KitLog pro

Powered By Kitlog Pro v2.0

Steves S-20 Build Site.
Work Logs Found: 41
Category Work Time: 384 Hours
 Date
Hours
Work Log Summary

Details

 07-10-2016
20.00
Finished Covering!!!!!!!!!!!
Details
       

 06-30-2016
2.00
Fixed Wavy Tapes.
Details
       

 06-25-2016
12.00
Covered The Flaps.
Details
     

 06-15-2016
20.00
Covered The Doors.
Details
       

 06-03-2016
10.00
Finished Fuselage Tapes!
Details
       

 05-30-2016
6.00
4" Tape Along Top Former and Fin Patch.
Details
       

 05-28-2016
6.00
Tapes along the fin.
Details
       

 05-26-2016
6.00
Tapes on the Fuselage Longerons.
Details
       

 05-22-2016
10.00
More FuselageTapes.
Details
       

 05-19-2016
4.00
Fuselage Tapes.
Details
     

 05-16-2016
3.00
Ironed the Fuselage Patches and Started Tapes.
Details
       

 05-14-2016
10.00
Finished Fuselage Patches.
Details
       

 05-07-2016
10.00
Installed Fuselage Patches - Part 1.
Details
       

 05-01-2016
6.00
Installed Plastic Reinforcements On The Fuselage
Details
       

 04-30-2016
10.00
Finsh Baggage Windows and Shrink Fuselage Fabric.
Details
       

 04-24-2016
10.00
Covered RH side of fuselage.
Details
       

 04-23-2016
2.00
Clean up of LH fuselage covering.
Details
       

 04-19-2016
12.00
Covered LH Side of Fuselage.
Details
       

 04-16-2016
10.00
Cover Bottom Of Fuselage.
Details
       

 04-05-2016
2.00
Antenna Plate Spacer and Header Tank.
Details
       

 04-03-2016
7.00
Build Fuselage Stand.
Details
       

 03-27-2016
10.00
Leading Edge Tapes.
Details
       

 03-20-2016
6.00
Tapes on the Trail and Tip Bow.
Details

 03-19-2016
8.00
Tapes for the LE Wrap and Root Ribs.
Details
       

 03-12-2016
8.00
Tapes over the rib bottoms.
Details
     

 03-06-2016
10.00
Tape over Top of Ribs.
Details
       

 03-05-2016
12.00
Wing Reinforcements and Patches.
Details
       

 02-24-2016
8.00
Prepared the wing reinforcements and patches.
Details
       

 02-21-2016
12.00
Riveted Cap Strips In Place.
Details
       

 02-19-2016
16.00
Shrink Wing Fabric and Start Cap Strip Install.
Details
       

 01-20-2016
10.00
Covering Bottom of RH Wing.
Details
       

 01-16-2016
8.00
Covering Top of RH Wing.
Details
       

 01-03-2016
12.00
Covered the bottom of the LH wing.
Details
       

 12-29-2015
12.00
Wing Covering - Part 1
Details
       

 12-23-2015
6.00
Covering the Ailerons - Part 2.
Details
       

 12-16-2015
8.00
Covering the Ailerons - Part 1.
Details
       

 12-09-2015
12.00
Covering of the Rudder.
Details
       

 11-30-2015
15.00
Tapes and patches on the elevators.
Details
       

 11-15-2015
15.00
Covering of Elevators.
Details
       

 10-28-2015
15.00
Covering Stabilizers
Details
       

 10-21-2015
3.00
First Covering Success
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.