KitLog pro

Powered By Kitlog Pro v2.0

Rick's RV-7A Web Site
Work Logs Found: 42
Category Work Time: 106 Hours
 Date
Hours
Work Log Summary

Details

 02-02-2015
1.00
Reemoveed old Dynon pitot tube pper serviice bulle

 07-09-2014
1.00
Applied carbon to the underside of the instrument

 03-02-2013
2.00
Cut and installed cabin heat control.
       

 02-16-2013
2.00
Fabricate headset jack bracket

 10-10-2012
4.00
Continued throttle quadrent attach scheme developm

 10-09-2012
2.00
Fabricated attach scheme for throttle quadrent to

 10-05-2012
2.00
Trimmed and fit the ELT remote panel and epoxied i

 10-04-2012
2.00
Trimmed annunciator panel to fit into instrument p
Details

 10-03-2012
4.00
Prepared annunciator panel lettering.

 09-22-2012
1.00
Riveted instrument panel support brackets.

 07-11-2012
2.00
Drilled center rib thru firewall, fabed rear brack

 07-10-2012
1.00
Fabricated more throttle quafrent brackets.

 07-09-2012
3.00
Began wiring the smaller backbone wires.

 07-08-2012
1.00
Fabricated last battery cable.

 07-07-2012
2.00
Fabricated more cables for the backbone of the sys

 07-02-2012
2.00
Made more cables and wored on instrument panel.

 06-30-2012
3.00
Continued wiring and making cables.

 06-23-2012
2.00
Fit checked various components and finalized the t

 06-22-2012
4.00
Completed forward structure supports.

 06-21-2012
4.00
began fabricating angles, supports, etc, for the t

 06-20-2012
3.00
Worked on forward structure, drilling holes, etc.

 06-19-2012
1.00
Completed riveting the radio stack supports to the

 06-18-2012
6.00
Continued fabricating and attaching support angles

 06-16-2012
7.00
Conitnued fabrication of supports for the radio st

 06-15-2012
3.00
Continued radio support fabrication.

 06-06-2012
2.00
Fabricated radio stack support angles.

 06-05-2012
3.00
Rivieted support angles and wire bundle openings.

 06-02-2012
2.00
Continued fab of the radio brackets.

 06-02-2012
2.00
Continued fab of the radio brackets an support str

 05-30-2012
5.00
Completed fabricating the new radio mount brackets
Details

 05-29-2012
3.00
Conitnued fitting the radio brackets. irst design

 05-28-2012
3.00
Ompleted FWD angles for radio stack.
Details

 05-27-2012
2.00
Began filing AFS cutouts for proper fit.

 05-26-2012
2.00
Refabricated radio stack angles, fit checked radio

 05-25-2012
2.00
Continued radio stack angle fabrication.

 05-24-2012
2.00
Fit check instrument panel, Drilled AFS mounting h
Details

 05-23-2012
3.00
ontinued centr panel radio stack cutting. Receive

 05-14-2012
2.00
Continued center panel cuts for radio stack.

 05-12-2012
2.00
Continued cutting forward ribs and center panel fo

 05-02-2012
2.00
Continued w/panel cutouts #3, cut holes in 2nd pan

 04-30-2012
2.00
Began fitting forward fuselage with panel cutouts

 05-19-2011
2.00
Worked with John Wilson on panel fit prior to init










Copyright © 2001-2024 Matronics. All Rights Reserved.