Powered By Kitlog Pro v2.0
Davids Web Site
RV-8
Wings
Work Logs Found:
36
Category Work Time:
86 Hours
Date
Hours
Work Log Summary
Details
11-02-2017
1.00
Installed Garmin GSA28 Roll Servo
04-08-2016
2.00
Landing Light Ballast Mounting Bracket.
Details
04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 3
Details
04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 2
Details
04-01-2016
2.00
Duckworks Taxi Light Right Wing Part 1
Details
03-24-2016
0.50
Pitot and AOA tubing Part 2
Details
03-24-2016
1.00
Pitot and AOA tubing Part 1
Details
02-25-2016
2.00
Duckworks Landing Light Part 5
Details
02-25-2016
3.00
Duckworks Landing Light Part 4
Details
02-23-2016
2.00
Duckworks Landing Light Part 3
Details
02-23-2016
2.00
Duckworks Landing Light Part 2
Details
02-23-2016
2.00
Duckworks Landing Light Part 1
Details
02-21-2016
1.00
Mounting the Dynon Heated Pitot Controller.
Details
02-11-2016
3.00
Final preparation of the outboard wing skin.
Details
02-10-2016
1.00
Installing the Gretz Pitot Tube Mount Part 5
02-10-2016
3.50
Finishing the flap hinge, adding aileron stop.
Details
02-08-2016
1.50
Installing the Gretz Pitot Tube Mount Part 4
02-07-2016
1.00
Installing the Gretz Pitot Tube Mount Part 3
Details
02-06-2016
0.50
Installing the Gretz Pitot Tube Mount Part 2
Details
02-06-2016
4.50
Installing the Gretz Pitot Tube Mount Part 1
Details
02-05-2016
3.00
Fixing the left and right flap brace
Details
02-04-2016
1.50
Mounting the right Flap.
Details
12-15-2015
3.00
Installing wing conduit Part 1
Details
12-13-2015
1.00
Aft outboard wing panel
Details
12-12-2015
4.00
Preparing the outboard rear wing skin panel.
Details
12-11-2015
4.50
Preparing the Flap Brace panels for installation.
Details
12-04-2015
4.50
Preparing the Aileron Gap Fairings
Details
11-06-2015
3.00
Preparing the Aileron Attach Brackets.
Details
11-01-2015
2.00
Preparing the Flap Brace and Aileron Gap Fairings.
Details
10-31-2015
2.00
Installing the Aileron Brackets Part 3
Details
10-29-2015
3.00
Installing the Aileron Brackets part 2
Details
10-29-2015
6.00
Installing the Aileron Brackets part 1
Details
10-28-2015
3.00
Preparing the Aileron Brackets
Details
10-07-2015
1.50
Preparing the aileron pushrods part 2
Details
10-07-2015
3.00
Preparing the Aileron Pushrods part 1
Details
06-09-2015
3.00
Built the wing dolly
Details
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
235
678
Avionics
1
3
Brake System
4
10
Canopy
4
6
Electrical Wiring
4
12
Elevator
18
50
Empennage
46
119
Engine
32
86
Fuel System
4
18
Fundamentals Class
1
8
Fundementals Class
1
8
Fundementals of Buil
1
8
Fuselage
82
261
Practice kit
1
3
Wings
36
86
Copyright © 2001-2025 Matronics. All Rights Reserved.