Powered By Kitlog Pro v2.0
Johns Web Site
Highlander
Fabric
Work Logs Found:
32
Category Work Time:
204 Hours
Date
Hours
Work Log Summary
Details
08-10-2015
4.00
Rudder cable fairings
Details
08-05-2015
3.00
fuselage inspection rings
Details
08-03-2015
22.00
Tapes
Details
07-28-2015
4.00
Fuselage Reinforcement Doilies and fabric shrink
Details
07-27-2015
3.00
Inspection Rings
Details
07-26-2015
3.00
Tapes
Details
07-18-2015
3.00
Tapes
Details
07-17-2015
5.00
Tapes
Details
07-16-2015
6.00
Tapes
Details
07-15-2015
4.00
Fabric Rivets on Wing
Details
07-13-2015
4.00
Tapes
Details
07-10-2015
6.00
Tapes
Details
07-09-2015
12.00
Aileron and Flap Tapes
Details
07-05-2015
5.00
Tapes
Details
07-04-2015
4.00
Reinforcement doilies and fabric rivets
Details
07-03-2015
0.00
Everything is Covered!
Details
07-02-2015
8.00
Covered Ailerons
Details
06-29-2015
10.00
Covered Flaps
Details
06-26-2015
10.00
Covered Letf Elevator and Rudder
Details
06-24-2015
5.00
Reinforcement doilies, shrink fabric, cover trim t
Details
06-23-2015
3.00
Made doilies for right wing
Details
06-23-2015
5.00
Covered Top Of Right Wing
Details
06-20-2015
2.00
Prepped top of right wing for covering
Details
06-20-2015
2.00
Ironing Left Wing
Details
06-19-2015
7.00
Covered Bottom of Right Wing
Details
06-17-2015
7.00
Covered Top of Left Wing
Details
06-14-2015
10.00
Covered Bottom of Left Wing
Details
06-04-2015
20.00
Cover Both sides of Fuselage
Details
05-10-2015
3.00
Fabric Reinforcement Patches
Details
05-07-2015
6.00
Cover Bottom of Fuselage
Details
10-12-2014
8.00
Covered Horizontal Stabs & Right Elevator
Details
10-06-2014
10.00
Fabric Plates
Details
SITE NAVIGATION
Contact Builder
Highlander Home
Category
# Logs
# Hours
All
233
1225
Electrical
10
94
Empennage
4
20
Engine
20
109
Fabric
32
204
Flaps
13
67
Flaps/Ailerons
13
67
Fuel System
5
23
Fuselage
48
178
Getting Started
1
Landing Gear
2
3
Misc
1
4
Miscellaneous
1
4
Paint
27
200
Panel
7
41
Prop
1
2
Tools
3
2
Wings
45
207
Copyright © 2001-2024 Matronics. All Rights Reserved.