Rick's RV-7A Web Site
RV-7A
Electrical
Work Logs Found:
139
Category Work Time:
475 Hours
Date
Hours
Work Log Summary
Details
02-23-2017
1.00
Rewired the fuel boost pump to firewall fwd.
02-19-2017
2.00
Secured the fuel sensor wiring in the fwd fuselage
Details
02-18-2017
3.00
Found the VPX doesn't accept the fuel sensor wire.
Details
01-25-2017
1.00
Configured flaps, pitch and roll on the VPX Pro.
12-09-2016
1.00
Secured wire bundles in aft fuselage. Began fitti
02-19-2016
2.00
The Odyssey battery deveoped a case leak that drip
Details
08-14-2014
3.00
Completed electrical portion of instrument panel l
08-13-2014
2.00
Began installing instrument panel lights
05-26-2014
3.00
Continued securing firewall forward wire bundles.
Details
05-24-2014
3.00
Began final securing of engine compartment and avi
05-21-2014
2.00
Wired Slick Start
05-19-2014
1.00
Wired new Hall Effect and checkout was good
05-16-2014
1.00
Original Hall Effect transducer failed.
Details
04-21-2014
3.00
Trouble shooting of Hall effect transducer in engi
04-19-2014
3.00
Installed Hall Effect transducer in engine compar
04-18-2014
2.00
Installed Hall Effect transducer in engine compar
03-24-2014
2.00
Minor electrical work.
01-28-2014
75.00
Details lost from 1/28 thru 3/23
Details
01-27-2014
2.00
Interior lights on pilot side weren't working.
Details
01-13-2014
1.00
I had to rewire serial port 3 on the EFIS.
Details
01-06-2014
3.00
Continued VP-X setup.
01-05-2014
3.00
Continued VP-Xwork and started up the electrical s
01-04-2014
3.00
Continued VP-X work, installed battery, verified p
01-02-2014
2.00
Bench checked and updated VP-X. Also ran configura
12-28-2013
6.00
Finished most of the wiring -Hooray!
12-09-2013
4.00
Installed 7 pin connectors for fuselage/wing compo
12-07-2013
2.00
Removed all fuselage and wing connectors for strob
Details
12-06-2013
1.00
Misc Wiring
12-05-2013
1.00
Misc Wiring
12-03-2013
1.00
Misc Wiring
11-19-2013
2.00
Redid work from 11/18
Details
11-18-2013
1.00
Installed elecrial connectors on wings for strobe
11-12-2013
1.00
Ran additional shielded wiring in fuselage
11-05-2013
2.00
Organized wire bundles and spliced lighting rheost
Details
11-04-2013
4.00
Ran shielded wire thru fuselage for landing lights
11-02-2013
1.00
Bundled wires
11-01-2013
2.00
Wired began wiring GTR-200
10-24-2013
1.00
Continued wiring
10-16-2013
5.00
Continued wiring and bundling
10-15-2013
4.00
Continued wiring and bundling
10-14-2013
4.00
Continued Wire Bundling
10-13-2013
3.00
Continued Wire Bundling
10-12-2013
4.00
Comleted wiring power leads
10-11-2013
4.00
Conitued wiring power leads
10-10-2013
4.00
Conitued wiring power leads
10-09-2013
2.00
Conitued wiring power leads
10-08-2013
4.00
Conitued wiring power leads
10-07-2013
4.00
Conitued wiring power leads
10-05-2013
2.00
Conitued wiring power leads
10-04-2013
2.00
Conitued wiring power leads
10-03-2013
4.00
Conitued wiring power leads
10-02-2013
4.00
Conitued wiring
10-01-2013
2.00
Conitued wiring power leads
09-25-2013
2.00
Conitued wiring power leads
09-24-2013
2.00
Conitued wiring
09-23-2013
4.00
Conitued wiring power leads
09-22-2013
4.00
Conitued wiring power leads
09-21-2013
4.00
Conitued wiring power leads
09-20-2013
1.00
Wired power leads for the GTX-330
09-16-2013
1.00
Wired the flap motor
09-04-2013
3.00
Continued wiring power and pitch trim LEDs
09-03-2013
6.00
Continued wiring bundled left stick
09-02-2013
4.00
Continued wiring control stick grips and secured i
09-01-2013
2.00
Continued Stick Grip wiring
08-31-2013
7.00
Continued Stick Grip wiring
08-30-2013
4.00
Continued Stick Grip wiring
08-29-2013
2.00
Continued smoke system wiring.Version 3
08-29-2013
2.00
Began Stick Grip wiring
08-27-2013
1.00
Continued smoke system wiring.Version 3
08-26-2013
2.00
Continued smoke system wiring.Version 3
08-24-2013
3.00
Continued smoke system wiring.Version 3
08-23-2013
3.00
Continued smoke system wiring. version 2
08-22-2013
2.00
Continued smoke system wiring.
08-21-2013
3.00
Pitot system wiring.
08-19-2013
5.00
Continued fuel boost pump and smoke system wiring.
08-18-2013
2.00
Continued fuel boost pump system wiring.
08-17-2013
1.00
Continued smoke system wiring.
08-16-2013
3.00
Completed dimmer installation
08-15-2013
2.00
Began radio stack light dimmer installation.
Details
07-19-2013
1.00
Drilled right stick to control fitting and pinned
07-17-2013
3.00
More wiring and more talks with AFS and GCA
07-16-2013
3.00
More wiring
07-15-2013
3.00
More wiring
07-13-2013
4.00
Redo of the let control stick grip.
07-10-2013
3.00
More wiring
07-07-2013
2.00
More wiring
07-06-2013
2.00
More wiring
07-05-2013
6.00
More wiringof installtion of Interior LED's
07-03-2013
4.00
Completed installation Of Infinity stick grips.
07-02-2013
2.00
Continued the installation of Infinity stick contr
07-01-2013
3.00
Began the installation of Infinity stick control g
06-30-2013
3.00
More wiring and installed cargo lighting.
06-29-2013
3.00
More wiring
06-28-2013
4.00
More wiring
06-27-2013
2.00
Completed wiring Expansion Connector wiring Instal
06-20-2013
4.00
More eletrical wiring and continued installing she
06-19-2013
2.00
More eletrical wiring and began installing shelded
06-18-2013
4.00
More eletrical wiring
06-17-2013
3.00
More eletrical wiring
06-01-2013
3.00
Continued switch wiring and installed the male and
05-31-2013
3.00
Wired Flap position sensor Dsub-9 to VP. Began wi
05-29-2013
3.00
Determined the POS-12 Flap postion sensor wiring a
04-26-2013
33.00
More wiring 4/26 thru 5/17
04-25-2013
3.00
More wiring!!
04-24-2013
3.00
More wiring!!
04-23-2013
4.00
More wiring!!
04-22-2013
2.00
More wiring!!
04-20-2013
5.00
More wiring!!
04-19-2013
6.00
More wiring!!
04-18-2013
3.00
More wiring!!
04-09-2013
1.00
More Wiring
04-08-2013
1.00
More Wiring
04-05-2013
4.00
More Wiring
04-03-2013
1.00
More Wiring
03-29-2013
4.00
More Wiring
03-28-2013
2.00
More Wiring
03-26-2013
3.00
More wiring
03-25-2013
3.00
More wiring
03-23-2013
4.00
Laid in more wiring
03-22-2013
3.00
More wiring completed
03-21-2013
2.00
Continued to kay in wires
03-20-2013
5.00
Continued to kay in wires
03-19-2013
2.00
Continued to kay in wires
03-18-2013
2.00
Continued to kay in wires
03-16-2013
2.00
Continued wiring.
03-15-2013
2.00
Continued wiring, tarted on the VP power connector
03-14-2013
2.00
Continued to kay in wires
03-13-2013
2.00
Continued to kay in wires
03-13-2013
3.00
Continued aying in wiring. Prepped the VP-X plugs
Details
03-12-2013
2.00
Restrung many wires to make them more supported an
03-11-2013
1.00
Drilled holes in fuselage for running magnetometer
Details
03-08-2013
2.00
outed wiring thru appropriate openings.
05-17-2011
2.00
Restrung magnetometer wiring to exit further forwa
01-28-2011
2.00
Wird and secured the pitot heat wiring in the wing
01-15-2011
4.00
Completed strobe box electrical connections.
01-10-2011
1.00
Contnued installing strobe electrical connections.
12-09-2010
2.00
Began installing connectors on aft strobe
12-06-2010
1.00
Attempted to install servo set screw mod, but.. di
11-03-2010
1.00
replaced DB connector screws with knurelled hand o
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1103
3159
Avionics
35
86
Baffles
50
129
Canopy
70
234
Electrical
139
475
Empennage
132
338
Engine
65
161
Flight Controls
30
86
Fuselage
280
708
Instrument Panel
42
106
Interior
11
23
Landing gear
77
234
Lighting
12
24
Miscellaneous
9
17
Paint
19
159
Prop
4
5
Smoke System
9
24
Systems
21
43
Windshield
27
134
Wings
32
72
Wings
39
101