Rick's RV-7A Web Site
RV-7A
Systems
Work Logs Found:
21
Category Work Time:
43 Hours
Date
Hours
Work Log Summary
Details
03-04-2017
2.00
Performed the fuel flow tests.
Details
03-03-2017
3.00
Boost pump installation nearly complete.
Details
03-02-2017
2.00
More fuel pump installation work, mostly fitting a
03-01-2017
3.00
Painted the bracket and installed the new boost pu
Details
02-28-2017
3.00
Painted and installed the fuel boost pump bracket.
Details
02-27-2017
1.00
Began fabrication of the new fuel boost pump brack
02-24-2017
1.00
Fabricated a new fuel line.
Details
01-05-2013
1.00
Fabricated brackets for control cables to cabin he
01-27-2011
3.00
Continued wiring the pitot heat system
Details
07-02-2010
3.00
Continued brake line installation & fabricated upp
07-01-2010
1.00
Began installing nylaflow brake lines
06-30-2010
1.00
Torqued Rudder and brake pedal bearings
06-08-2010
2.00
Provided cabling access in empenage
06-01-2010
2.00
Fitted autopilot wiring in wing and fuselage
12-23-2009
2.00
Began work on the aileron trim system
Details
12-22-2009
2.00
Began assembly of fuel boost pump systems
12-19-2009
2.00
Fabricated and installed right brake line
12-18-2009
2.00
Fabricated left brake line and installed it
12-17-2009
1.00
Install the brake manifold bracket on the firewall
12-16-2009
3.00
Drill, bend and install the right fuel vent line
12-15-2009
3.00
Drill, Bend and install left fuel vent line
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1103
3159
Avionics
35
86
Baffles
50
129
Canopy
70
234
Electrical
139
475
Empennage
132
338
Engine
65
161
Flight Controls
30
86
Fuselage
280
708
Instrument Panel
42
106
Interior
11
23
Landing gear
77
234
Lighting
12
24
Miscellaneous
9
17
Paint
19
159
Prop
4
5
Smoke System
9
24
Systems
21
43
Windshield
27
134
Wings
32
72
Wings
39
101
Copyright © 2001-2024 Matronics. All Rights Reserved.