KitLog pro

Powered By Kitlog Pro v2.0

Daniels Web Site
Work Logs Found: 21
Category Work Time: 37 Hours
 Date
Hours
Work Log Summary

Details

 08-13-2016
1.80
Installed Fuel Neck
Details
       

 08-12-2016
1.00
Install Fuel Tank
Details
       

 07-17-2016
0.40
Installed Anti-Rotation Bracket & Fitting
Details
       

 07-15-2016
0.20
Drilled Anti-Rotation Plate
Details
     

 02-25-2012
0.80
Verified No Tank Leaks & Drill Fuel Cap
Details
       

 02-21-2012
0.80
Balloon Deflated - Leak Identified
Details
       

 02-20-2012
1.10
Soapy Solution Leak Check of Fuel Tank
Details
     

 02-19-2012
0.20
Started leak Check of Fuel Tank
Details
     

 02-03-2012
3.10
Sealed Up Fuel Tank
Details
       

 01-29-2012
1.50
Sealed & Riveted Top Tank Skin
Details
       

 01-27-2012
1.70
Completed T-1204A Top Tank Skin
Details
       

 01-19-2012
1.40
Prepped for Install of Moeller Mechanical Fuel Gag
Details
       

 01-08-2012
0.90
Sealed Inside Corners of Tank
Details
       

 01-07-2012
1.50
Fabricated Fuel Return Line and Clips
Details
       

 01-02-2012
2.40
Fitted Fuel Neck
Details
       

 01-01-2012
3.80
Adjusted Float Arm & Temp Installed Fuel Tank
Details
       

 12-31-2011
2.20
Installed Fuel Window
Details
       

 12-30-2011
0.80
Corrected Rivet Direction in Attach Angle
Details
       

 12-28-2011
4.20
Installed Tank Bracket, Baffles, & Aft Bulkhead
Details
       

 12-27-2011
2.70
Started Building Fuel Tank
Details
       

 12-26-2011
4.20
Prepped Fuel Tank Parts
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.