KitLog pro

Powered By Kitlog Pro v2.0

Marks Web site
Work Logs Found: 108
Category Work Time: 358 Hours
 Date
Hours
Work Log Summary

Details

 12-23-2005
2.00
Installed aileron stops

 12-17-2005
4.00
Primed and installed gap seals on right wing.
Details

 12-16-2005
3.00
Riveted aileron brackets on right wing

 12-15-2005
3.00
Aileron brackets right wing

 12-14-2005
3.50
Finished riveting top skin, right wing
Details

 12-13-2005
1.50
Riveted some on top skin , right wing

 12-10-2005
5.00
Built long aileron push-pull tubes
Details

 12-04-2005
7.00
Fabricated short aileron push pull tubes
Details

 12-03-2005
2.00
Riveted ribs to top skins, right flap
Details

 12-02-2005
2.00
Riveted ribs to lower skin, right flap

 12-01-2005
2.00
Finished riveting left flap

 11-30-2005
2.00
Riveted more of the top skins, right wing

 11-29-2005
2.00
Riveted some of the top skins. right wing

 11-28-2005
3.00
Riveted bottom skin on left flap

 11-27-2005
4.00
finished drilling flap parts and primed them

 11-26-2005
8.00
Match drilled and dimpled flap parts

 11-25-2005
1.00
Installed inspection plate on right tank

 11-24-2005
3.00
De-burring flap ribs and spars

 11-24-2005
4.00
De-burred and dimpled top wing skins, right wing
Details

 11-23-2005
1.00
De-burred flap spars

 11-21-2005
3.00
Dimpled ribs and top inboard skin of right wing.
Details

 11-20-2005
4.00
De-burred and dimpled right wing ribs

 11-19-2005
10.00
Installed leading edge on right wing
Details

 11-18-2005
5.00
Intstalled rear baffle on right fuel tank

 11-13-2005
5.00
Riveted end ribs on right fuel tank

 11-12-2005
1.50
Ran vent line in right tank
       

 11-11-2005
5.00
Riveted last two internal ribs in right fuel tank

 11-10-2005
2.50
Riveted one rib in right fuel tank

 11-09-2005
2.50
Riveted and sealed one rib in right fuel tank

 11-08-2005
2.50
Sealed and riveted one rib of right fuel tank
Details

 11-07-2005
0.75
Prepared tank ribs
Details

 11-06-2005
7.00
Riveted right leading edge

 11-05-2005
5.00
Riveted stiffeners onto right tank skin
       

 11-05-2005
1.50
Riveted fuel filler ring and tank drain fitting
Details
       

 11-04-2005
3.00
deburred and dimpled rigtht fuel tank skin

 11-02-2005
2.50
Drilled z brackets for right fuel tank
Details

 11-01-2005
2.00
Installed nut-plates on z-brackets for right fuel

 10-31-2005
3.00
Started right fuel tank

 10-30-2005
6.00
Drilled right wing skins
Details

 10-27-2005
2.00
Pulled plastic from flap parts
Details

 10-26-2005
2.00
Finished left aileron
Details
       

 10-25-2005
4.00
riveted left aileron
       

 10-24-2005
3.00
Deburred and dimpled left aileron

 10-23-2005
5.00
finished riveting right aileron

 10-18-2005
3.50
Primed aileron stuctures, started assembly
       

 10-16-2005
2.00
ailerons
Details

 10-14-2005
3.00
Ailerons

 10-13-2005
2.00
Ailerons

 10-12-2005
3.00
Ailerons

 10-10-2005
3.00
Cleaned up and drilled aileron stiffers

 10-09-2005
6.00
Riveted flap and aileron fairings left wing
Details
     

 10-07-2005
2.00
Deburring flap and aileron fairings

 10-05-2005
3.00
Aileron brackets

 10-04-2005
3.00
Fitting tank and moving wing to table form jig

 10-03-2005
2.50
Finished adding proseal to back of tank

 10-02-2005
2.00
Finished riveting top left skins

 10-02-2005
3.00
Finished all riveting on top skin left wing
     

 09-29-2005
2.00
Riveting top outboard skin left wing

 09-26-2005
1.50
Riveting skins left wing
Details
       

 09-26-2005
1.00
Deburred and dimpled more ribs, left wing.
     

 09-25-2005
1.00
Riveted left inboard skin to one rib

 09-24-2005
3.00
Deburred and dimpled top inboard skin left wing
Details

 09-23-2005
2.00
Dimpled ribs for top inboard skin

 09-20-2005
3.00
deburred rib holes for inboard skins

 09-19-2005
4.00
Riveting left leading edge to spar

 09-18-2005
5.00
Riveting left leading edge to spar

 09-17-2005
8.00
Left wing
Details

 09-03-2005
3.00
Installed outboard rib in left tank

 09-02-2005
2.00
left fuel tank, installed vent line
       

 09-01-2005
3.00
installed one rib in left fuel tank

 08-31-2005
2.00
Installed one rib, left fuel tank

 08-30-2005
3.00
Installed one rib, left fuel tank

 08-29-2005
3.00
Installed one rib in left tank

 08-28-2005
3.00
Installed one rib in left tank

 08-27-2005
3.00
fabricated fuel pick-up tubes, both tanks

 08-26-2005
2.00
left tank

 08-25-2005
3.00
left tank

 08-24-2005
3.00
rivet drain flange and anti rotation bracket, left

 08-23-2005
6.00
Preped left fuel tank and prosealed filler neck

 08-22-2005
3.00
Prepared tanks parts for both tanks

 08-21-2005
8.00
left fuel tank

 08-20-2005
8.00
Worked on left fuel tank

 08-19-2005
3.00
left fuel tank
     

 08-18-2005
3.00
left fuel tank

 08-17-2005
2.00
level wing in wing stand

 08-16-2005
3.00
left wing

 08-15-2005
2.50
Fabricated and drilled wing walk doublers
Details

 08-13-2005
6.00
Claened and Primed right main ribs

 08-12-2005
1.50
drilled conduit hole in right ribs and deburred ri

 08-09-2005
3.00
Moved left wing back to wing stand.
Details

 08-08-2005
2.50
Riveting ribs to rear spar on left wing

 08-07-2005
4.00
Rivet main ribs to left main spar

 08-03-2005
3.00
Washed left wing ribs

 07-31-2005
3.00
moving wing to table, and match drilling ribs to s

 07-20-2005
1.00
Finished deburring main ribs

 07-19-2005
2.00
worked on wing jig

 07-17-2005
1.00
First assembly of ribs to spar left wing

 07-14-2005
2.50
Deburred and fluted 9 ribs

 07-13-2005
2.50
Cleaning up ribs

 07-12-2005
1.50
Cleaning up fibs

 07-11-2005
3.00
Deburring wing ribs

 07-10-2005
8.00
Rear spars
Details

 07-09-2005
8.00
Started rear spars
Details

 07-08-2005
3.00
Finished mounting the nutplates
Details

 07-07-2005
3.00
Countersunk nutplate holes in spars

 07-06-2005
3.00
Tie down brackets

 07-05-2005
3.00
Continied mounting nutplates

 07-04-2005
6.00
Started mounting nutplates on spars










Copyright © 2001-2024 Matronics. All Rights Reserved.