Powered By Kitlog Pro v2.0
Steves S-20 Build Site.
S-20 Raven
Covering
Work Logs Found:
41
Category Work Time:
384 Hours
Date
Hours
Work Log Summary
Details
07-10-2016
20.00
Finished Covering!!!!!!!!!!!
Details
06-30-2016
2.00
Fixed Wavy Tapes.
Details
06-25-2016
12.00
Covered The Flaps.
Details
06-15-2016
20.00
Covered The Doors.
Details
06-03-2016
10.00
Finished Fuselage Tapes!
Details
05-30-2016
6.00
4" Tape Along Top Former and Fin Patch.
Details
05-28-2016
6.00
Tapes along the fin.
Details
05-26-2016
6.00
Tapes on the Fuselage Longerons.
Details
05-22-2016
10.00
More FuselageTapes.
Details
05-19-2016
4.00
Fuselage Tapes.
Details
05-16-2016
3.00
Ironed the Fuselage Patches and Started Tapes.
Details
05-14-2016
10.00
Finished Fuselage Patches.
Details
05-07-2016
10.00
Installed Fuselage Patches - Part 1.
Details
05-01-2016
6.00
Installed Plastic Reinforcements On The Fuselage
Details
04-30-2016
10.00
Finsh Baggage Windows and Shrink Fuselage Fabric.
Details
04-24-2016
10.00
Covered RH side of fuselage.
Details
04-23-2016
2.00
Clean up of LH fuselage covering.
Details
04-19-2016
12.00
Covered LH Side of Fuselage.
Details
04-16-2016
10.00
Cover Bottom Of Fuselage.
Details
04-05-2016
2.00
Antenna Plate Spacer and Header Tank.
Details
04-03-2016
7.00
Build Fuselage Stand.
Details
03-27-2016
10.00
Leading Edge Tapes.
Details
03-20-2016
6.00
Tapes on the Trail and Tip Bow.
Details
03-19-2016
8.00
Tapes for the LE Wrap and Root Ribs.
Details
03-12-2016
8.00
Tapes over the rib bottoms.
Details
03-06-2016
10.00
Tape over Top of Ribs.
Details
03-05-2016
12.00
Wing Reinforcements and Patches.
Details
02-24-2016
8.00
Prepared the wing reinforcements and patches.
Details
02-21-2016
12.00
Riveted Cap Strips In Place.
Details
02-19-2016
16.00
Shrink Wing Fabric and Start Cap Strip Install.
Details
01-20-2016
10.00
Covering Bottom of RH Wing.
Details
01-16-2016
8.00
Covering Top of RH Wing.
Details
01-03-2016
12.00
Covered the bottom of the LH wing.
Details
12-29-2015
12.00
Wing Covering - Part 1
Details
12-23-2015
6.00
Covering the Ailerons - Part 2.
Details
12-16-2015
8.00
Covering the Ailerons - Part 1.
Details
12-09-2015
12.00
Covering of the Rudder.
Details
11-30-2015
15.00
Tapes and patches on the elevators.
Details
11-15-2015
15.00
Covering of Elevators.
Details
10-28-2015
15.00
Covering Stabilizers
Details
10-21-2015
3.00
First Covering Success
Details
SITE NAVIGATION
Contact Builder
S-20 Raven Home
Category
# Logs
# Hours
All
197
1269
Avionics
10
79
Covering
41
384
Empennage
1
5
Engine
4
11
Fuselage
55
225
Miscellaneous
26
156
Painting
27
268
Prop
1
2
Wings
32
139
Copyright © 2001-2024 Matronics. All Rights Reserved.