Rick's RV-7A Web Site
Work Logs Found: 39
Category Work Time: 101 Hours
 Date
Hours
Work Log Summary

Details

 10-17-2014
4.00
Drilled LT wing tip to Left wing
Details

 10-16-2014
3.00
Drilled RT tip to wing.
Details

 10-14-2014
3.00
Began landing light installation on RT wing tip.
Details

 01-27-2011
1.00
Completed riveting of the lowerwing skins

 01-26-2011
5.00
Completed riveting right lower wing skin.
Details

 01-25-2011
3.00
Began riveting the lower right wing panel in place

 08-12-2010
3.00
Installed lower cowling hinge on fuselage side

 08-10-2010
3.00
Trimmed more wires and tubes and laid them in the

 07-15-2010
3.00
Began laying in wires, tubes, etc. Cut the wing w

 06-16-2010
2.00
Completed installation of L & R ailerons

 06-15-2010
4.00
Installed left flap and fabricated 2 hinge pins
Details

 06-14-2010
3.00
Installed right flap and fabricated 2 hinge pins.

 06-13-2010
2.00
Fabrictaed and installed the hinge lock devices fo

 06-12-2010
4.00
Completed installing AOA system in the left wing

 06-09-2010
2.00
Torqued fuel tank bolts and aileron bellcrank bolt

 05-31-2010
4.00
Fabricated and installed GPS antenna mounting brac
Details

 05-28-2010
2.00
Fitted tubing for Pitot and AOA

 05-25-2010
2.00
Fitted srobe light wires in L&R wings

 01-20-2010
1.00
Rear spar attach fittings are trimmed and shaped

 08-23-2009
4.00
Completed dimpling of lower skin assembly
Details
       

 08-22-2009
4.00
Drilling, deburing and dimpling
     

 08-21-2009
2.00
Drilled, deburred wing skins, ribs and primed spar
Details

 08-20-2009
1.00
Installed fuel sensors
Details
       

 08-19-2009
2.00
Drilled, deburred, and dimpled lower Rtt wing skin
Details
     

 08-09-2009
2.00
Prepared left wing for pitot tube/extension instal
Details
       

 07-01-2009
2.00
Riveting the stiffeners
Details
       

 06-29-2009
3.00
Continued the drilling, dimpling, and countersink
Details

 06-16-2009
2.00
Fitting the aileron and flap gap and stiffeners.
Details
       

 06-10-2009
2.00
Ailigning flaps and ailerons
Details
       

 05-16-2009
5.00
Aiuleron brackets are completely installed.
Details
       

 05-15-2009
2.00
Continued installing the aileron brackets.

 05-14-2009
2.00
Rivited the aileron brackets together.
Details
     

 05-13-2009
5.00
Completed the aileron bracket priming, bellcrank i
Details

 05-12-2009
2.00
Reprimed the aileron brackets and mounted the fuse
Details
       

 05-11-2009
2.00
Began conduit installation
Details
       

 05-09-2009
1.00
Finished the priming and prepping of the Aileron b
Details
     

 05-08-2009
2.00
Aileron Bracket work.
Details
       

 05-01-2009
1.00
Riveted the end caps on each aileron to controlsti
Details
     

 04-29-2009
1.00
Aileron Controls
Details
     