work Time: 31 Hours
 Date
Hours
Work Log Summary

Details

 11-28-2020
2.50
Firewall Forward Wiring
Details
     

 11-09-2020
1.50
Main Power Line
Details
       

 11-07-2020
3.00
Power Line
Details
       

 09-14-2020
0.75
Power Lines
Details
       

 09-12-2020
1.50
Main Power
Details
       

 09-11-2020
1.00
Battery Cable
Details
     

 08-19-2020
2.50
Main Power Wiring
Details
       

 08-18-2020
2.50
Main Power Line
Details
       

 04-27-2019
1.50
Wiring
Details

 04-21-2019
2.00
Passenger Side Wiring
Details
     

 12-20-2015
2.00
Pitot heat wiring
Details
       

 12-19-2015
3.50
Nav/strobe wiring
Details
       

 07-29-2015
3.00
Aileron trim wiring
Details
       

 07-21-2015
3.50
Nav/strobe and landing light
Details
       

 03-01-2014
0.50
Wing wiring
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.