Rick's RV-7A Web Site
Work Logs Found: 132
Category Work Time: 338 Hours
 Date
Hours
Work Log Summary

Details

 07-03-2011
3.50
Completed the relocation of the battery box
Details

 01-05-2011
1.00
Reattached static line supports and pitch tube/ct

 12-17-2010
2.00
Installed rudder and rudder stop/cables

 12-16-2010
2.00
Began rudder installation

 12-14-2010
2.00
more sanding and filling and primimg and IT'S DONE

 12-10-2010
2.00
more sanding and filling and primimg

 12-08-2010
2.00
more sanding and filling and primimg

 12-07-2010
2.00
more sanding and filling

 12-06-2010
1.00
Fiberglassed the rudder bottom joint.

 12-05-2010
3.00
Final fit of rudder bottom, riveted it to the rudd

 12-03-2010
2.00
Fitted the rudder bottom and repaired cracks along

 12-02-2010
3.00
Thought I completed the rudder bottom fit.
Details

 12-01-2010
1.00
Trimmed nuts to fit the strobe case

 11-30-2010
2.00
Installed and epoxied nuts to hold aft strobe.

 11-29-2010
3.00
Cut and fitted rudder bottom.

 11-24-2010
2.00
Mounted the vertical stabilizer.

 11-23-2010
2.00
Redriilled the elevator horns.
Details

 11-22-2010
2.00
Removed the horizontal assembly
Details

 11-16-2010
3.00
Redid floor brackets and adjusted pushrods for ele

 11-15-2010
1.00
Drilled the elevator pushrod hole and it's off!!!

 11-13-2010
1.00
Completed mounting the horizontal stab & elevator.
Details

 11-12-2010
2.00
more sanding and filling of the tips - nearly done

 11-12-2010
1.00
Completed mounting the horizontal stab & elevator,
Details

 11-10-2010
2.00
more sanding and filling of the tips mainly pinhol

 11-08-2010
2.00
more sanding and filling of the tips

 11-03-2010
1.00
more sanding and filling of the tips

 11-01-2010
2.00
more sanding & flling of the Vertical & Rudder tip

 10-13-2010
2.00
more sanding and filling of the tips

 10-12-2010
2.00
more sanding and filling of the tips

 10-11-2010
2.00
more sanding and filling of the tips

 10-07-2010
1.00
more sanding and filling of the tips

 10-07-2010
1.00
more sanding and filling of the tips

 10-05-2010
1.00
more sanding and filling of the tips

 10-02-2010
2.00
more sanding and filling of the tips

 10-01-2010
2.00
more sanding & filling of the tips - rt elevator c

 09-30-2010
3.00
more sanding and filling of the tips

 09-29-2010
2.00
more sanding and filling of the tips

 09-26-2010
2.00
more sanding and filling and spraying with sandabl
Details

 09-25-2010
4.00
more sanding and filling

 09-24-2010
3.00
more sanding and filling and priming

 09-23-2010
3.00
more sanding and filling

 09-21-2010
3.00
more sanding and filling

 09-20-2010
3.00
more sanding and filling

 09-19-2010
2.00
more sanding and filling

 09-18-2010
2.00
more sanding and filling

 09-17-2010
2.00
more sanding and filling

 09-16-2010
3.00
yet more sanding and filling

 09-15-2010
2.00
more sanding and filling

 09-13-2010
1.00
continued to fiberglass horizontal & verticalstabs

 09-11-2010
2.00
sanded and filled vertical and horizontal

 09-10-2010
6.00
Empennage finishing
Details

 09-09-2010
2.00
more filling and sanding

 09-08-2010
4.00
more filling and sanding

 09-07-2010
2.00
More fililing and sanding

 09-06-2010
2.00
Sanded and refilled Vetical Stab and left Horiz St

 09-05-2010
3.00
Sanded the filled areas of the empennage and added

 09-04-2010
3.00
Installed ruder cable farings and superfilled the

 09-04-2010
2.00
Continued filling the open ends of the empennage c

 09-03-2010
5.00
Continued empenagge work - superfiling, sanding, e

 09-02-2010
2.00
Fabricated fiberglass overlays on top the foam ins

 09-01-2010
4.00
Began fabricating closeout foam pieces inside the

 08-31-2010
6.00
Continued tip installation

 08-30-2010
4.00
Continued installation of fiberglass tips for hori

 08-28-2010
4.00
Attached left horizontal stab and left elevator ti

 08-27-2010
4.00
Completed aft bulkhead riveting, rudder cable clam

 08-26-2010
2.00
Continued riveting the aft bulkhead.

 08-25-2010
6.00
Finished drilling, reaming, deburring, the vertica

 08-24-2010
4.00
Continued to adjust and secure the vertical stab.

 08-23-2010
4.00
Vert stab work. Test fit on aircraft.

 08-21-2010
4.00
Aligned, fitted, drilled, attach holes. Measured 0

 08-20-2010
2.00
Laid out the underlying structure on the top of th

 08-19-2010
3.00
Completed the installation of the aft tie down str

 08-17-2010
2.00
Began to fit the horizontal stab. Test fit & meas

 08-16-2010
3.00
Fabricated horizontal stabilizer shims. Began to

 08-09-2010
2.00
Fitted the rudder fairing and drilled the attach h

 05-25-2010
1.00
Fitted strobe light wire in empennage

 04-27-2009
3.00
Align Elevators
Details
     

 04-21-2009
3.50
Roll the leading edges of the elevators
Details
       

 04-16-2009
4.00
Nearing completion of left elevator
Details
       

 04-15-2009
5.00
Trim tab/elevator attachment
Details
       

 04-15-2009
0.00
Extra pictures of trim tab/elevator work
       

 04-14-2009
2.00
Trim tab buildup
Details
       

 04-13-2009
2.00
Began fitting of the left elevator trim tab
Details
       

 04-12-2009
2.00
Rivet the left elevator
Details
       

 04-11-2009
0.50
Begin to Rivet the left elevator
Details
     

 04-10-2009
1.50
Bending the elevator and trim tab ends
Details
       

 04-10-2009
0.50
Attaching 703/4 ribs to 702 spar
Details
     

 04-08-2009
1.50
Pitch trim actuator
Details
       

 04-05-2009
2.00
Redid the RT Elevator E-713 to skin junction
Details
     

 04-04-2009
3.00
Began the left elevator understructure preparation
Details
     

 04-03-2009
3.50
Almosr completed the RT elevator.
Details

 04-02-2009
5.00
Completed the prep and began riveting the RT eleva
Details

 04-01-2009
1.00
Drilling the RT elevator skin
Details

 03-31-2009
4.00
Built the RT elevator understructure.
Details

 03-30-2009
2.00
Bending of the elevator trailing edges and rivetin
Details
       

 03-21-2009
2.00
Reinstalled Rudder Bearings and completed right el
Details
       

 03-20-2009
2.00
The elevator skins were dimpled
Details
     

 03-20-2009
2.00
Rudder trailing edge prepped for riveting
Details
       

 03-19-2009
1.00
Continued deburring and dimpling
Details

 03-17-2009
4.00
Elevator Stiffner drilling/deburring
Details
       

 03-14-2009
4.00
Elevator stiffner construction
Details
       

 03-12-2009
1.00
Stiffner fabrication
Details

 03-10-2009
1.00
Continued Rudder Work
Details
     

 03-04-2009
4.00
Riveting the rudder together
Details
       

 03-03-2009
3.00
Continued building the rudder
Details
       

 02-28-2009
6.50
Rudder skins and structure nearly ready for riveti
Details
       

 02-27-2009
2.00
Cleco'ed Rudder skins to understructure
Details
       

 02-26-2009
1.00
Back riveting the rudder stiffeners/skins
Details
       

 02-24-2009
4.50
Rudder Fabrication continues
Details
       

 02-23-2009
4.50
Rudder Fabrication
Details
       

 02-20-2009
5.00
Completed Vertical Stabilizer
Details
       

 02-19-2009
5.00
Vertical Stb
Details
       

 02-18-2009
4.00
Completed rivitng the HS stab skins to the underst
Details
       

 02-17-2009
4.00
Continue to rivet the skins on the HS and cut out
Details
       

 02-16-2009
5.00
HS skin riveting
Details
       

 02-10-2009
3.00
Began riviting the Left HS together
Details
       

 02-09-2009
1.00
Riveting
Details
       

 02-06-2009
1.00
Riveted the elevator hinge brackets and bolted on
Details
       

 02-05-2009
5.00
Dimpled all the understructure and riveted the rea
Details
       

 02-04-2009
2.00
DImpled the L & R Horiz Stab skins. I discovered
Details
       

 01-28-2009
6.00
Disassembled and completed deburring, edge trimmin
Details

 01-16-2009
3.50
Started and completed drilling and rib installatio
Details
       

 01-15-2009
3.00

Details
     

 01-14-2009
1.50

Details
       

 01-10-2009
2.00

Details
       

 01-09-2009
1.00

Details
     

 01-08-2009
2.00

Details
     

 01-08-2009
0.50

Details
       

 01-07-2009
0.50
Trimmed fwd spar reenforcements to blend to skin.
Details

 01-05-2009
2.00
Bent the fwd spars reenforcements and spar to 6 de

 12-16-2008
1.50
Fitted, drilled bearing attach brackets and center
Details
     

 12-12-2008
2.00
Fitted, drilled, and sanded both rear spars
Details
     