Date
|
Hours
|
Work Log Summary

|
Details

|
05-02-2020
|
7.00
|
Test ELT, Swing compass, calibrate fuel gauges
|
Details
|
|
|
04-30-2020
|
2.00
|
Pitot/static and transponder checks
|
Details
|
 |
|
04-26-2020
|
8.00
|
Inspection prep, compass, prop cycle
|
Details
|
|
|
04-25-2020
|
7.00
|
Inspection prep
|
Details
|
|
|
04-18-2020
|
7.00
|
Boots and Seals
|
Details
|
|
|
04-11-2020
|
7.00
|
Idle circuit adjustments and taxi test
|
Details
|
|
|
04-04-2020
|
8.00
|
W&B Prep; fuel flow test at injectors
|
Details
|
|
|
03-28-2020
|
6.00
|
New fuel level sensors, rudder connections
|
Details
|
|
|
03-14-2020
|
7.00
|
Aileron stops, clips, fairing
|
Details
|
|
|
02-15-2020
|
9.00
|
Plumbing and wing tips
|
Details
|
|
|
02-09-2020
|
8.00
|
Wing pushrod and fuel plumbing
|
Details
|
|
|
01-29-2020
|
3.00
|
Wings on!
|
Details
|
|
|
01-25-2020
|
6.00
|
Plumbing and wing install prep
|
Details
|
|
|
01-20-2020
|
8.00
|
Finalize pitot plumbing
|
Details
|
  |
|
01-12-2020
|
7.00
|
Install pitot
|
Details
|
|
|
10-20-2019
|
4.00
|
Bleed brakes
|
Details
|
 |
|
09-01-2019
|
7.00
|
Rudder stops; roll servo
|
Details
|
|
|
08-25-2019
|
9.50
|
Baffles IV + brakes
|
Details
|
|
|
07-14-2019
|
5.00
|
Add non-slip tape to brake pedals
|
Details
|
|
|
07-08-2018
|
6.00
|
Install wheels on landing gear
|
Details
|
|
|
07-04-2018
|
2.50
|
Prepping throttle bracket
|
Details
|
|
|
06-09-2018
|
3.00
|
Targa strip 2
|
|
|
|
06-03-2018
|
3.00
|
Targa strip 1
|
|
 |
|
05-20-2018
|
8.50
|
Install aft canopy, vents
|
Details
|
|
|
05-19-2018
|
6.00
|
Tunnel cover, aft canopy install prep
|
Details
|
|
|
05-06-2018
|
4.50
|
Flap positioner
|
Details
|
|
|
05-05-2018
|
5.50
|
Coax and pitot routing
|
Details
|
|
|
04-28-2018
|
7.00
|
Aeilron trim, copilot stick connector redux
|
|
|
|
04-22-2018
|
5.50
|
Install pushrods, tailwheel
|
Details
|
|
|
04-08-2018
|
6.00
|
Add connector for copilot removable stick
|
Details
|
|
|
02-19-2018
|
2.50
|
Apply lettering to panel
|
Details
|
|
|
02-18-2018
|
5.50
|
Fab and install fuel line from fuel flow to firewa
|
|
|
|
02-11-2018
|
6.00
|
Closeout of tunnel, fuel pump, fuel flow
|
Details
|
|
|
02-10-2018
|
4.50
|
Prime panel and terminate fuse block wiring
|
Details
|
|
|
02-04-2018
|
4.00
|
Terminate cable bundle from tunnel to tray
|
Details
|
|
|
02-03-2018
|
3.00
|
Terminate grounds to forest of tabs
|
Details
|
|
|
01-28-2018
|
4.50
|
Lace wiring in tunnel
|
Details
|
|
|
01-07-2018
|
6.50
|
Panel fit-up
|
Details
|
 |
|
01-06-2018
|
7.50
|
Fab panel connector bracket and priming
|
Details
|
|
|
03-12-2017
|
2.00
|
Wheel assembly
|
Details
|
|
|
01-01-2017
|
6.50
|
Install canopy positioner
|
Details
|
|
|
12-30-2016
|
4.00
|
Canopy fairing 4
|
Details
|
 |
|
12-29-2016
|
0.10
|
Canopy in action
|
Details
|
|
|
12-29-2016
|
7.00
|
Canopy fairing 3
|
Details
|
|
|
12-28-2016
|
4.00
|
Canopy fairing 2
|
Details
|
|
|
12-26-2016
|
4.50
|
Canopy fairing 1
|
Details
|
|
|
12-11-2016
|
4.00
|
Cabin work
|
Details
|
|
|
12-03-2016
|
5.50
|
Canopy fairing complete
|
Details
|
|
|
11-20-2016
|
5.00
|
Canopy fairing, static port, main gear releif
|
Details
|
|
|
11-19-2016
|
8.50
|
Canopy fairing 6 / engine mount
|
Details
|
|
|
11-13-2016
|
4.50
|
Canopy fairing 5
|
Details
|
|
|
11-06-2016
|
4.00
|
Canopy fairing 4
|
Details
|
|
|
11-01-2016
|
3.50
|
Canopy fairing 3
|
Details
|
|
|
10-29-2016
|
4.50
|
Canopy fairing 2
|
Details
|
|
|
10-23-2016
|
7.00
|
Canopy fairing 1 / latch
|
Details
|
|
|
10-22-2016
|
8.50
|
First canopy lift
|
Details
|
|
|
10-09-2016
|
6.00
|
Install avionics shelf
|
Details
|
|
|
10-08-2016
|
8.50
|
Aft avionics shelf
|
Details
|
|
|
09-25-2016
|
7.00
|
Canopy bonding
|
Details
|
|
|
09-22-2016
|
7.50
|
Prep for canopy bonding
|
Details
|
|
|
09-17-2016
|
6.00
|
Rivet canopy frame
|
Details
|
|
|
09-11-2016
|
4.00
|
Canopy frame fit check
|
Details
|
|
|
09-10-2016
|
3.50
|
Pre-rivet canopy frame gussets
|
Details
|
 |
|
09-05-2016
|
3.50
|
Priming and painting canopy parts
|
Details
|
|
|
09-03-2016
|
3.00
|
Priming canopy frame
|
Details
|
 |
|
08-28-2016
|
7.50
|
Fitting canopy frame gussets
|
Details
|
|
|
08-27-2016
|
5.00
|
Riveting canopy frame and hoop
|
Details
|
|
|
08-21-2016
|
4.50
|
Initial fit of rear canopy
|
Details
|
|
|
08-20-2016
|
7.50
|
Canopy fitup - lexan IV
|
Details
|
|
|
08-14-2016
|
6.00
|
Canopy fitup - lexan III
|
Details
|
|
|
08-13-2016
|
8.00
|
Canopy fitup - lexan II big cut
|
Details
|
|
|
08-11-2016
|
8.00
|
Canopy fitup - lexan I
|
Details
|
|
|
08-07-2016
|
8.00
|
Canopy fitup V - redux
|
Details
|
|
|
07-31-2016
|
7.50
|
Canopy fitup IV - redux
|
Details
|
|
|
07-30-2016
|
8.00
|
Canopy fitup III - redux
|
Details
|
|
|
07-17-2016
|
4.50
|
Canopy hoop joiner plate
|
Details
|
 |
|
07-10-2016
|
5.00
|
Canopy fitup III - redux
|
Details
|
|
|
07-03-2016
|
7.00
|
Canopy fitup II - redux
|
Details
|
|
|
05-29-2016
|
6.00
|
Canopy fitup V
|
Details
|
|
|
05-22-2016
|
5.00
|
Canopy fitup IV
|
Details
|
|
|
05-21-2016
|
8.00
|
Gas strut brackets, rear canopy fitup
|
Details
|
|
|
05-15-2016
|
6.00
|
Prep for more canopy work
|
Details
|
|
|
05-14-2016
|
6.00
|
Drill canopy hinge brackets
|
Details
|
|
|
03-12-2016
|
6.50
|
Rear canopy latch and initial front canopy fit
|
Details
|
|
|
03-06-2016
|
8.50
|
JDAirParts canopy latch 1
|
Details
|
|
|
03-05-2016
|
7.50
|
JDAirParts canopy latch 1
|
Details
|
|
|
02-28-2016
|
8.00
|
Canopy release mechanism 2
|
Details
|
|
|
02-27-2016
|
9.00
|
Pump cover and canopy bearing blocks
|
Details
|
|
|
02-22-2016
|
4.00
|
Storing the finishing kit parts
|
Details
|
 |
|
02-14-2016
|
4.50
|
Finishing kit arrives!
|
Details
|
|
|
02-06-2016
|
5.00
|
Priming and painting cabin parts
|
Details
|
 |
|
01-30-2016
|
3.00
|
Roll trim prep
|
Details
|
 |
|
11-23-2015
|
0.10
|
Ordered finishing kit
|
Details
|
  |