KitLog pro

Powered By Kitlog Pro v2.0

Steves S-20 Build Site.
Work Logs Found: 10
Category Work Time: 79 Hours
 Date
Hours
Work Log Summary

Details

 10-10-2018
3.00
Dynon up and running!
Details
       

 01-14-2018
2.00
USB Mount.
Details
       

 03-13-2017
10.00
Auto Pilot Servos.
Details
       

 02-21-2017
5.00
Install the cabin heater.
Details
       

 02-06-2017
6.00
Populate the panel.
Details
       

 02-06-2017
1.00
Panel fit.
Details
       

 01-28-2017
20.00
Cut the panel.
Details
       

 03-30-2016
25.00
Wiring!
Details
       

 01-11-2016
3.00
Created new temperature probe mount.
Details
       

 08-22-2015
4.00
Installed the Dynon Magnetometer.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.