KitLog pro

Powered By Kitlog Pro v2.0

Christopher's Web Site
Work Logs Found: 24
Category Work Time: 93 Hours
 Date
Hours
Work Log Summary

Details

 02-04-2017
3.00
Bubble Installation
Details
       

 02-04-2017
1.50
Antenna and Horizontal Stab Installation
Details
       

 01-18-2017
2.50
Install vertical stabilizer and comm antenna
Details
       

 01-02-2017
4.00
Fuel Tank Cross Braces / Compass Dry Fit
Details
       

 12-20-2016
1.00
Horizontal Paint Scheme Design and Scheduling
Details
       

 12-18-2016
4.00
Vertical Stabilizer
Details
       

 12-13-2016
2.00
Vinyl Lettering
Details
       

 12-12-2016
5.00
Horizontal Stabilizer (Continued)
Details
       

 12-10-2016
6.00
Horizontal Stabilizer
Details
       

 11-19-2016
2.00
Replace Manifold Elbow and Manifold Gauge Elbow Nu
Details
       

 05-01-2016
5.50
Engine Hoist, Firewall, Wheels
Details
       

 12-18-2015
2.00
Oversites and Repairs
Details
       

 12-17-2015
2.00
Cabin Riveting Continued
Details
       

 12-16-2015
7.00
Cabin Riveting
Details
       

 12-06-2015
6.00
Panel Riveting and Assembly
Details
       

 10-25-2015
6.00
Canopy / Nav lights / Eyebrow Panel
Details
       

 09-18-2015
6.00
Exterior Upper Bubble Panels
Details
       

 09-14-2015
7.00
More Exterior Panel Work
Details
       

 09-02-2015
5.00
Slowly Reassembling
Details
       

 08-30-2015
2.50
Exterior Reassembly
Details
       

 08-29-2015
7.50
Nut Plate State of Mind
Details
       

 08-26-2015
2.00
Naked Frame....Once Again
Details
       

 08-25-2015
0.50
Bubble Removal
Details
       

 08-24-2015
3.00
Blind (pop) Rivet Removal
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.