Powered By Kitlog Pro v2.0
Leos Web Site
RV-10
Avionics
Work Logs Found:
10
Category Work Time:
48 Hours
Date
Hours
Work Log Summary
Details
10-12-2018
6.00
Install GTX45R
Details
09-03-2018
6.00
Install PFD and MFD
Details
12-12-2017
1.50
Install transponder antenne
Details
12-05-2017
4.00
run pneumatics Pitot, AOA and static lines
Details
11-07-2017
4.00
Install coax for comm and ADS-B antene
Details
09-14-2017
6.00
Mount Magnatometer, G5 and GMC307
Details
09-03-2017
5.00
Install the GTR20 remote radio and connector
Details
02-11-2017
3.00
Installed Pitch Servo
Details
06-15-2016
6.00
Revise instrument panel content and position
Details
12-20-2015
6.00
install ELT
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
465
3762
Avionics
9
55
Avionics
10
48
Canopy
9
55
Commentary
3
20
Controls
14
72
Cowel
4
48
Doors
17
100
Doors
30
263
Electrical
57
419
Electrical
10
82
Empennage
10
98
Engine
24
224
Fuselage
52
355
Horz Stab and Elevat
6
36
Instrument Panel
57
419
Interior
30
263
Interior
14
72
Misc.
6
57
Miscellaneous
6
57
None
2
Overhead
8
49
Painting
9
307
Prop
1
20
Stabilizer/Elevator
10
82
Tailcone
17
100
Things learned
8
49
Vert Stab and Rudder
3
20
Vert Stab/Rudder
6
36
What have I learned
2
2
Wings
31
354
Copyright © 2001-2024 Matronics. All Rights Reserved.