Work Logs Found: 35
Category Work Time: 86 Hours
 Date
Hours
Work Log Summary

Details

 02-16-2017
2.00
More EFIS calibrations Added 10 gals of fuel to t
Details
       

 02-08-2017
1.00
Programmed the AFS-4500 for various functions.
       

 01-27-2017
1.00
Began programming the AFS Displays
       

 09-14-2016
1.00
Safety wired the pitch servo. Sanded and filled t

 02-05-2015
2.00
Installed new Dynon pitot tube per service bulleti

 04-14-2014
2.00
Completed in of the GTN to AFS navaud tests.

 03-25-2014
2.00
Had to rewire thee GTR200. It's not talking to th

 01-27-2014
1.00
Comm 1 and 2 were checked and work - so far.
Details

 01-07-2014
3.00
Began AFS4500 setup, updated map cards. I had to

 12-31-2013
3.00
Completed initial installation of the avionics.

 12-30-2013
6.00
Began installing avionics. Some minr panel mods h

 10-31-2013
2.00
Continued installing ADS-B and constructed final b

 10-25-2013
3.00
Began installing ADS-B and removed XM

 07-18-2013
5.00
Added more pins to the SL-40 and EFIS Main Connect

 07-09-2013
4.00
More wiring and added pins to the GMA 240

 05-27-2013
2.00
Flap position sensor.
Details

 05-25-2013
3.00
Completed most of the magnatometer installation.
Details

 05-24-2013
4.00
constructed new bracketry for the mgnatometer inst
Details

 05-23-2013
2.00
Completely redid the magnatometer installation.

 05-22-2013
4.00
New attempt using aluminum angles to get correct a
Details

 05-21-2013
4.00
began 2nd attemp to install the magnatometers.
Details

 05-20-2013
4.00
Continued 1st attemp to install the magnatometers.
Details

 05-18-2013
3.00
Worked on magnatometer installation.
Details

 05-17-2013
3.00
Soldered magnatometer Dsub-9 conectors and began

 01-01-2013
2.00
Fabricated fuse bracket.
Details

 12-26-2012
2.00
Modifying VP-X mounting shelf.
Details

 10-11-2012
2.00
Began creating ARINC 429 Mounting brackets

 06-09-2011
2.00
Recieved panel from John Wilson last week.
Details

 01-20-2011
2.00
Fabricatewd GPS cable in fuselage and fitted a car

 01-19-2011
3.00
Installed ELT antenna above aft deck and fabricate

 01-17-2011
1.00
Ran electrical lines for the magnetometers in aft

 12-31-2010
1.00
Continued pitot installation by tapping holes. Ha

 12-30-2010
1.00
Began installing pitot tube by drilling mast attac

 09-17-2010
1.00
installed the pins in the pitch servo DB-9.

 07-04-2009
2.00
Roll Servo Installation
Details
     