Powered By Kitlog Pro v2.0
PHILIP'S WEB SITE
RV-6
Empennage
Work Logs Found:
21
Category Work Time:
39 Hours
Date
Hours
Work Log Summary
Details
12-28-2016
1.50
Sanding Tips!
Details
12-28-2016
0.50
Elevator Tips!
Details
12-27-2016
1.00
Fiberglass
Details
07-31-2016
2.50
Final Attachment of Stabilizers
Details
04-05-2016
1.25
The BIG Drill on the Vertical Stab!
04-05-2016
0.75
Prepped and Installed F681 Spice Plate!
Details
04-05-2016
2.00
Installed and tightened all Empennage Components a
Details
04-05-2016
0.75
Fabricated Drill Guide, Drilled Elevator Horns to
Details
04-05-2016
2.00
Elevator Horn Drilling!
Details
04-04-2016
2.30
Fitting and drilling the Vertical Stabilizer!
Details
04-03-2016
1.20
New Rod End Bearing Pins Used for the first time!
03-31-2016
1.50
Test fitting the Vertical Fin and the Elevators!
Details
03-31-2016
0.50
Some additional pics!
03-31-2016
0.50
Elevator Issue!
Details
03-31-2016
1.50
Elevator Control Alignment!
Details
03-31-2016
1.50
Adjustments for the Elevator Travel!
Details
03-30-2016
1.00
Horizontal Stab Drilling Rear Spar!
Details
03-30-2016
1.50
Horizontal Stab Drilling front support!
Details
02-14-2016
4.00
Rearranging the Shop and test fitting Empennage
09-15-2015
6.00
Finished Horizontal Stab
Details
09-13-2015
5.00
Lay out of Horizontal Stab
Details
SITE NAVIGATION
Contact Builder
RV-6 Home
Category
# Logs
# Hours
All
161
329
Avionics
2
5
Empennage
21
39
Engine
3
7
Fuselage
45
76
Miscellaneous
14
56
Shop Supplies
9
12
Tools
1
0
Wings
66
134
Copyright © 2001-2024 Matronics. All Rights Reserved.