12-27-2016
|
5.00
|
Aft floor installation completed.
|
|
|
|
12-24-2016
|
1.00
|
Began installation of aileron control rod cuffs.
|
|
|
|
12-08-2016
|
1.00
|
Installed baggage compartment side pnels.
|
|
|
|
11-24-2016
|
2.00
|
Cabin heat installation completed.
|
|
|
|
11-01-2016
|
2.00
|
Tapped te wing tie down attach holes.
|
|
|
|
10-31-2016
|
2.00
|
Installed the rear inspection plates. Secured the
|
Details
|
|
|
10-26-2016
|
2.00
|
Sanded and reshot the clear on the baggae compartm
|
Details
|
|
|
10-25-2016
|
2.00
|
Sanded and clear coated the aft baggae compartment
|
Details
|
|
|
10-24-2016
|
1.00
|
Istalled underwing fwd access covers.
|
|
|
|
10-23-2016
|
1.00
|
Installed smoke tank bracket nut plates.
|
Details
|
|
|
09-07-2016
|
4.00
|
Left and center floors installed. Continued worki
|
|
|
|
09-05-2016
|
2.00
|
Installed the smoke tank hold down nutplates on th
|
|
|
|
07-08-2016
|
3.00
|
Did the same to the left track and sill.
|
|
|
|
07-06-2016
|
2.00
|
Covers were riveted in place.
|
|
|
|
07-05-2016
|
4.00
|
Fitted the right cover. However, fitting was a pr
|
Details
|
|
|
07-04-2016
|
1.00
|
Fitted the 704K center post covers and covred with
|
|
|
|
05-31-2016
|
2.00
|
Sanded and filled remaining parts and took them to
|
|
|
|
05-30-2016
|
4.00
|
Filled and sanded other fiberglass parts except th
|
|
|
|
05-28-2016
|
4.00
|
Filled and sanded lower cowl
|
|
|
|
05-26-2016
|
2.00
|
Finished filling and sanding upper cowl and tail f
|
|
|
|
05-24-2016
|
2.00
|
Filled and sanded upper cowl and tail fairings usi
|
|
|
|
05-23-2016
|
1.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-21-2016
|
3.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-19-2016
|
3.00
|
Filled and sanded upper cowl using razor blades
|
|
|
|
05-18-2016
|
3.00
|
Filled and sanded upper cowl
|
|
|
|
05-17-2016
|
4.00
|
Filled and sanded upper cowl
|
|
|
|
05-16-2016
|
4.00
|
Filled and sanded upper cowl
|
|
|
|
05-15-2016
|
3.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-13-2016
|
2.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-11-2016
|
4.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-10-2016
|
6.00
|
Filled and sanded fiberglass parts
|
|
|
|
05-04-2016
|
2.00
|
Began filling the canopy skirt and continued the s
|
|
|
|
04-04-2016
|
2.00
|
Sanded the interior of the cowl halves and applied
|
Details
|
|
|
04-02-2016
|
3.00
|
3 coats of UV prime on the outside of the U & L co
|
|
|
|
04-01-2016
|
2.00
|
Finished 3 coats of UV prime on the interior of th
|
|
|
|
03-31-2016
|
1.00
|
UV primed, one coat on the outside of the upper co
|
|
|
|
01-16-2016
|
2.00
|
Cut cowl lips Sanded the snorkel & one wheel pant.
|
|
|
|
09-25-2015
|
2.00
|
Superfilled Lower Cowl and gear parts.
|
Details
|
|
|
05-20-2015
|
3.00
|
Ddrilled and trimmed lower empenage
|
Details
|
|
|
05-19-2015
|
5.00
|
Continued cuttting the main gear fairings.
|
Details
|
|
|
05-18-2015
|
3.00
|
Worked on lower empenage fairings.
|
Details
|
|
|
05-15-2015
|
2.00
|
Began fitting lower empenage fairings.
|
Details
|
|
|
05-14-2015
|
3.00
|
Sanded te superfil. Installed all nutplates.
|
Details
|
|
|
05-13-2015
|
2.00
|
Removed the fairing and rough sanded
|
Details
|
|
|
05-12-2015
|
3.00
|
Applied fiberglasss aand resin and
|
Details
|
|
|
05-11-2015
|
2.00
|
Prepped empenage fairing for fiberglass and
|
Details
|
|
|
05-09-2015
|
2.00
|
Ttrimmed all e-fairing edges. Drilled and
|
Details
|
|
|
05-08-2015
|
2.00
|
More fairing work. Laid out grid lines for trimmin
|
Details
|
|
|
05-07-2015
|
3.00
|
Con't e-fairing fitting. More heat, drilled
|
Details
|
|
|
05-06-2015
|
2.00
|
Continueed e-fairing fit using thge heat gun.
|
Details
|
|
|
05-05-2015
|
4.00
|
Continued e-fairing fit Drilled, tapped,
|
Details
|
|
|
04-28-2015
|
3.00
|
Fit checked nose wheel fairing. Began
|
Details
|
|
|
04-24-2015
|
4.00
|
Finally, air vent riveted and installed peer drawi
|
|
|
|
04-23-2015
|
4.00
|
Air vent work, try number 3.
|
|
|
|
04-22-2015
|
4.00
|
Same as day before pluuus began work on LC air ven
|
Details
|
|
|
04-21-2015
|
3.00
|
More work on nostrils and ramps.
|
Details
|
|
|
04-14-2015
|
1.00
|
Epoxied the nostril nutplates. Filled
|
Details
|
|
|
04-13-2015
|
1.00
|
Epoxied thee ramps in place.
|
|
|
|
04-10-2015
|
2.00
|
Superfilled cowls - nearly all areas.
|
|
|
|
04-09-2015
|
2.00
|
Sanded areas that needed filling oon both cowls ha
|
|
|
|
04-08-2015
|
2.00
|
Drilled openings for LC Skybolt camlocks.
|
Details
|
|
|
04-07-2015
|
1.00
|
Oil door hinge side repair almost complete
|
Details
|
|
|
04-06-2015
|
1.00
|
More oil door hinge side repairs.
|
|
|
|
04-04-2015
|
1.00
|
More oil door hinge side repairs.
|
|
|
|
04-03-2015
|
1.00
|
More oil door hine side repairs.
|
|
|
|
04-01-2015
|
1.00
|
Made oil door hinge side repair work.
|
|
|
|
03-31-2015
|
3.00
|
Sanded filled areas on U&L cowls.
|
Details
|
|
|
03-30-2015
|
3.00
|
Filled UC cowl Rt side flange.
|
Details
|
|
|
03-29-2015
|
1.00
|
Filled innn the LC trailing edge and oul door.
|
Details
|
|
|
03-25-2015
|
3.00
|
Added 2 bids on LC inner nostril.
|
Details
|
|
|
03-24-2015
|
2.00
|
C/S LC rivet holes Fitted backup strips on bottom
|
Details
|
|
|
03-23-2015
|
1.00
|
Installed new lower cowl hinge and drilled rivet h
|
|
|
|
03-21-2015
|
3.00
|
Fabbed shims for oil door hinge. Drilled the oil
|
Details
|
|
|
03-20-2015
|
3.00
|
Sanded filled areas Fillled the nostril areas.
|
Details
|
|
|
03-19-2015
|
2.00
|
Glassed nostrilss annf filled/covered the rivets a
|
|
|
|
03-18-2015
|
1.00
|
ssandded recently filled areas.
|
|
|
|
03-17-2015
|
1.00
|
Superfilled holess,glassed depressions
|
Details
|
|
|
03-16-2015
|
2.00
|
Ttaped andd laid up glass for nostrils and sides..
|
|
|
|
03-12-2015
|
3.00
|
Cut oil door opening in upper cowl. Trimmed and le
|
|
|
|
03-11-2015
|
3.00
|
Added 2 more oooats of UV filler aand resandeed w/
|
|
|
|
03-10-2015
|
2.00
|
More sanding and rolled on first coat of UV annd f
|
|
|
|
03-09-2015
|
1.00
|
Saanded off the bulges on both sides of the lower
|
|
|
|
03-05-2015
|
1.00
|
Continued cleanup of fuselage protectiion.
|
|
|
|
03-03-2015
|
1.00
|
Minor w/s sanding. removed protective covering
|
|
|
|
03-03-2015
|
1.00
|
Installed and drilled 2 holes/L over Rt cowl hiung
|
|
|
|
03-02-2015
|
3.00
|
Retaped windshield and continued final sanding.
|
Details
|
|
|
02-11-2015
|
1.00
|
Cut empenage fairing.and located all
|
Details
|
|
|
02-05-2015
|
22.00
|
Covered aircraft in prep for fiberglass work.
|
|
|
|
01-23-2015
|
2.00
|
Completed canopy handle/lattch system.
|
|
|
|
01-21-2015
|
1.00
|
Cleaned canopy slider block hholes, cleaned and lu
|
|
|
|
01-20-2015
|
2.00
|
Drilled the cabin frame & rollers for the attach s
|
|
|
|
01-19-2015
|
2.00
|
Favricated to canopy handles and riveted them in p
|
|
|
|
01-10-2015
|
1.00
|
Modified the -6 ss c/s washers for -8 screws.
|
Details
|
|
|
12-06-2014
|
5.00
|
Trimmed, fit, finished aft edge.of w/s.
|
|
|
|
12-05-2014
|
4.00
|
Installed w/s screws. Plastic covering installed
|
Details
|
|
|
12-04-2014
|
1.00
|
Final fit for w/s.
|
|
|
|
12-04-2014
|
3.00
|
Drilled w/s and rollbar to #30.
|
Details
|
|
|
12-03-2014
|
4.00
|
Cont fitting the w.s Maybe the final fit.
|
Details
|
|
|
12-02-2014
|
4.00
|
Continued fitting the windshield.
|
Details
|
|
|
12-01-2014
|
3.00
|
Began fitting the windshield.
|
Details
|
|
|
11-29-2014
|
2.00
|
Set the Skybolts on thee split line and trimmed
|
Details
|
|
|
11-27-2014
|
2.00
|
Set the Skybolt fasteners on tthhe split line.
|
Details
|
|
|
11-26-2014
|
3.00
|
Fabricated L & R rear flange split line gap filler
|
Details
|
|
|
11-22-2014
|
2.00
|
Countersunk and riveted all right side lower cowl
|
Details
|
|
|
11-21-2014
|
2.00
|
Completed the left sude access oanel. lKooks pre
|
|
|
|
11-20-2014
|
3.00
|
Continued filing and fitting the left sude hole an
|
Details
|
|
|
11-19-2014
|
2.00
|
Filled leffft hole, did a fit check, and continue
|
Details
|
|
|
11-18-2014
|
2.00
|
Forgot at first, but I was able to dimple the scre
|
Details
|
|
|
11-17-2014
|
2.00
|
Practiced coutersinking and dimpling on the thick
|
Details
|
|
|
11-16-2014
|
1.00
|
The left access hole cutout was made and the edges
|
|
|
|
11-15-2014
|
2.00
|
Drilled the access door flange, dimpled the flange
|
Details
|
|
|
11-08-2014
|
2.00
|
Right access door and hole trimming is complete.
|
|
|
|
11-07-2014
|
1.00
|
Continued filing and fitting the right access hole
|
|
|
|
11-06-2014
|
2.00
|
After hours of contemplation I cut the right acces
|
|
|
|
11-05-2014
|
1.00
|
Laid out cut lines for forward fuselage access por
|
|
|
|
11-04-2014
|
2.00
|
Drilled Skyybolt flanges on left side of LC.
|
|
|
|
10-25-2014
|
3.00
|
More cowl work. Prepared UC flanges for riveting
|
|
|
|
10-24-2014
|
2.00
|
Began drilling Skybolt split line installation on
|
|
|
|
10-22-2014
|
2.00
|
Adjusted the upper cowl by slightly enlarging the
|
|
|
|
10-21-2014
|
3.00
|
Continued adjusting cowl to get the proper fit.
|
Details
|
|
|
10-13-2014
|
3.00
|
Continued LC camlock installation
|
|
|
|
10-12-2014
|
1.00
|
Completed riveting the UC Skybolt camlocks.
|
Details
|
|
|
10-11-2014
|
4.00
|
Countersunk the cankock holes and rivited 1/2 of t
|
|
|
|
10-09-2014
|
3.00
|
Riveted firewall & Skybolt flanges.
|
|
|
|
10-07-2014
|
3.00
|
sanded fwd edges of U and L cowls.
|
Details
|
|
|
10-05-2014
|
3.00
|
More Skybokt cowl work.. UC Skybolt flanges read
|
|
|
|
09-17-2014
|
2.00
|
Continued adjusting the cowl.
|
|
|
|
09-16-2014
|
2.00
|
Added 4 plies of BID to forward edge of LC.
|
Details
|
|
|
09-15-2014
|
2.00
|
Continued adjusting cowl.
|
|
|
|
09-14-2014
|
2.00
|
Trimmed aft edges of LC
|
|
|
|
09-10-2014
|
3.00
|
Adjusted lower cowl and dropped cowl center cutout
|
|
|
|
09-09-2014
|
1.00
|
Continued lower cowl work.
|
|
|
|
09-06-2014
|
2.00
|
Made first cut on lower aft cowl
|
|
|
|
09-01-2014
|
5.00
|
Continued cowl fitting Began work on aft cowl la
|
|
|
|
08-31-2014
|
3.00
|
Match drilled flanges to firewall and made fit ad
|
|
|
|
08-30-2014
|
6.00
|
Leveled upper cowl split line.
|
Details
|
|
|
08-28-2014
|
3.00
|
Continued trimming and fitting the upper cowl.
|
|
|
|
08-27-2014
|
3.00
|
Began trimming and fitting upper cowl
|
|
|
|
08-26-2014
|
2.00
|
Completed riveting boot cowl with Cherry max rive
|
|
|
|
08-24-2014
|
1.00
|
Laud out nose wheel slot in lower cowl
|
|
|
|
08-23-2014
|
1.00
|
Continued rivetin boot cowl
|
|
|
|
08-20-2014
|
5.00
|
Continued riveting boot cowl
|
|
|
|
08-19-2014
|
3.00
|
Continued riveting boot cowl
|
|
|
|
08-18-2014
|
3.00
|
Continued riveting boot cowl.
|
|
|
|
08-16-2014
|
2.00
|
Riveted center rib of boot cowl.
|
|
|
|
08-15-2014
|
3.00
|
Began installing fwd boot cowl.
|
Details
|
|
|
08-09-2014
|
2.00
|
Installed braces under boot cowl
|
|
|
|
07-10-2014
|
1.00
|
Removed Lower Cowl hinges which will be replaced
|
|
|
|
05-27-2014
|
3.00
|
Completed vent installation and installed heater s
|
|
|
|
03-01-2013
|
4.00
|
Dimpled forward skin and aircraft structure. Inst
|
Details
|
|
|
02-28-2013
|
4.00
|
Match drilled the firewall holes. All holes are d
|
Details
|
|
|
02-26-2013
|
3.00
|
Temp install all Clecos on Fwd Skin
|
|
|
|
02-25-2013
|
2.00
|
Fit Check Fwd Skin. RIbs need encouragement to fit
|
Details
|
|
|
02-24-2013
|
2.00
|
Final bending of the upper forward skin.
|
|
|
|
02-23-2013
|
4.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-22-2013
|
2.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-20-2013
|
2.00
|
Continue fit checking upper forward fuselage skin
|
|
|
|
02-09-2013
|
1.00
|
Began fitting the upper forward fuselage skin - fo
|
|
|
|
02-08-2013
|
4.00
|
Began prepping for upper fuselage skin fit and dri
|
Details
|
|
|
02-07-2013
|
1.00
|
Glued and riveted left NACA vent
|
|
|
|
02-06-2013
|
1.00
|
Glued and riveted right NACA vent
|
|
|
|
01-23-2013
|
1.00
|
Modified headset brackets to include a stereo mono
|
|
|
|
01-22-2013
|
1.00
|
Painted headset mounting brackets.
|
|
|
|
01-21-2013
|
2.00
|
Fabricated 2 headset mounting brackets
|
|
|
|
01-20-2013
|
2.00
|
Contniued riveting the upper forward fuselage
|
|
|
|
01-19-2013
|
5.00
|
Began riveting upper forward fuselage structure
|
|
|
|
01-18-2013
|
2.00
|
Dimpled L & R NACA vent rivet holes
|
|
|
|
01-15-2013
|
2.00
|
The foward fuselage structure was clecoed in place
|
Details
|
|
|
01-14-2013
|
2.00
|
The forward rib attachment holes in the firewall
|
|
|
|
01-09-2013
|
3.00
|
Yet more mounting nut plates were added.
|
Details
|
|
|
01-08-2013
|
4.00
|
Continued adding nutplates to the forward fuselage
|
Details
|
|
|
01-04-2013
|
1.00
|
Left forward rib nut plates installed for antenna
|
|
|
|
01-03-2013
|
1.00
|
Right forward rib nut plates installed for MP asse
|
Details
|
|
|
12-28-2012
|
1.00
|
Rudder pedal assembly final torque.
|
Details
|
|
|
12-27-2012
|
3.00
|
Reinstalled rudder pedal assembly to most forward
|
Details
|
|
|
08-12-2012
|
2.00
|
Began work on throttle quadrent control cable lock
|
|
|
|
08-11-2012
|
1.00
|
Completed insulation installation.
|
|
|
|
08-10-2012
|
2.00
|
Continued insulation installation.
|
|
|
|
08-09-2012
|
3.00
|
Continued insulation installation.
|
|
|
|
08-08-2012
|
1.00
|
Began installing firewall insulation.
|
|
|
|
07-16-2011
|
5.00
|
Firewall work
|
Details
|
|
|
07-15-2011
|
2.00
|
Cabin heat pickup
|
Details
|
|
|
05-20-2011
|
3.00
|
Completed placing anchor points on the firwall and
|
|
|
|
03-24-2011
|
2.00
|
Clecoed forward floor to the underlying ribss.
|
Details
|
|
|
03-13-2011
|
4.00
|
Completed painting aft fuselage interior parts.
|
Details
|
|
|
03-12-2011
|
4.00
|
Aft, forward skin, F-6111, and other misc. parts.
|
Details
|
|
|
03-11-2011
|
2.00
|
Forward, aft fuselage skin work.
|
Details
|
|
|
03-10-2011
|
4.00
|
Aft, Forward Fuselage work continues.
|
Details
|
|
|
03-09-2011
|
2.00
|
Aft, forward upper fuselage structure.
|
Details
|
|
|
03-08-2011
|
1.00
|
Deburred forward aft fuselage structure.
|
|
|
|
03-07-2011
|
2.00
|
Completed left fuel tank attach bracket fabricatio
|
Details
|
|
|
03-06-2011
|
1.00
|
Continued right fuel tank attach bracket installat
|
|
|
|
03-05-2011
|
4.00
|
Continued fuel tank attach bracket installation an
|
|
|
|
03-04-2011
|
2.00
|
Continued fuel tank attach bracket fabrication.
|
|
|
|
03-02-2011
|
2.00
|
Began fabricating fuel tank attach brackets.
|
|
|
|
01-31-2011
|
1.00
|
Worked on the aft fuselage skin, reenforcement rib
|
Details
|
|
|
01-29-2011
|
1.00
|
Began fitting the aft fuselage top skin.
|
|
|
|
08-13-2010
|
3.00
|
Fabricated upper cowling pattern for skybolt faste
|
|
|
|
07-14-2010
|
3.00
|
Trial fit the upper fuselage and studied various o
|
|
|
|
07-13-2010
|
3.00
|
Continued upper fuselage work
|
|
|
|
07-12-2010
|
2.00
|
Coontinued upper fuselage work.
|
|
|
|
07-10-2010
|
3.00
|
Coiontinued upper fuselage work.
|
|
|
|
07-09-2010
|
4.00
|
Continued upper fuselage work.
|
|
|
|
07-08-2010
|
1.00
|
Continued bracket work.
|
|
|
|
07-07-2010
|
3.00
|
Continued bracket fabrication
|
|
|
|
07-06-2010
|
5.00
|
Continued fabricating and began drilling upper fus
|
Details
|
|
|
07-03-2010
|
4.00
|
Continued fabricating upper fuselage assembly brac
|
|
|
|
06-17-2010
|
1.00
|
Removed and replaced all brake line fittings with
|
|
|
|
05-24-2010
|
5.00
|
Installed engine mount & rudder pedal bracket
|
Details
|
|
|
05-22-2010
|
3.00
|
Completed the hinge installation
|
|
|
|
05-21-2010
|
5.00
|
Nearing completion of the piano hinge installation
|
Details
|
|
|
05-20-2010
|
2.00
|
Continued piano honge work including making the re
|
|
|
|
05-19-2010
|
3.00
|
Continued lower cowl piano hinge installation
|
|
|
|
05-14-2010
|
1.00
|
Epoxied the 2 NACA vents in the forward fuselage
|
|
|
|
05-13-2010
|
4.00
|
an fabrication of lower cowl piano hinges
|
|
|
|
05-12-2010
|
2.00
|
Completed nutplate installation on baggage compart
|
|
|
|
05-11-2010
|
3.00
|
Installed baggage compartment floor nutplates
|
|
|
|
03-21-2010
|
2.00
|
Continued fabricating center console cover
|
|
|
|
03-20-2010
|
4.00
|
Began Fabricating center console cover
|
|
|
|
03-19-2010
|
4.00
|
Primed seat back parts
|
|
|
|
03-18-2010
|
2.00
|
Match drilled seat back parts to fuselage
|
|
|
|
03-17-2010
|
2.00
|
Created center console cardboard mockup
|
|
|
|
03-16-2010
|
2.00
|
Continued fabricating parts
|
|
|
|
03-15-2010
|
4.00
|
Continued seat back work
|
|
|
|
03-14-2010
|
2.00
|
Continued fabricating seat back parts
|
|
|
|
03-13-2010
|
4.00
|
Added lightening holes to the seat back plates
|
|
|
|
03-12-2010
|
3.00
|
Began fabricating seat back parts
|
|
|
|
03-11-2010
|
2.00
|
Completed priming center console
|
|
|
|
03-10-2010
|
3.00
|
Continued center console painting
|
|
|
|
03-09-2010
|
2.00
|
Center console painting continues
|
|
|
|
03-05-2010
|
4.00
|
Began painting center console parts
|
|
|
|
03-04-2010
|
1.00
|
Completed, painted battery box - installed recess
|
|
|
|
03-03-2010
|
2.00
|
Continued work on battery box
|
|
|
|
03-02-2010
|
2.00
|
Continued work on battery box fabrication
|
|
|
|
03-01-2010
|
4.00
|
Completed the eyeball pass thrus and began work on
|
|
|
|
02-27-2010
|
3.00
|
Firewall - Cabin Heat Valve
|
|
|
|
02-26-2010
|
2.00
|
Fuel System Tubing Fabrication
|
|
|
|
02-26-2010
|
2.00
|
Firewall - 3 Eyeball fittings installed in the fir
|
|
|
|
02-25-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-24-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-23-2010
|
2.00
|
Firewall - Hole drilling
|
|
|
|
02-22-2010
|
2.00
|
Fuel System Fabrication
|
|
|
|
02-20-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-19-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-18-2010
|
4.00
|
Fuel System Fabrication
|
|
|
|
02-17-2010
|
2.00
|
Fuel System Fabrication
|
|
|
|
02-13-2010
|
2.00
|
Installed aft fuselage stiffener
|
|
|
|
02-09-2010
|
4.00
|
Fuel system fabrication
|
|
|
|
02-06-2010
|
2.00
|
Fuel System plumbing fabrication
|
|
|
|
01-23-2010
|
4.00
|
Trimmed bracket , pre installed and drilled the se
|
|
|
|
01-20-2010
|
1.00
|
Began electric aileron trim installation
|
|
|
|
01-19-2010
|
3.00
|
Both steps are riveted in place and RTV seals it f
|
|
|
|
01-18-2010
|
3.00
|
Left step fitted, drilled and primed
|
|
|
|
01-17-2010
|
3.00
|
Right Step completed and primed and began work on
|
|
|
|
01-17-2010
|
2.00
|
Left step openings completed and left step bending
|
|
|
|
01-16-2010
|
2.00
|
Right step iis bent to conform and now drilled for
|
Details
|
|
|
01-15-2010
|
2.00
|
Continued with step installation
|
Details
|
|
|
01-14-2010
|
2.00
|
Continued Step Installation
|
|
|
|
01-07-2010
|
3.00
|
Cut externsl and internal holes, trimmed ribs, fit
|
|
|
|
01-06-2010
|
1.00
|
Began work on right step, removed baggage compartm
|
|
|
|
11-21-2009
|
4.00
|
Completed fabrication of flap system components.
|
|
|
|
11-20-2009
|
2.00
|
Primed flap control housing.
|
|
|
|
11-17-2009
|
2.00
|
Prepped and primed flap system parts.
|
|
|
|
11-14-2009
|
4.00
|
Continued fabrication of the flap system parts.
|
|
|
|
11-13-2009
|
4.00
|
Began fabrication of flap motor components.
|
|
|
|
11-03-2009
|
2.00
|
Installed control mount fittings and bolted the pi
|
|
|
|
11-02-2009
|
2.00
|
Completed fabrication of bushings and reaming of c
|
|
|
|
10-15-2009
|
5.00
|
Completed installation of crotch strap brackets.
|
|
|
|
10-10-2009
|
1.00
|
Riveted control rod ends onti pitch ontrol rods
|
|
|
|
10-10-2009
|
1.00
|
Began deburringedges of crotch seat belt retaining
|
|
|
|
10-09-2009
|
2.00
|
Prepped and primed interior of control rods.
|
|
|
|
10-08-2009
|
2.00
|
Prepared hole patternand drilled rivet holes for p
|
|
|
|
09-11-2009
|
3.00
|
Completed rudder pedal assembly.
|
Details
|
|
|
09-07-2009
|
1.00
|
Installed rudder cables
|
Details
|
|
|
09-06-2009
|
1.00
|
Inserted bushings & adehereed the static ports wit
|
Details
|
|
|
09-04-2009
|
2.00
|
Continued working the pedals
|
Details
|
|
|
09-03-2009
|
2.00
|
Began work on the rudder/brake pedals
|
Details
|
|
|
08-29-2009
|
3.00
|
Began buildup of rudder pedal assembly
|
Details
|
|
|
08-25-2009
|
4.00
|
Powder coated rudder pedals
|
Details
|
|
|
08-24-2009
|
2.00
|
Drilled center rudder pedal assembly bearing
|
Details
|
|