KitLog pro

Powered By Kitlog Pro v2.0

Marks KitLog
Work Logs Found: 46
Category Work Time: 45 Hours
 Date
Hours
Work Log Summary

Details

 10-15-2017
1.00
Cut angles on ends of exhaust stacks
Details
       

 10-15-2017
0.50
Adjusted valves .006"
Details

 05-29-2017
1.50
Welded exhaust stacks to flanges
Details
       

 05-28-2017
1.00
Tack-Welded exhaust stacks to flanges
Details
       

 05-28-2017
0.50
Cut exhaust stacks
Details
       

 05-27-2017
2.00
Pressure tested intake manifold, rewelded
Details
       

 05-20-2017
0.20
Installed dessicant plugs in spark plug holes

 12-29-2016
0.50
Welded new intake
Details
       

 12-29-2016
0.15
Retorqued heads to 18ft-lbs (for 8mm studs)
Details

 12-29-2016
1.00
Repurposed oil filter fitting
Details
 

 12-29-2016
0.50
Installed rocker arm assemblies
Details

 12-29-2016
0.15
Clamp on front seal
Details
     

 12-29-2016
2.00
Built intake piping
Details
       

 11-16-2016
0.10
Valve covers on
     

 11-16-2016
0.30
Pushrod tubes
       

 11-16-2016
1.00
Heads
       

 11-16-2016
1.00
Barrel shims and deck height
       

 10-04-2016
1.50
installed studs, checked deck height, installed cy
Details
       

 10-02-2016
0.50
Oil Filler, drilled/tapped/installed
Details
     

 09-30-2016
0.50
Installed oil cooling tower
Details
     

 09-28-2016
1.50
Flywheel endplay, and installation
Details
       

 09-20-2016
0.75
Oil Filler finish work (version 2), and installati
Details
       

 09-18-2016
0.75
Remote oil cooler adapter tower DIY
Details
       

 09-18-2016
1.00
Oil Filler DIIY
Details
       

 09-17-2016
0.25
Fuel Pump Installation
Details
     

 09-14-2016
1.50
Assembled case halves (finally)
Details
       

 09-07-2016
0.25
Paint, and Cleanup
Details
       

 08-28-2016
0.50
Cylinder Heads, Head Covers
Details
       

 08-11-2016
0.75
Hardware Cleanup
Details
     

 08-09-2016
2.00
Engine Work
Details
       

 07-28-2016
1.50
Rod install, Hub, etc.
Details
       

 07-28-2016
1.50
Distributor, Cam Bearings, Plastigaged
Details
       

 07-26-2016
1.00
Cleaning up heads for machine shop work.
Details
       

 07-26-2016
0.10
Case Build Up 1
Details
     

 07-19-2016
1.00
Began crank assembly, distributor drive gear, wron
Details

 07-18-2016
0.00
Engine Continued
Details
       

 07-18-2016
4.00
Case work, internals arrived
Details
       

 07-14-2016
1.00
Picked-up acid-cleaned & primed case
Details
       

 07-13-2016
0.25
Cased dropped off for cleaning
Details

 07-05-2016
1.50
Engine parts sourcing
Details

 05-24-2016
0.50
Case apprasial continued, oil pump apprasial, rod
Details

 05-14-2016
2.00
Align Bore and Thrust Cut
Details
       

 05-08-2016
2.00
Purchased 1973 VW 1600cc engine
Details
     

 05-08-2016
1.00
Evaluated engine condition #1
Details
       

 05-08-2016
0.50
Evaluated engine #2
Details
       

 05-05-2016
2.00
Engine apprasial, and acquisition
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.