Date
|
Hours
|
Work Log Summary
|
Details
|
02-02-2015
|
1.00
|
Reemoveed old Dynon pitot tube pper serviice bulle
|
|
|
|
07-09-2014
|
1.00
|
Applied carbon to the underside of the instrument
|
|
|
|
03-02-2013
|
2.00
|
Cut and installed cabin heat control.
|
|
|
|
02-16-2013
|
2.00
|
Fabricate headset jack bracket
|
|
|
|
10-10-2012
|
4.00
|
Continued throttle quadrent attach scheme developm
|
|
|
|
10-09-2012
|
2.00
|
Fabricated attach scheme for throttle quadrent to
|
|
|
|
10-05-2012
|
2.00
|
Trimmed and fit the ELT remote panel and epoxied i
|
|
|
|
10-04-2012
|
2.00
|
Trimmed annunciator panel to fit into instrument p
|
Details
|
|
|
10-03-2012
|
4.00
|
Prepared annunciator panel lettering.
|
|
|
|
09-22-2012
|
1.00
|
Riveted instrument panel support brackets.
|
|
|
|
07-11-2012
|
2.00
|
Drilled center rib thru firewall, fabed rear brack
|
|
|
|
07-10-2012
|
1.00
|
Fabricated more throttle quafrent brackets.
|
|
|
|
07-09-2012
|
3.00
|
Began wiring the smaller backbone wires.
|
|
|
|
07-08-2012
|
1.00
|
Fabricated last battery cable.
|
|
|
|
07-07-2012
|
2.00
|
Fabricated more cables for the backbone of the sys
|
|
|
|
07-02-2012
|
2.00
|
Made more cables and wored on instrument panel.
|
|
|
|
06-30-2012
|
3.00
|
Continued wiring and making cables.
|
|
|
|
06-23-2012
|
2.00
|
Fit checked various components and finalized the t
|
|
|
|
06-22-2012
|
4.00
|
Completed forward structure supports.
|
|
|
|
06-21-2012
|
4.00
|
began fabricating angles, supports, etc, for the t
|
|
|
|
06-20-2012
|
3.00
|
Worked on forward structure, drilling holes, etc.
|
|
|
|
06-19-2012
|
1.00
|
Completed riveting the radio stack supports to the
|
|
|
|
06-18-2012
|
6.00
|
Continued fabricating and attaching support angles
|
|
|
|
06-16-2012
|
7.00
|
Conitnued fabrication of supports for the radio st
|
|
|
|
06-15-2012
|
3.00
|
Continued radio support fabrication.
|
|
|
|
06-06-2012
|
2.00
|
Fabricated radio stack support angles.
|
|
|
|
06-05-2012
|
3.00
|
Rivieted support angles and wire bundle openings.
|
|
|
|
06-02-2012
|
2.00
|
Continued fab of the radio brackets.
|
|
|
|
06-02-2012
|
2.00
|
Continued fab of the radio brackets an support str
|
|
|
|
05-30-2012
|
5.00
|
Completed fabricating the new radio mount brackets
|
Details
|
|
|
05-29-2012
|
3.00
|
Conitnued fitting the radio brackets. irst design
|
|
|
|
05-28-2012
|
3.00
|
Ompleted FWD angles for radio stack.
|
Details
|
|
|
05-27-2012
|
2.00
|
Began filing AFS cutouts for proper fit.
|
|
|
|
05-26-2012
|
2.00
|
Refabricated radio stack angles, fit checked radio
|
|
|
|
05-25-2012
|
2.00
|
Continued radio stack angle fabrication.
|
|
|
|
05-24-2012
|
2.00
|
Fit check instrument panel, Drilled AFS mounting h
|
Details
|
|
|
05-23-2012
|
3.00
|
ontinued centr panel radio stack cutting. Receive
|
|
|
|
05-14-2012
|
2.00
|
Continued center panel cuts for radio stack.
|
|
|
|
05-12-2012
|
2.00
|
Continued cutting forward ribs and center panel fo
|
|
|
|
05-02-2012
|
2.00
|
Continued w/panel cutouts #3, cut holes in 2nd pan
|
|
|
|
04-30-2012
|
2.00
|
Began fitting forward fuselage with panel cutouts
|
|
|
|
05-19-2011
|
2.00
|
Worked with John Wilson on panel fit prior to init
|
|
|