KitLog pro

Powered By Kitlog Pro v2.0

MIKE'S WEB SITE
Work Logs Found: 46
Category Work Time: 177 Hours
 Date
Hours
Work Log Summary

Details

 08-16-2016
2.00
Fuel Calibration
Details

 08-12-2016
1.00
ELT
Details

 10-28-2015
6.00
Top skin install.
Details
       

 10-15-2015
0.50
Behind Panel Pictures
       

 10-14-2015
8.00
Mounted switches etc.
Details
       

 09-24-2015
6.00
Panel
Details
       

 09-22-2015
3.00
RPM
Details
     

 08-29-2015
8.00
Worked on decals for panel
Details
       

 05-31-2015
1.00
Comms still getting static. Setup for gear leg ins
     

 05-30-2015
4.00
Tested comms again. Installed flap motor

 05-22-2015
2.00
More wiring cleanup behind the panel
     

 05-21-2015
3.00
Cleaned up some wiring with zip ties.

 05-14-2015
0.50
Installed ELT battery
Details
     

 05-13-2015
7.00
Tried coms outside and more wiring
Details
       

 05-09-2015
10.00
Redo of intercom harness
Details
       

 05-09-2015
5.00
Prepped for other holes in panel
Details
       

 05-05-2015
2.00
Cut holes in carbon from backer
Details
     

 05-04-2015
3.00
Prepped panel for glue
Details
     

 04-29-2015
3.00
Lighting
Details
       

 04-27-2015
8.00
Wiring
Details
     

 04-24-2015
4.00
Wiring
Details
       

 04-20-2015
3.00
Research for com/intercom
Details
       

 04-19-2015
4.00
Wiring
Details
       

 04-16-2015
6.00
More cutting of panel
Details
       

 04-15-2015
5.00
Avionics and wiring
Details
       

 04-14-2015
5.00
Wired Landing Lights
Details
       

 04-13-2015
2.50
Avionics
Details
       

 04-12-2015
6.00
Layout and Grips
Details
       

 04-01-2015
7.00
Pilot and copilot stick grip wiring.
Details
       

 03-31-2015
1.00
Wiring
Details

 03-31-2015
3.00
Installed roll trim servo. Root connections.
Details
       

 03-29-2015
4.50
Molex connectors. More wiring.
Details
       

 03-28-2015
2.00
Finished batter mount and worked on stick grip set
Details
       

 03-26-2015
6.00
Recieved dynon order and stick grips.
Details
       

 03-05-2015
7.00
Electrical work aft of baggage
Details
       

 03-04-2015
1.00
Wiring for adsb and transponder
       

 03-03-2015
2.00
Pulled some more wires through the center tunnel

 03-03-2015
4.00
Electrical work mainly aft of baggage
Details
       

 02-27-2015
4.00
Avionics planning
Details
       

 01-21-2015
3.00
Electric runs to tail. Mounted empannage.
Details
       

 01-03-2015
4.50
Tail electric runs and empannage gap cover.
Details
       

 01-02-2015
1.00
New connector for elevator trim servo
Details

 12-21-2014
4.00
Crimped BNC connectors on ELT antenna
Details
       

 08-05-2014
0.75
Solder ELT Din connector
Details
     

 07-23-2014
2.00
Made new pitot line supports
Details
     

 07-23-2014
1.50
Electrical Prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.