KitLog pro

Powered By Kitlog Pro v2.0

Matt's RV-10 Website
Work Logs Found: 30
Category Work Time: 70 Hours
 Date
Hours
Work Log Summary

Details

 10-24-2016
1.50
First Engine Run
Details

 06-01-2016
2.00
Baffles, Tunnel SCAT, FAB
Details
       

 03-27-2016
4.00
FWF Electrical
Details
       

 03-21-2016
3.00
Front Baffles, Rudder Fairing, Engine Sensors
Details
       

 03-20-2016
3.00
Engine Probes, AP Mount, Door Gap
Details
       

 02-29-2016
1.50
Magneto Harness and Wire
Details
       

 02-22-2016
2.00
Alternator Install
Details
     

 02-10-2016
2.00
Engine Mount Covers
Details
       

 02-08-2016
2.00
Cut and Drill Air Seal Fabric
Details
       

 01-25-2016
2.00
Oil System
Details
       

 01-24-2016
3.00
Fuel Lines, Enhaust
Details
       

 01-23-2016
1.50
Baffle Seal Patterns
Details
       

 01-18-2016
3.00
Baffling Clips and Tension Rods
Details
       

 01-17-2016
2.00
Painted Cowling
Details

 01-09-2016
3.00
Cowl - Baffling Gap
Details
     

 12-28-2015
4.00
Trimming Baffling
Details
       

 12-27-2015
4.00
Baffling Air Ramps
Details
       

 12-07-2015
2.00
Epoxy Air Ramps and Starter Solenoid Wire
Details
       

 11-28-2015
3.00
FAB Alternate Air and Air Seal
Details
       

 11-27-2015
1.50
FAB Transition Lay-Up
Details
       

 11-24-2015
0.50
Oil Door Lay-Up
Details

 11-23-2015
4.00
Filtered Air Box
Details
     

 11-17-2015
3.50
Baffling
Details
       

 11-16-2015
2.00
Baffling
Details
       

 11-15-2015
1.50
Baffling
Details
       

 10-20-2015
2.00
Mount Engine
Details
       

 10-19-2015
1.50
Engine Arrival
Details
       

 10-18-2015
2.00
Firewall Bulkhead Components
Details
       

 10-10-2015
1.50
Cut Spinner
Details
     

 08-09-2015
2.00
Oil Cooler Mount, Heater Boxes
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.