Rick's RV-7A Web Site
RV-7A
Landing gear
Work Logs Found:
77
Category Work Time:
234 Hours
Date
Hours
Work Log Summary
Details
11-03-2016
4.00
Completed nose wheel pant installation. Laid out
10-29-2016
5.00
Along with Russ we installed the nosewheel strut f
Details
02-13-2016
1.00
Sanded the lower fairing cuffs.
02-02-2016
2.00
More sanding more fiberglass parts - it never ends
02-01-2016
4.00
Sanded many UV primed parts
09-24-2015
2.00
Second coat of UV prime Sanded. Added nutplates
09-23-2015
3.00
UV primed the remaining wheel pants and nose gear
Details
09-22-2015
2.00
Sanded and UV Primed the intersection fairings and
09-15-2015
1.00
Sandable filler painted on intersection fairings.
09-14-2015
1.00
More sanding and filling of horiz stab lower fairi
09-12-2015
2.00
More sanding and filling of the parts.
09-11-2015
3.00
More sanding and filling of gear and horiz stab pa
09-10-2015
3.00
Installed nut plates on wheel pants for main gear
09-09-2015
2.00
More sanding and filling of gear and horiz stab pa
09-08-2015
2.00
Installed 'air fill' doors on both pants.
09-07-2015
1.00
More sanding and filling of gear parts.
09-06-2015
3.00
More sanding and filling of gear parts.
Details
09-05-2015
3.00
More sanding and filling. Filled the nose leg and
Details
09-04-2015
2.00
Sanded the fairings.
09-03-2015
3.00
Sanded and applied Suprfill to Int and nose fairin
09-02-2015
1.00
Cleaned the clay from the new Int fairings.
08-29-2015
2.00
Cleaned both fairings Tried to remove the clay.
Details
08-28-2015
4.00
Removed new Rt fairing. Laid up the Lt fairing.
08-27-2015
6.00
Continued clay molding on the mains.
Details
08-26-2015
4.00
Removed the new glassed fairing and sanded the edg
Details
08-25-2015
4.00
Continued shaping the clay. Cut the glass
Details
08-24-2015
3.00
Removed and sanded nose leg fairing,
Details
08-22-2015
3.00
Laid out grid on main pants. Redrilled
Details
08-21-2015
4.00
Reinstalled nose gear parts. Completed
Details
08-20-2015
2.00
Sanded, filled, etc, on nose gear.
08-19-2015
6.00
Redid the Lt main to 6 3/8 and nose to 6.
Details
08-18-2015
3.00
Redid Rt wheel fairing to provide 6 3/8 inches cle
Details
08-17-2015
1.00
Filled nose gear leg fairing w/superfill.
Details
08-15-2015
1.00
Rough sanded nose leg fairing. Laid out then dril
Details
08-08-2015
2.00
Enlarged the nose gear steering opening
Details
07-31-2015
5.00
Rough sanded the main gear leg fairings.
Details
07-30-2015
5.00
Instaled nutplates on nose gear fairing.
Details
07-29-2015
3.00
Painted wood stiffeners with resin.
Details
07-28-2015
2.00
Installed the upgraded nose wheel asssembly.
Details
07-13-2015
6.00
Aligned all gear leg fairings.
Details
07-11-2015
3.00
Installed wheel pants. Set up for alignment.
Details
07-09-2015
2.00
Trimmed and reinstalled nose gear fairing.
Details
07-08-2015
2.00
Glassed the other half of nose gear leg fairing.
Details
07-07-2015
2.00
Cleaned front halves of pant interiors.
Details
07-06-2015
2.00
Cleaned up the mud shields.
Details
07-03-2015
4.00
Final fit on mud shields.
Details
07-02-2015
11.00
Fitted mud shields on mains.
07-01-2015
1.00
Added 2nd paint coat to nose wheel bracket.
Details
06-30-2015
2.00
Fit nose wheel fairing mud wall.
Details
06-29-2015
2.00
Glued Lt side hinge on nose fairing.
Details
06-28-2015
1.00
Began hinge installation on nose gear fairing.
Details
06-27-2015
2.00
Installed the Antisplat nose job 2 device.
06-26-2015
22.00
The leg fairing is ready for final trim.
06-25-2015
4.00
Ajusted the nose bracket (bent).
Details
06-24-2015
4.00
Redud the bracketss in heavier aluuminum.
Details
06-23-2015
3.00
Continueed to tweak the new brackets.
Details
06-22-2015
2.00
Created 2 new nse pant brackets Fiit is excellent
06-19-2015
2.00
Stilll no success on nosse pant and bracket.
Details
06-18-2015
3.00
Worked on nose pant and bracket.
Details
06-17-2015
2.00
Trimmed nose pant. Drilled attachh holes to brack
06-16-2015
5.00
Continued fiitting Lt pant. Began nose pant
Details
06-15-2015
4.00
Completed fitting Rt pant.
06-13-2015
2.00
Rt pant now aadjusted..Trimmed outside and aft whe
Details
06-12-2015
3.00
Con't adjusting Rttt wheel pant. Laid out pant ce
Details
06-11-2015
3.00
Conttinued Rt ffairing cutouts and fitting.
Details
06-10-2015
1.00
Began Rt main geear legg fairing cutouts.
06-09-2015
3.00
Completed flashing removal. Began fitting pant ha
Details
06-08-2015
1.00
Beggan sanding the sharp flashhing off the wheel p
06-03-2015
2.00
Completed riveting Lt main gear leg fairing.
06-02-2015
2.00
Lt main gear leg fairing hinge driled, deburred, a
06-01-2015
2.00
Completed fab of Rt main gear leg fairing.
03-05-2012
2.00
Filled brake system with 5606 and bled the system.
10-06-2010
2.00
Drilled and slotted nosewheel fairing bracket
11-21-2009
2.00
Began left main gear mount fuselage thru bolt inst
11-09-2009
4.00
Completed fitting of left and right main gear moun
11-05-2009
2.00
Left main gear moount fitting is nearly complete.
11-04-2009
2.00
Began installation of main gear fittings. Cut lef
SITE NAVIGATION
Contact Builder
RV-7A Home
Category
# Logs
# Hours
All
1103
3159
Avionics
35
86
Baffles
50
129
Canopy
70
234
Electrical
139
475
Empennage
132
338
Engine
65
161
Flight Controls
30
86
Fuselage
280
708
Instrument Panel
42
106
Interior
11
23
Landing gear
77
234
Lighting
12
24
Miscellaneous
9
17
Paint
19
159
Prop
4
5
Smoke System
9
24
Systems
21
43
Windshield
27
134
Wings
32
72
Wings
39
101