KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
Work Logs Found: 36
Category Work Time: 118 Hours
 Date
Hours
Work Log Summary

Details

 05-15-2016
0.50
Tightened Block studs
Details

 05-06-2016
4.00
F-1213-R step floor & F-1202F nutplates
Details
       

 05-02-2016
2.00
F-1202F Nutplates and F-1213-L step floor
Details
     

 05-01-2016
5.00
F-1202F bulkhead and steps
Details
       

 04-30-2016
6.00
Baggage bulkhead and autopilot brackets
Details
       

 04-24-2016
5.00
Bottom Skin Installation and Reiveting
Details
       

 04-23-2016
1.00
Clecoed bottom skin to fuselage frame
Details
       

 04-21-2016
2.50
Add nutplates to bottom skin access holes
Details

 04-17-2016
4.00
Prepration of F-1276 Bottom Skin
Details
       

 04-03-2016
2.00
Fuselage Corner Skins
Details
       

 04-02-2016
4.00
Fuselage corner skins
Details
       

 03-29-2016
2.00
F-1212-L&R Step Ribs
Details
       

 03-26-2016
3.00
Seat Ramp Floors
Details
       

 03-12-2016
6.00
F-1203A bulkhead
Details
       

 03-06-2016
5.00
Bulkhead Doublers and F-1203A nutplates
Details
       

 03-05-2016
2.50
Riveted F-1203C stub spar receptacles
Details
       

 02-27-2016
5.00
Replace Bearing Bracket Brace & Preps
Details
       

 02-07-2016
1.50
F-1203 bulkhead preparations
Details
       

 02-06-2016
3.00
Added bulkhead caps & control column mounts
Details
       

 01-31-2016
2.00
Forward Bulkhead Side Assemblies
Details
       

 01-30-2016
1.50
F-1204C-R&L
Details
       

 01-23-2016
4.00
Seat Floor Assemblies
Details
       

 01-16-2016
2.00
Seat Floors
Details
       

 12-31-2015
4.00
Seat floor and seat back hinges
Details
       

 12-30-2015
4.00
Seat Rib Assemblies
Details
       

 12-29-2015
4.00
Seat rib assemblies and servo doublers
Details

 12-26-2015
2.50
Added nutplates to seat ribs
Details
       

 12-12-2015
3.00
Seat ribs
Details
       

 11-28-2015
3.00
Preparation of Seat Ribs
Details

 11-27-2015
4.00
Flaperon MIxer
Details
       

 10-24-2015
5.00
F1206A bulkhead and baggage ribs
Details
       

 10-17-2015
4.00
F-1206A bulkhead and baggage ribs
Details
       

 10-11-2015
2.00
Installed Baggage Floor Nutplates
Details
       

 10-10-2015
3.00
Baggage Floor Rib Installation
Details
       

 10-03-2015
2.00
Replacement of Baggage Floor Rivets
Details
       

 09-20-2015
4.00
Prepared baggage ribs
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.