Powered By Kitlog Pro v2.0
MIKE'S WEB SITE
RV-7
Avionics
Work Logs Found:
46
Category Work Time:
177 Hours
Date
Hours
Work Log Summary
Details
08-16-2016
2.00
Fuel Calibration
Details
08-12-2016
1.00
ELT
Details
10-28-2015
6.00
Top skin install.
Details
10-15-2015
0.50
Behind Panel Pictures
10-14-2015
8.00
Mounted switches etc.
Details
09-24-2015
6.00
Panel
Details
09-22-2015
3.00
RPM
Details
08-29-2015
8.00
Worked on decals for panel
Details
05-31-2015
1.00
Comms still getting static. Setup for gear leg ins
05-30-2015
4.00
Tested comms again. Installed flap motor
05-22-2015
2.00
More wiring cleanup behind the panel
05-21-2015
3.00
Cleaned up some wiring with zip ties.
05-14-2015
0.50
Installed ELT battery
Details
05-13-2015
7.00
Tried coms outside and more wiring
Details
05-09-2015
10.00
Redo of intercom harness
Details
05-09-2015
5.00
Prepped for other holes in panel
Details
05-05-2015
2.00
Cut holes in carbon from backer
Details
05-04-2015
3.00
Prepped panel for glue
Details
04-29-2015
3.00
Lighting
Details
04-27-2015
8.00
Wiring
Details
04-24-2015
4.00
Wiring
Details
04-20-2015
3.00
Research for com/intercom
Details
04-19-2015
4.00
Wiring
Details
04-16-2015
6.00
More cutting of panel
Details
04-15-2015
5.00
Avionics and wiring
Details
04-14-2015
5.00
Wired Landing Lights
Details
04-13-2015
2.50
Avionics
Details
04-12-2015
6.00
Layout and Grips
Details
04-01-2015
7.00
Pilot and copilot stick grip wiring.
Details
03-31-2015
1.00
Wiring
Details
03-31-2015
3.00
Installed roll trim servo. Root connections.
Details
03-29-2015
4.50
Molex connectors. More wiring.
Details
03-28-2015
2.00
Finished batter mount and worked on stick grip set
Details
03-26-2015
6.00
Recieved dynon order and stick grips.
Details
03-05-2015
7.00
Electrical work aft of baggage
Details
03-04-2015
1.00
Wiring for adsb and transponder
03-03-2015
2.00
Pulled some more wires through the center tunnel
03-03-2015
4.00
Electrical work mainly aft of baggage
Details
02-27-2015
4.00
Avionics planning
Details
01-21-2015
3.00
Electric runs to tail. Mounted empannage.
Details
01-03-2015
4.50
Tail electric runs and empannage gap cover.
Details
01-02-2015
1.00
New connector for elevator trim servo
Details
12-21-2014
4.00
Crimped BNC connectors on ELT antenna
Details
08-05-2014
0.75
Solder ELT Din connector
Details
07-23-2014
2.00
Made new pitot line supports
Details
07-23-2014
1.50
Electrical Prep
Details
SITE NAVIGATION
Contact Builder
4 Place B Home
RV-7 Home
Category
# Logs
# Hours
All
406
1641
Avionics
46
177
Empennage
72
204
Engine
4
14
Final
5
7
Finish Kit
86
409
Fuselage
117
490
FWF
41
210
Miscellaneous
1
2
Shop Supplies
1
Wings
33
128
Copyright © 2001-2024 Matronics. All Rights Reserved.