Powered By Kitlog Pro v2.0
Neils Web Site
RV9A
Avionics
Work Logs Found:
106
Category Work Time:
332 Hours
Date
Hours
Work Log Summary
Details
05-02-2022
5.00
Install and Plumb Pitot - Static
Details
03-06-2019
4.00
Pitot Static and Transponder checks
Details
03-05-2019
2.00
Configure engine guages
Details
03-01-2019
4.00
Calabrate fuel Guages
Details
02-26-2019
3.00
Magnetometer calibration
Details
02-25-2019
3.00
AHARS Setup
Details
02-22-2019
2.00
Update Software for G3x and GTN650
Details
06-21-2018
3.00
Secure wiring from panel to fuselage
Details
06-18-2018
2.00
Co-Pilot Grip wiring
Details
06-15-2018
2.00
Control stick wiring for Co-Pilot Side
Details
06-14-2018
2.00
Control stick wiring for Pilot Side
Details
06-06-2018
3.00
Complete install of ELT
Details
05-31-2018
4.00
Terminate and Fabricate ELT wiring
Details
05-29-2018
5.00
Mount ELT
Details
05-18-2018
4.00
Install ELT Antenna
Details
05-01-2018
4.00
Install AOA display
Details
04-26-2018
3.00
Install VOR antenna
Details
04-25-2018
3.00
Prep right wing tip and VOR antenna for install
Details
04-11-2018
3.00
Run coax for VOR antenna in right wing
Details
04-10-2018
3.00
Install landing and taxi lights into right wing ti
Details
04-09-2018
4.00
Continue installing antennas
Details
04-03-2018
3.00
Continue installing antennas
Details
03-26-2018
3.00
Continue installing antennas
Details
03-09-2018
3.00
Rivet Doubler Plates for Atnennas
Details
03-07-2018
3.00
Wire Taxi and Landing lights to Panel
Details
03-06-2018
3.00
Fit Landing, Taxi and Nav lights to right wing tip
Details
03-05-2018
2.00
Alodine and prime bottom of antenna doublers
Details
03-02-2018
2.00
Prep all 6 antenna douplers for Alodine
Details
03-01-2018
3.00
Drill out Com 1 Doubler
Details
02-20-2018
4.00
Drill in Doubler plates for GPSs
Details
02-19-2018
4.00
Drill in Doubler plates for Trans, ADSB and Com2
Details
12-16-2017
3.00
Fabricate bracket for relay decks
Details
12-08-2017
3.00
Run RG400 coax for Antennas
Details
12-07-2017
4.00
Antenna Pre Installation
Details
12-01-2017
4.00
Wire flap position sensor
Details
11-28-2017
3.00
Run wire between rudder and panel for Strobes
Details
11-27-2017
4.00
Wire and install Elevator Trim
Details
11-20-2017
5.00
Install Flap Position Sensor
Details
11-06-2017
3.50
Calabrate Aileron Trim for Panel
Details
11-03-2017
1.50
Power Panel for first time
Details
11-02-2017
3.00
Install Pitot Heat breaker and switch
Details
11-01-2017
2.50
Drill panel for pitot heat breaker and switch
Details
10-31-2017
4.00
Fit left Wingtip Nav and Strobe lights
Details
10-30-2017
4.00
Fit left Wingtip landing and Taxi lights
Details
10-27-2017
4.00
Final fit of Autopilot Pitch Servo
Details
10-26-2017
3.00
Initial assembly and fitting for Autopilot Pitch S
Details
10-24-2017
4.00
Complete Electric Trim attachment to Ailerons
Details
09-29-2017
3.00
Complete Static Port Plumbing
Details
09-28-2017
4.00
Install Static Ports
Details
09-27-2017
4.00
Install Aileron trim motor and bracket btw ribs
Details
09-26-2017
2.00
Attach trim motor to Aileron trim bracket
Details
09-20-2017
3.00
AHRS plumbing and electrical connections
Details
09-19-2017
1.50
Run OAT wire to AHRS and repin to DB15
Details
09-19-2017
1.50
Fill joint between wingtip cutout and wingtip
Details
09-18-2017
3.00
Fabricate and install doubler for OAT
Details
09-08-2017
4.00
Run wire for OAT from wing to AHRS
Details
09-07-2017
2.00
Install GMU 22
Details
09-06-2017
2.50
GMU 22 mount plate and bracket
Details
08-22-2017
4.00
Drill fuselage bulkheads for wire routing
Details
08-21-2017
5.00
Fabricate and install right arm rest channel
Details
08-18-2017
3.00
Installed Right Arm rest channel
Details
08-17-2017
3.00
Right wiring channel
Details
08-16-2017
2.00
Install GSU25 (AHRS) to back of GDU460
Details
08-15-2017
2.00
Replace floor boards
Details
08-04-2017
3.00
Cut wingtip inserts for lighting
Details
08-03-2017
3.00
Cut left wingtip for lighting insert
Details
08-02-2017
2.00
Run 12ga wire from pitot to panel
Details
08-01-2017
3.00
Install Pitot / AOA sensor
Details
07-31-2017
3.00
Rivet Pitot Support hardware onto left wing
Details
06-28-2017
8.00
Install Auto Piltot Roll Servo
Details
06-27-2017
1.50
Prime Pitot Support Hardware
Details
06-26-2017
4.00
Cut hole in lower left wing for Pitot and AOA
Details
06-23-2017
4.00
Run tubes for Pitot and AOA
Details
06-22-2017
3.50
Install wiring for left wing lights to panel
Details
06-21-2017
3.00
Route wiring from Pilot stick
Details
06-20-2017
2.50
Route wiring from Co Pilot stick
Details
06-19-2017
3.50
Install wiring for right wing lights to panel
Details
06-15-2017
2.00
Route connection to Right wing fuel level sender
Details
06-13-2017
5.00
Run cable thru wing for Auto Pilot Roll Servo
Details
06-12-2017
3.50
Attach connector shells for engine sensors
Details
06-09-2017
3.00
Run cable from GEA24 thur fire wall
Details
06-08-2017
3.00
Attach pins to Oil, Fuel, Manafold, engine sensors
Details
06-07-2017
2.00
Connect and test Primer valve power
Details
06-06-2017
4.00
Install Fuel Flow Transducer
Details
05-25-2017
2.50
Install RPM sensor on right (non implulse) mag
Details
05-24-2017
2.00
Install Oil temp/pres, MP, fuel pres sensors
Details
05-24-2017
3.00
Fit and drill in Pitot and AOA mount
Details
05-23-2017
3.00
Complete contection GEA24 to EGT and CHT probes
Details
05-09-2017
3.00
Install and wire primer selonoid switch
Details
04-26-2017
3.00
Power control wiring
Details
04-24-2017
1.50
Drill hold for Avionics power lead and contactors
Details
04-23-2017
3.00
Mount Avionics bus and Common Ground
Details
04-17-2017
3.00
Install Panel and start connecting interfaces
Details
04-13-2017
2.00
Fabricate and Install Alternator Cables
Details
04-05-2017
2.00
Mount fuse holder for alternator
Details
04-04-2017
2.00
Mount interface Avionics to sub panel
Details
04-03-2017
3.00
Install Platenuts on left sub panel
Details
04-01-2017
3.00
Install Platenuts on right sub panel
Details
03-27-2017
3.00
Mounted Transponder onto back of Sub Panel
Details
03-19-2017
4.00
Fit panel into foward fusalage
Details
03-09-2017
4.00
Modify sub panel and center Rib for avionics panel
Details
03-06-2017
5.00
Fit panel onto mockup of forward ribs and subpanel
Details
03-03-2017
2.00
installed egt sensors
Details
03-01-2017
3.00
Layed out Panel and associated avionics
Details
02-15-2017
5.00
Uncreated Panel and inventory contents
Details
11-13-2015
1.00
Received Panel
Details
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
858
3468
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
188
800
Firewall Forward
142
564
Fuselage
178
700
Miscellaneous
3
25
None
2
40
Wings
87
460
Copyright © 2001-2025 Matronics. All Rights Reserved.