Date
|
Hours
|
Work Log Summary
|
Details
|
02-07-2017
|
2.00
|
Secured the fuselage skins to the wings.
|
|
|
|
11-17-2016
|
1.00
|
Appled the wing walknon skids.
|
|
|
|
11-16-2016
|
3.00
|
Completed all wing to fuselage line torques. Cott
|
Details
|
|
|
11-15-2016
|
4.00
|
With Alex's help installed the fuel tank tear out
|
Details
|
|
|
11-04-2016
|
3.00
|
Installed the wings. Tpared bolts to set the hole
|
Details
|
|
|
11-04-2016
|
2.00
|
Completed nut installation and all nuts are torque
|
Details
|
|
|
10-26-2016
|
1.00
|
Buffed out the left wing leading edge. Looks even
|
|
|
|
09-17-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-16-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-15-2016
|
1.00
|
Sanded and filled the wing tip ribs.
|
|
|
|
09-13-2016
|
1.00
|
Super filled the wing tip end ribs. Repaimted the
|
|
|
|
09-12-2016
|
5.00
|
Installed Archer antenna in Lt wing tip.Began wiri
|
Details
|
|
|
09-06-2016
|
4.00
|
Installed the vent line to the fitting. Reworked
|
Details
|
|
|
08-31-2016
|
3.00
|
Did some filling on the wings nd fuselage. Instal
|
Details
|
|
|
08-30-2016
|
2.00
|
Completed the L & R wing fairing nutplate installa
|
|
|
|
08-29-2016
|
4.00
|
Continued installing nuts, now on the Lt wing.
|
|
|
|
08-28-2016
|
4.00
|
Began installing the wing fuselge fairing nutplate
|
|
|
|
07-19-2016
|
3.00
|
Fabricated the fuel vent lines and temporarily ins
|
Details
|
|
|
07-19-2016
|
2.00
|
Completed wing root fairings. 3/16 clearance all
|
|
|
|
07-18-2016
|
2.00
|
Wing root fairings driled (#30) is complete.
|
|
|
|
07-17-2016
|
2.00
|
Drilled the rear spar holes after checking another
|
Details
|
|
|
07-16-2016
|
3.00
|
Set the wing incidence, sweep, and measured twenty
|
Details
|
|
|
07-15-2016
|
2.00
|
Installed both wings with temporary bolts.
|
Details
|
|
|
07-14-2016
|
1.00
|
Prepped wings for installation. Laid out lower nu
|
|
|
|
07-02-2016
|
2.00
|
Completed the aft top wing root nutplates.
|
|
|
|
07-01-2016
|
2.00
|
Began installing wing root nutplates on upper surf
|
|
|
|
10-20-2014
|
2.00
|
Dimpled wing tip skin Open all holes to 1/8 and c
|
|
|
|
10-18-2014
|
3.00
|
Installed aft rib in both tips.
|
|
|
|
04-28-2014
|
2.00
|
Completed wingtip initial fit.
|
|
|
|
04-26-2014
|
2.00
|
Continued R wingtip fitting.
|
|
|
|
04-25-2014
|
1.00
|
Continued wintip initial fitting L.
|
|
|
|
04-24-2014
|
1.00
|
Began initial wingtip installation.
|
|
|