Date
|
Hours
|
Work Log Summary
|
Details
|
07-03-2011
|
3.50
|
Completed the relocation of the battery box
|
Details
|
|
|
01-05-2011
|
1.00
|
Reattached static line supports and pitch tube/ct
|
|
|
|
12-17-2010
|
2.00
|
Installed rudder and rudder stop/cables
|
|
|
|
12-16-2010
|
2.00
|
Began rudder installation
|
|
|
|
12-14-2010
|
2.00
|
more sanding and filling and primimg and IT'S DONE
|
|
|
|
12-10-2010
|
2.00
|
more sanding and filling and primimg
|
|
|
|
12-08-2010
|
2.00
|
more sanding and filling and primimg
|
|
|
|
12-07-2010
|
2.00
|
more sanding and filling
|
|
|
|
12-06-2010
|
1.00
|
Fiberglassed the rudder bottom joint.
|
|
|
|
12-05-2010
|
3.00
|
Final fit of rudder bottom, riveted it to the rudd
|
|
|
|
12-03-2010
|
2.00
|
Fitted the rudder bottom and repaired cracks along
|
|
|
|
12-02-2010
|
3.00
|
Thought I completed the rudder bottom fit.
|
Details
|
|
|
12-01-2010
|
1.00
|
Trimmed nuts to fit the strobe case
|
|
|
|
11-30-2010
|
2.00
|
Installed and epoxied nuts to hold aft strobe.
|
|
|
|
11-29-2010
|
3.00
|
Cut and fitted rudder bottom.
|
|
|
|
11-24-2010
|
2.00
|
Mounted the vertical stabilizer.
|
|
|
|
11-23-2010
|
2.00
|
Redriilled the elevator horns.
|
Details
|
|
|
11-22-2010
|
2.00
|
Removed the horizontal assembly
|
Details
|
|
|
11-16-2010
|
3.00
|
Redid floor brackets and adjusted pushrods for ele
|
|
|
|
11-15-2010
|
1.00
|
Drilled the elevator pushrod hole and it's off!!!
|
|
|
|
11-13-2010
|
1.00
|
Completed mounting the horizontal stab & elevator.
|
Details
|
|
|
11-12-2010
|
2.00
|
more sanding and filling of the tips - nearly done
|
|
|
|
11-12-2010
|
1.00
|
Completed mounting the horizontal stab & elevator,
|
Details
|
|
|
11-10-2010
|
2.00
|
more sanding and filling of the tips mainly pinhol
|
|
|
|
11-08-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
11-03-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
11-01-2010
|
2.00
|
more sanding & flling of the Vertical & Rudder tip
|
|
|
|
10-13-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-12-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-11-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-07-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-07-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-05-2010
|
1.00
|
more sanding and filling of the tips
|
|
|
|
10-02-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
10-01-2010
|
2.00
|
more sanding & filling of the tips - rt elevator c
|
|
|
|
09-30-2010
|
3.00
|
more sanding and filling of the tips
|
|
|
|
09-29-2010
|
2.00
|
more sanding and filling of the tips
|
|
|
|
09-26-2010
|
2.00
|
more sanding and filling and spraying with sandabl
|
Details
|
|
|
09-25-2010
|
4.00
|
more sanding and filling
|
|
|
|
09-24-2010
|
3.00
|
more sanding and filling and priming
|
|
|
|
09-23-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-21-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-20-2010
|
3.00
|
more sanding and filling
|
|
|
|
09-19-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-18-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-17-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-16-2010
|
3.00
|
yet more sanding and filling
|
|
|
|
09-15-2010
|
2.00
|
more sanding and filling
|
|
|
|
09-13-2010
|
1.00
|
continued to fiberglass horizontal & verticalstabs
|
|
|
|
09-11-2010
|
2.00
|
sanded and filled vertical and horizontal
|
|
|
|
09-10-2010
|
6.00
|
Empennage finishing
|
Details
|
|
|
09-09-2010
|
2.00
|
more filling and sanding
|
|
|
|
09-08-2010
|
4.00
|
more filling and sanding
|
|
|
|
09-07-2010
|
2.00
|
More fililing and sanding
|
|
|
|
09-06-2010
|
2.00
|
Sanded and refilled Vetical Stab and left Horiz St
|
|
|
|
09-05-2010
|
3.00
|
Sanded the filled areas of the empennage and added
|
|
|
|
09-04-2010
|
3.00
|
Installed ruder cable farings and superfilled the
|
|
|
|
09-04-2010
|
2.00
|
Continued filling the open ends of the empennage c
|
|
|
|
09-03-2010
|
5.00
|
Continued empenagge work - superfiling, sanding, e
|
|
|
|
09-02-2010
|
2.00
|
Fabricated fiberglass overlays on top the foam ins
|
|
|
|
09-01-2010
|
4.00
|
Began fabricating closeout foam pieces inside the
|
|
|
|
08-31-2010
|
6.00
|
Continued tip installation
|
|
|
|
08-30-2010
|
4.00
|
Continued installation of fiberglass tips for hori
|
|
|
|
08-28-2010
|
4.00
|
Attached left horizontal stab and left elevator ti
|
|
|
|
08-27-2010
|
4.00
|
Completed aft bulkhead riveting, rudder cable clam
|
|
|
|
08-26-2010
|
2.00
|
Continued riveting the aft bulkhead.
|
|
|
|
08-25-2010
|
6.00
|
Finished drilling, reaming, deburring, the vertica
|
|
|
|
08-24-2010
|
4.00
|
Continued to adjust and secure the vertical stab.
|
|
|
|
08-23-2010
|
4.00
|
Vert stab work. Test fit on aircraft.
|
|
|
|
08-21-2010
|
4.00
|
Aligned, fitted, drilled, attach holes. Measured 0
|
|
|
|
08-20-2010
|
2.00
|
Laid out the underlying structure on the top of th
|
|
|
|
08-19-2010
|
3.00
|
Completed the installation of the aft tie down str
|
|
|
|
08-17-2010
|
2.00
|
Began to fit the horizontal stab. Test fit & meas
|
|
|
|
08-16-2010
|
3.00
|
Fabricated horizontal stabilizer shims. Began to
|
|
|
|
08-09-2010
|
2.00
|
Fitted the rudder fairing and drilled the attach h
|
|
|
|
05-25-2010
|
1.00
|
Fitted strobe light wire in empennage
|
|
|
|
04-27-2009
|
3.00
|
Align Elevators
|
Details
|
|
|
04-21-2009
|
3.50
|
Roll the leading edges of the elevators
|
Details
|
|
|
04-16-2009
|
4.00
|
Nearing completion of left elevator
|
Details
|
|
|
04-15-2009
|
5.00
|
Trim tab/elevator attachment
|
Details
|
|
|
04-15-2009
|
0.00
|
Extra pictures of trim tab/elevator work
|
|
|
|
04-14-2009
|
2.00
|
Trim tab buildup
|
Details
|
|
|
04-13-2009
|
2.00
|
Began fitting of the left elevator trim tab
|
Details
|
|
|
04-12-2009
|
2.00
|
Rivet the left elevator
|
Details
|
|
|
04-11-2009
|
0.50
|
Begin to Rivet the left elevator
|
Details
|
|
|
04-10-2009
|
1.50
|
Bending the elevator and trim tab ends
|
Details
|
|
|
04-10-2009
|
0.50
|
Attaching 703/4 ribs to 702 spar
|
Details
|
|
|
04-08-2009
|
1.50
|
Pitch trim actuator
|
Details
|
|
|
04-05-2009
|
2.00
|
Redid the RT Elevator E-713 to skin junction
|
Details
|
|
|
04-04-2009
|
3.00
|
Began the left elevator understructure preparation
|
Details
|
|
|
04-03-2009
|
3.50
|
Almosr completed the RT elevator.
|
Details
|
|
|
04-02-2009
|
5.00
|
Completed the prep and began riveting the RT eleva
|
Details
|
|
|
04-01-2009
|
1.00
|
Drilling the RT elevator skin
|
Details
|
|
|
03-31-2009
|
4.00
|
Built the RT elevator understructure.
|
Details
|
|
|
03-30-2009
|
2.00
|
Bending of the elevator trailing edges and rivetin
|
Details
|
|
|
03-21-2009
|
2.00
|
Reinstalled Rudder Bearings and completed right el
|
Details
|
|
|
03-20-2009
|
2.00
|
The elevator skins were dimpled
|
Details
|
|
|
03-20-2009
|
2.00
|
Rudder trailing edge prepped for riveting
|
Details
|
|
|
03-19-2009
|
1.00
|
Continued deburring and dimpling
|
Details
|
|
|
03-17-2009
|
4.00
|
Elevator Stiffner drilling/deburring
|
Details
|
|
|
03-14-2009
|
4.00
|
Elevator stiffner construction
|
Details
|
|
|
03-12-2009
|
1.00
|
Stiffner fabrication
|
Details
|
|
|
03-10-2009
|
1.00
|
Continued Rudder Work
|
Details
|
|
|
03-04-2009
|
4.00
|
Riveting the rudder together
|
Details
|
|
|
03-03-2009
|
3.00
|
Continued building the rudder
|
Details
|
|
|
02-28-2009
|
6.50
|
Rudder skins and structure nearly ready for riveti
|
Details
|
|
|
02-27-2009
|
2.00
|
Cleco'ed Rudder skins to understructure
|
Details
|
|
|
02-26-2009
|
1.00
|
Back riveting the rudder stiffeners/skins
|
Details
|
|
|
02-24-2009
|
4.50
|
Rudder Fabrication continues
|
Details
|
|
|
02-23-2009
|
4.50
|
Rudder Fabrication
|
Details
|
|
|
02-20-2009
|
5.00
|
Completed Vertical Stabilizer
|
Details
|
|
|
02-19-2009
|
5.00
|
Vertical Stb
|
Details
|
|
|
02-18-2009
|
4.00
|
Completed rivitng the HS stab skins to the underst
|
Details
|
|
|
02-17-2009
|
4.00
|
Continue to rivet the skins on the HS and cut out
|
Details
|
|
|
02-16-2009
|
5.00
|
HS skin riveting
|
Details
|
|
|
02-10-2009
|
3.00
|
Began riviting the Left HS together
|
Details
|
|
|
02-09-2009
|
1.00
|
Riveting
|
Details
|
|
|
02-06-2009
|
1.00
|
Riveted the elevator hinge brackets and bolted on
|
Details
|
|
|
02-05-2009
|
5.00
|
Dimpled all the understructure and riveted the rea
|
Details
|
|
|
02-04-2009
|
2.00
|
DImpled the L & R Horiz Stab skins. I discovered
|
Details
|
|
|
01-28-2009
|
6.00
|
Disassembled and completed deburring, edge trimmin
|
Details
|
|
|
01-16-2009
|
3.50
|
Started and completed drilling and rib installatio
|
Details
|
|
|
01-15-2009
|
3.00
|
|
Details
|
|
|
01-14-2009
|
1.50
|
|
Details
|
|
|
01-10-2009
|
2.00
|
|
Details
|
|
|
01-09-2009
|
1.00
|
|
Details
|
|
|
01-08-2009
|
2.00
|
|
Details
|
|
|
01-08-2009
|
0.50
|
|
Details
|
|
|
01-07-2009
|
0.50
|
Trimmed fwd spar reenforcements to blend to skin.
|
Details
|
|
|
01-05-2009
|
2.00
|
Bent the fwd spars reenforcements and spar to 6 de
|
|
|
|
12-16-2008
|
1.50
|
Fitted, drilled bearing attach brackets and center
|
Details
|
|
|
12-12-2008
|
2.00
|
Fitted, drilled, and sanded both rear spars
|
Details
|
|