Work Logs Found: 21
Category Work Time: 43 Hours
 Date
Hours
Work Log Summary

Details

 03-04-2017
2.00
Performed the fuel flow tests.
Details
       

 03-03-2017
3.00
Boost pump installation nearly complete.
Details
       

 03-02-2017
2.00
More fuel pump installation work, mostly fitting a
       

 03-01-2017
3.00
Painted the bracket and installed the new boost pu
Details

 02-28-2017
3.00
Painted and installed the fuel boost pump bracket.
Details

 02-27-2017
1.00
Began fabrication of the new fuel boost pump brack

 02-24-2017
1.00
Fabricated a new fuel line.
Details

 01-05-2013
1.00
Fabricated brackets for control cables to cabin he

 01-27-2011
3.00
Continued wiring the pitot heat system
Details

 07-02-2010
3.00
Continued brake line installation & fabricated upp

 07-01-2010
1.00
Began installing nylaflow brake lines

 06-30-2010
1.00
Torqued Rudder and brake pedal bearings

 06-08-2010
2.00
Provided cabling access in empenage

 06-01-2010
2.00
Fitted autopilot wiring in wing and fuselage

 12-23-2009
2.00
Began work on the aileron trim system
Details

 12-22-2009
2.00
Began assembly of fuel boost pump systems
       

 12-19-2009
2.00
Fabricated and installed right brake line

 12-18-2009
2.00
Fabricated left brake line and installed it

 12-17-2009
1.00
Install the brake manifold bracket on the firewall

 12-16-2009
3.00
Drill, bend and install the right fuel vent line
       

 12-15-2009
3.00
Drill, Bend and install left fuel vent line
       