KitLog pro

Powered By Kitlog Pro v2.0

Brents Panther Project
Work Logs Found: 27
Category Work Time: 116 Hours
 Date
Hours
Work Log Summary

Details

 11-28-2016
2.00
INSTALL OIL SEPERATOR
Details
       

 06-03-2016
1.00
CHECK TIMING
Details

 05-30-2016
1.00
THROTTLE/MIXTURE CABLE SAFETY RETAINER
Details
     

 05-22-2016
4.00
FIRST ENGINE START
Details

 05-18-2016
4.00
COWLING HEAT REFLECTOR
Details
       

 05-12-2016
5.00
SPINNER INSTALL
Details
       

 05-11-2016
5.00
PROP AND SPINNER INSTALL
Details
       

 04-22-2016
3.00
ENGINE BREATHER LINE
Details
       

 04-19-2016
2.00
ADEL CLAMPS FOR WIRNG
Details

 03-13-2016
4.00
CARB HEAT MUFF
Details
       

 03-13-2016
4.00
AIR INLET FILTER BOX
Details
       

 03-12-2016
0.50
VAN'S SPINNER
Details
       

 03-12-2016
2.00
CARB HEATBOX
Details
       

 03-12-2016
8.00
CARB AIRBOX
Details
       

 03-11-2016
2.00
CARB AIRBOX
Details
     

 03-09-2016
3.00
THROTTLE/MIXTURE CABLES
Details
       

 02-27-2016
16.00
BAFFLING
Details
       

 02-02-2016
3.00
INSTALLED ENGINE
Details
     

 01-30-2016
8.00
EINGINE RUN
Details
       

 12-22-2015
4.00
ENIGINE BUILD CORVAIR
Details
     

 12-20-2015
3.00
ENIGINE BUILD CORVAIR
Details
       

 12-19-2015
6.00
ENIGINE BUILD CORVAIR
Details
     

 12-18-2015
2.00
ENIGINE BUILD CORVAIR
Details
     

 12-17-2015
3.00
ENIGINE BUILD CORVAIR
Details
     

 12-13-2015
8.00
ENIGINE BUILD CORVAIR
Details
       

 12-12-2015
8.00
ENIGINE BUILD CORVAIR
Details
       

 12-12-2015
4.00
ENIGINE BUILD CORVAIR
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.