Date
|
Hours
|
Work Log Summary
|
Details
|
09-21-2016
|
8.00
|
Work on modifying baffling
|
|
|
|
06-06-2016
|
7.00
|
Installed wings with the help of Wayne, Stan, & Sc
|
|
|
|
01-27-2016
|
8.00
|
Finished roll bar. Started inventorying finish kit
|
|
|
|
01-26-2016
|
8.00
|
Make and begin install of roll bar
|
|
|
|
01-25-2016
|
6.00
|
Install and adjust stick controls. Install elevato
|
Details
|
|
|
01-22-2016
|
7.00
|
Elivator actuator tubes, control sticks, sealent
|
|
|
|
01-21-2016
|
8.00
|
Finished riveting top forwars skin. Starrted contr
|
|
|
|
01-20-2016
|
6.00
|
Readying and begin riveting the forward top skin o
|
|
|
|
01-19-2016
|
3.00
|
Cleko attached top front hinge
|
|
|
|
01-18-2016
|
7.00
|
Make and install canopy tilt and release mechanism
|
|
|
|
01-15-2016
|
6.00
|
Made the canopy releas mechanism
|
|
|
|
01-08-2016
|
5.00
|
Installed side rails and prepared dash structure
|
|
|
|
01-07-2016
|
7.00
|
Finished bagage walls and panel structure
|
|
|
|
01-06-2016
|
4.00
|
Working on the subpanel
|
|
|
|
01-05-2016
|
7.00
|
Finishing up Flaps, baggage, and windshield deice
|
|
|
|
01-04-2016
|
9.00
|
Worked on Rudder, Baggage floor, and Flaps
|
|
|
|
12-31-2015
|
7.50
|
Install brakes, brake lines, and start rudder cabl
|
|
|
|
12-30-2015
|
4.50
|
Begin riveting in the baggage compartment flooring
|
|
|
|
12-23-2015
|
6.00
|
Finish and install rudder pedals. Begin installing
|
|
|
|
12-22-2015
|
3.50
|
constructing rudder pedals
|
|
|
|
12-21-2015
|
6.00
|
Prep all the parts for the baggage floor
|
|
|
|
12-18-2015
|
5.00
|
Finished riveting sec 29. Finished fuel lines sec
|
|
|
|
12-17-2015
|
6.00
|
Started installing the fuel transfer system
|
|
|
|
12-16-2015
|
3.00
|
Continue riveting fuselage halfs together
|
|
|
|
12-15-2015
|
2.50
|
Begin riveting
|
|
|
|
12-14-2015
|
5.00
|
Install bulkheads with cleko's
|
|
|
|
12-10-2015
|
4.00
|
Redid the air vents for aluminum vents.
|
|
|
|
12-09-2015
|
9.00
|
Finished R skin to firewall. mated front to back
|
|
|
|
12-08-2015
|
4.00
|
Fresh air vents and side ribs back of baggage area
|
|
|
|
12-07-2015
|
3.00
|
Replaced part F14133 with F14133-1
|
|
|
|
12-04-2015
|
5.00
|
Install the seat back support
|
|
|
|
12-03-2015
|
3.00
|
Start assembling seat back guides
|
|
|
|
12-02-2015
|
6.00
|
Riveting back half of the R fuselage skin
|
|
|
|
12-01-2015
|
6.00
|
Finish L side skin. Start R. fuselage skin
|
|
|
|
11-30-2015
|
4.00
|
Finish L side skin plus prepare fairings
|
|
|
|
11-24-2015
|
6.50
|
Completed left side riveting thru 29-15
|
|
|
|
11-23-2015
|
8.00
|
Begin riveting on the left side skin
|
|
|
|
11-19-2015
|
5.50
|
Prepare and install stiffiners on side skins
|
|
|
|
11-17-2015
|
5.00
|
Dimple side skins. Countersink longerons.
|
|
|
|
11-16-2015
|
4.00
|
Right side hinge for cowling
|
|
|
|
11-13-2015
|
4.00
|
create piano hinge cowl connector for L side
|
|
|
|
11-11-2015
|
8.00
|
Install control column and longerons
|
|
|
|
11-10-2015
|
7.00
|
Final riveting together of the fwd and mid fuselag
|
|
|
|
11-09-2015
|
7.00
|
Begin connecting the two forward fuselage halves
|
|
|
|
11-05-2015
|
3.00
|
battery box installed and finished the lwr fuslg s
|
|
|
|
11-04-2015
|
4.00
|
Firewall heater vents
|
|
|
|
11-02-2015
|
8.00
|
Riveted forward bulkhead to firewall structure. Ve
|
|
|
|
10-30-2015
|
6.00
|
tank seal and rivet firewall assembly to floor ass
|
|
|
|
10-29-2015
|
6.00
|
sealed and riveted exhaust tunnel and sealed to fl
|
|
|
|
10-28-2015
|
6.50
|
Completed riveting firewall and started on crew fl
|
|
|
|
10-27-2015
|
7.00
|
Assembled the firewll and partially riveted
|
|
|
|
10-26-2015
|
6.00
|
Rivet firewall
|
|
|
|
10-23-2015
|
7.00
|
Finished riveting ribs to bottom and started tunne
|
|
|
|
10-22-2015
|
3.00
|
Begin install aftbaggage floor ribs
|
|
|
|
10-21-2015
|
2.00
|
Continue constructing the baggage floor
|
|
|
|
10-13-2015
|
4.00
|
Back to working on the fuselage
|
|
|
|
10-12-2015
|
3.00
|
Catchup
|
Details
|
|
|
09-21-2015
|
1.50
|
Riveting on bottom skin
|
|
|
|
09-17-2015
|
4.50
|
make and Install aft gear brace assembly
|
|
|
|
09-16-2015
|
6.50
|
Prepare the middle bottom skin
|
|
|
|
09-11-2015
|
3.00
|
Make and install idler bracket assembly
|
|
|
|
09-09-2015
|
2.50
|
Installed seat belt attachments
|
|
|
|
09-08-2015
|
3.00
|
Bolted and riveted ribs to main bulkhead
|
|
|
|
09-03-2015
|
2.00
|
riviting rib parts and fluting edge ribs to match
|
|
|
|
08-24-2015
|
4.00
|
Finish old parts and continue working on baggage r
|
|
|
|
08-21-2015
|
5.00
|
Preparing ribs for baggage area
|
|
|
|
08-20-2015
|
1.50
|
Rivet on rib stiffiners
|
|
|
|
08-20-2015
|
3.00
|
Continue working on the bulkheads
|
|
|
|
08-19-2015
|
6.50
|
Working on the third bulkhead
|
|
|
|
08-18-2015
|
6.00
|
Working on the wing attach bulkhead assembly
|
|
|
|
08-17-2015
|
5.00
|
Start on Mid Fuselage bulkhead
|
|
|
|
07-27-2015
|
4.00
|
Inventory fuselage kit
|
|
|