KitLog pro

Powered By Kitlog Pro v2.0

Greg's Bearhawk Build
Work Logs Found: 33
Category Work Time: 200 Hours
 Date
Hours
Work Log Summary

Details

 03-05-2017
7.50
Left Elevator
Details
       

 03-04-2017
6.00
Covering tail parts.
Details
       

 02-25-2017
15.00
kitlog is pissing me off
Details

 02-14-2017
6.00
lots of little things
Details
     

 02-13-2017
6.50
bulkhead pass through
Details
     

 02-06-2017
5.50
ELT wiring
Details
     

 02-05-2017
4.50
fuel valve and fuel lines
Details
     

 02-04-2017
6.00
fuel lines, fuel valve
Details
     

 01-31-2017
6.00
ELT antenna, pitot static, fuel pump
Details
       

 01-27-2017
7.00
Hard lines
Details
       

 01-23-2017
5.00
stand offs
Details

 01-22-2017
7.00
vent line, brake lines
Details

 01-21-2017
6.50
Fuel lines
Details

 01-15-2017
5.00
misc.
Details

 01-15-2017
4.50
Cables
Details
       

 01-14-2017
7.00
Putting stuff back in!
Details
       

 01-13-2017
6.50
Painting the interior
Details

 01-12-2017
8.50
More tear down
Details

 01-07-2017
5.00
Priming
Details

 01-02-2017
6.50
Sanding rust
Details

 12-27-2016
8.00
Welding
Details

 12-05-2016
6.00
Hoist welding
Details
     

 10-14-2016
6.00
tear down
Details

 05-08-2016
6.00
Cowl
Details
     

 05-07-2016
7.50
Nose bowl
Details
     

 04-03-2016
4.00
skin cleaning
Details

 04-02-2016
6.00
Skin deburring
Details

 03-20-2016
6.00
Top of panel
Details
       

 03-14-2016
6.00
Control cables
Details

 12-15-2015
2.50
Boot cowl and tailwheel
Details
       

 12-12-2015
3.50
Pieces of the puzzle
Details
       

 11-10-2015
2.00
Left door
Details
       

 10-28-2015
5.00
Right door
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.