Powered By Kitlog Pro v2.0
Johns Web Site
Highlander
Fuselage
Work Logs Found:
48
Category Work Time:
178 Hours
Date
Hours
Work Log Summary
Details
09-08-2017
3.00
Fit Turtle Deck
Details
09-03-2017
3.00
Completed Installation of Doors
Details
08-30-2017
5.00
Odds & Ends
Details
08-12-2017
3.00
Installed Chafe Seal
Details
08-11-2017
8.00
Trim/Fit Doors
Details
08-08-2017
4.00
Installed Winshield and Rear Windows
Details
08-06-2017
12.00
Covered doors with Polycarbonite
Details
08-04-2017
6.00
Installed Doors
Details
06-11-2017
6.00
Mounted Turtle Deck
Details
06-06-2017
4.00
Windshield Installation
Details
06-05-2017
3.00
Mounted Boot Cowl
Details
06-04-2017
4.00
Windshield Front Angle Brackets & Boot Cowl.
Details
06-02-2017
5.00
Front and Rear Windshield Brackets
Details
09-09-2016
3.00
Modified Aft Baggage Bulkhead
Details
09-05-2016
2.00
Installed Brake Lines
Details
09-04-2016
2.00
Installed Toe Brakes
Details
09-03-2016
2.00
Stretched Bungies
Details
09-02-2016
3.00
Re-Installed Landing Gear
Details
09-02-2016
2.00
Landing Gear Bungees
Details
07-30-2016
2.00
Floor Panels
Details
07-30-2016
2.00
Floor Panels
Details
06-02-2016
3.00
Boot Cowls
Details
05-20-2016
2.00
Rivited Seat Pans
Details
05-18-2016
5.00
Installed Rudder Pedal Assembly and Toe Brakes
Details
05-15-2016
2.00
Rear Floor Boards
Details
05-10-2015
1.00
Body Filler Top Stringer
Details
05-09-2015
6.00
Installed Vertical Stab & Top Stringer
Details
10-25-2014
4.00
Bottom Stringer
Details
10-21-2014
4.00
Side Stringers
Details
10-21-2014
1.00
Boot Cowl Tabs
Details
05-18-2014
3.00
Firewall
Details
05-14-2014
2.00
Window Frames
Details
05-14-2014
3.00
Tailwheel
Details
05-12-2014
5.00
Landing Gear
Details
05-11-2014
4.00
Boot Cowl
Details
05-10-2014
3.00
Window Frames
Details
05-05-2014
3.00
Clompleted Trim Assembly/Paper Templates
Details
05-02-2014
6.00
Assembled Seats
Details
04-29-2014
6.00
Built Trim Assembly
Details
04-28-2014
3.00
Engine Turn firewall
Details
04-26-2014
7.00
Completed floorboard Instalation
Details
04-23-2014
5.00
Installed Seats
Details
04-21-2014
4.00
Assembled Elevator
Details
04-20-2014
2.00
Assembled Horizontal Stab
Details
04-20-2014
3.00
Assembled Control Stick Mixer
Details
04-18-2014
3.00
Fitted Rudder Pedals
Details
10-14-2013
2.00
Fitted Vert Stab and Rudder
Details
10-13-2013
1.50
Floor Panels
Details
SITE NAVIGATION
Contact Builder
Highlander Home
Category
# Logs
# Hours
All
233
1225
Electrical
10
94
Empennage
4
20
Engine
20
109
Fabric
32
204
Flaps
13
67
Flaps/Ailerons
13
67
Fuel System
5
23
Fuselage
48
178
Getting Started
1
Landing Gear
2
3
Misc
1
4
Miscellaneous
1
4
Paint
27
200
Panel
7
41
Prop
1
2
Tools
3
2
Wings
45
207
Copyright © 2001-2024 Matronics. All Rights Reserved.