Powered By Kitlog Pro v2.0
Johns Web Site
RV-12iS
21.0 Mid Fuse Ribs a
Work Logs Found:
36
Category Work Time:
118 Hours
Date
Hours
Work Log Summary
Details
05-15-2016
0.50
Tightened Block studs
Details
05-06-2016
4.00
F-1213-R step floor & F-1202F nutplates
Details
05-02-2016
2.00
F-1202F Nutplates and F-1213-L step floor
Details
05-01-2016
5.00
F-1202F bulkhead and steps
Details
04-30-2016
6.00
Baggage bulkhead and autopilot brackets
Details
04-24-2016
5.00
Bottom Skin Installation and Reiveting
Details
04-23-2016
1.00
Clecoed bottom skin to fuselage frame
Details
04-21-2016
2.50
Add nutplates to bottom skin access holes
Details
04-17-2016
4.00
Prepration of F-1276 Bottom Skin
Details
04-03-2016
2.00
Fuselage Corner Skins
Details
04-02-2016
4.00
Fuselage corner skins
Details
03-29-2016
2.00
F-1212-L&R Step Ribs
Details
03-26-2016
3.00
Seat Ramp Floors
Details
03-12-2016
6.00
F-1203A bulkhead
Details
03-06-2016
5.00
Bulkhead Doublers and F-1203A nutplates
Details
03-05-2016
2.50
Riveted F-1203C stub spar receptacles
Details
02-27-2016
5.00
Replace Bearing Bracket Brace & Preps
Details
02-07-2016
1.50
F-1203 bulkhead preparations
Details
02-06-2016
3.00
Added bulkhead caps & control column mounts
Details
01-31-2016
2.00
Forward Bulkhead Side Assemblies
Details
01-30-2016
1.50
F-1204C-R&L
Details
01-23-2016
4.00
Seat Floor Assemblies
Details
01-16-2016
2.00
Seat Floors
Details
12-31-2015
4.00
Seat floor and seat back hinges
Details
12-30-2015
4.00
Seat Rib Assemblies
Details
12-29-2015
4.00
Seat rib assemblies and servo doublers
Details
12-26-2015
2.50
Added nutplates to seat ribs
Details
12-12-2015
3.00
Seat ribs
Details
11-28-2015
3.00
Preparation of Seat Ribs
Details
11-27-2015
4.00
Flaperon MIxer
Details
10-24-2015
5.00
F1206A bulkhead and baggage ribs
Details
10-17-2015
4.00
F-1206A bulkhead and baggage ribs
Details
10-11-2015
2.00
Installed Baggage Floor Nutplates
Details
10-10-2015
3.00
Baggage Floor Rib Installation
Details
10-03-2015
2.00
Replacement of Baggage Floor Rivets
Details
09-20-2015
4.00
Prepared baggage ribs
Details
SITE NAVIGATION
Contact Builder
RV-12iS Home
Category
# Logs
# Hours
All
502
1448
10.0 Tailcone
32
89
11.0 Empenage Assemb
9
28
11.0 Empennage Attac
9
28
11iS Empenange Attac
5
8
12iS Emmpenage Fairi
1
2
13.0 Wing Spar Assem
5
16
14.0 Rear Spar, Stub
9
18
14.0 Wing
9
18
15.0 Wing Ribs
17
55
16.0 Stall Warning
4
7
17.0 Wing Skins
36
110
18.0 Flaperons
12
42
20.0 Fuselage Center
6
22
20is Center Section
32
89
21.0 Mid Fuse Ribs a
36
118
21IS Mid Fuse Ribs a
21
96
22.0 Fwd Lower Fusel
6
22
22iS/U FWD Lower Fus
5
21
23.0 Fuselage Side S
19
62
23iS/U Side Skins
13
44
24.0 Rollover Struct
9
28
24iS/U Rollover Stru
9
34
25iS/U Seatbacks
3
11
26.0 Seat Backs
2
6
26iS/U Fuel Tank
1
4
27 iS Fuel Syste
6
18
27.0 Rudder Pedals a
5
16
27iS/U iS Fuel Syste
6
18
28.0 Fuel System
7
22
28iS/U Rudder Pedals
3
13
29A.0 Fwd Upper Fuse
12
33
29iS/U FWD Upper Fus
13
46
32iS/U Flight Contro
3
7
35GiS/U Preminum Bra
1
3
35iS/U Landing Geat
1
1
40.0 Lighting
13
38
6.0 Vertical Stabili
17
38
7.0 Rudder
11
22
7A Trim Tab
1
2
8.0 Anti Servo Tabs
5
9
9.0 Horizontal Stabi
24
42
Empennage
4
9
Empennage
17
38
Empennage/Tailcone K
17
38
Fixtures
2
9
Fuselage
6
9
Hangar
4
Miscellaneous
7
22
SB 18-02-03 AST
1
2
SB180202
2
5
Shop Supplies
2
8
Wings
2
2
Copyright © 2001-2024 Matronics. All Rights Reserved.