Date
|
Hours
|
Work Log Summary
|
Details
|
03-04-2017
|
2.00
|
We began troubleshooting the start issue.
|
Details
|
|
|
03-04-2017
|
1.00
|
Engine start was unsuccessful and the battery quic
|
Details
|
|
|
02-20-2017
|
1.00
|
Where needed resealed the engine compartment with
|
|
|
|
02-20-2017
|
2.00
|
Removed the lower plugs to purge the fuel lines.
|
Details
|
|
|
02-08-2017
|
1.00
|
After the mineral oi was added to the engine -
|
Details
|
|
|
02-07-2017
|
1.00
|
Removed the lower plugs and drained the preservati
|
Details
|
|
|
07-09-2016
|
3.00
|
Firewall forward - relocated clamps, tie wrapped w
|
Details
|
|
|
03-29-2016
|
2.00
|
Rerouted start cable and secured it. Replaced the
|
|
|
|
03-28-2016
|
4.00
|
Removed /replaced and cleaned the lower left Skybo
|
Details
|
|
|
03-26-2016
|
2.00
|
Continued routing and securing lines, wires, etc.
|
|
|
|
03-24-2016
|
2.00
|
Conitiined routing and securing lines, wires, etc.
|
|
|
|
03-23-2016
|
2.00
|
Secured the oil plenum to the bracket. Fitted the
|
Details
|
|
|
03-22-2016
|
2.00
|
Continued supporting plug wires, Torqued the outsi
|
Details
|
|
|
03-21-2016
|
3.00
|
Attached plenum to the temp control valve, Cut to
|
Details
|
|
|
03-19-2016
|
1.00
|
Attached adel clamps to support the oil lines.
|
|
|
|
03-18-2016
|
2.00
|
Bought new custom made oil line and installed both
|
|
|
|
03-17-2016
|
2.00
|
Attempted to attach oi lines to the cooler. They
|
Details
|
|
|
03-16-2016
|
4.00
|
Completed fabrication of the plenum. Attached the
|
Details
|
|
|
03-15-2016
|
1.00
|
Conitnued riveting.
|
|
|
|
03-14-2016
|
4.00
|
Completed painting of the plenum parts and began r
|
|
|
|
03-12-2016
|
5.00
|
Completed fabrication of the plenum parts.
|
Details
|
|
|
03-11-2016
|
3.00
|
Continued working on the plenum.
|
|
|
|
03-10-2016
|
2.00
|
Continued working on the plenum.
|
|
|
|
03-09-2016
|
1.00
|
Continued working on the plenum.
|
|
|
|
03-08-2016
|
4.00
|
Made first version of the plenum and then scrapped
|
Details
|
|
|
03-07-2016
|
1.00
|
Made template for bending oil cooler plenum.
|
|
|
|
03-05-2016
|
4.00
|
Continued oil cooler bracket work.
|
|
|
|
03-04-2016
|
4.00
|
Redid oil cooler support brackets
|
|
|
|
02-22-2016
|
4.00
|
Attached the snorkel after a few adjustments of co
|
Details
|
|
|
02-15-2016
|
3.00
|
Finished painting the snorkel. Rt cowl lip baffle
|
|
|
|
02-13-2016
|
1.00
|
Applied 4 coats of gloss white on the snorkel bott
|
|
|
|
02-12-2016
|
1.00
|
Final sand on the snorkel.
|
|
|
|
02-11-2016
|
2.00
|
Installed th new heat muff on cylinder one exhaust
|
|
|
|
01-30-2016
|
4.00
|
Applied 3 coats of UV Smooth prime to the snorkel,
|
Details
|
|
|
01-29-2016
|
1.00
|
Sanded the snorkel, but it looks bad. Too many ru
|
|
|
|
01-28-2016
|
1.00
|
Applied another epoxy coat to the snorkel.
|
|
|
|
01-01-2016
|
1.00
|
Redrilled the semi circle attach holes to #27. Mu
|
Details
|
|
|
12-31-2015
|
1.00
|
Began installing heat muff. After tightening, it'
|
|
|
|
08-07-2014
|
1.00
|
Temporary prop installtion Plug removed
|
|
|
|
06-09-2014
|
2.00
|
Continued work on quadrent cables
|
Details
|
|
|
06-08-2014
|
2.00
|
Addjjusted prop cable.
|
|
|
|
06-07-2014
|
5.00
|
Beggan throttle quadrent installation.
|
Details
|
|
|
05-20-2014
|
2.00
|
Installed Sslick Start
|
|
|
|
04-10-2014
|
1.00
|
Began laying out engine baffle parts.
|
|
|
|
06-16-2013
|
2.00
|
Completed CHT/EGT installation
|
|
|
|
06-15-2013
|
6.00
|
Continued CHT/EGT installation
|
|
|
|
06-13-2013
|
2.00
|
Added clamps for routing CHT/EGT and began install
|
|
|
|
06-12-2013
|
3.00
|
Labelled panel switches, Redid #1 CHT/EGT cable cl
|
Details
|
|
|
03-30-2013
|
2.00
|
Installed the EGT probes
|
|
|
|
03-06-2013
|
2.00
|
Wired the emgine manifold pressure unit.
|
|
|
|
07-21-2011
|
4.00
|
Engine controls installion
|
Details
|
|
|
07-02-2011
|
3.00
|
Began relocation of the battery box
|
Details
|
|
|
07-01-2011
|
5.00
|
Oil cooler installation continues
|
Details
|
|
|
06-30-2011
|
4.00
|
Continued work on the oil cooler bracket supports.
|
|
|
|
06-29-2011
|
4.00
|
Modified prop governor control bracket and install
|
Details
|
|
|
06-18-2011
|
2.00
|
Began development and fabrication of the oil coole
|
Details
|
|
|
06-17-2011
|
2.00
|
Began alternator installation.
|
|
|
|
06-16-2011
|
4.00
|
Completed the installation of the air/oil separato
|
|
|
|
06-15-2011
|
3.00
|
Unisntalled the breather and installed the air/oil
|
|
|
|
06-14-2011
|
1.00
|
Began installing the breather line.
|
|
|
|
06-13-2011
|
4.00
|
Installed fuel lines, the throttle body, and sniff
|
Details
|
|
|
06-08-2011
|
5.00
|
Installed exhaust system
|
|
|
|
06-07-2011
|
1.00
|
Installed heat muff
|
|
|
|
05-21-2011
|
1.00
|
Cottered pinned engine mount attach bolts.
|
|
|
|
05-20-2011
|
3.00
|
Installed oil pressure sense line and then install
|
|
|