Norris's RV Construction
Work Logs Found: 72
Category Work Time: 378 Hours
 Date
Hours
Work Log Summary

Details

 09-21-2016
8.00
Work on modifying baffling

 06-06-2016
7.00
Installed wings with the help of Wayne, Stan, & Sc
       

 01-27-2016
8.00
Finished roll bar. Started inventorying finish kit
       

 01-26-2016
8.00
Make and begin install of roll bar
     

 01-25-2016
6.00
Install and adjust stick controls. Install elevato
Details
       

 01-22-2016
7.00
Elivator actuator tubes, control sticks, sealent
       

 01-21-2016
8.00
Finished riveting top forwars skin. Starrted contr
     

 01-20-2016
6.00
Readying and begin riveting the forward top skin o

 01-19-2016
3.00
Cleko attached top front hinge

 01-18-2016
7.00
Make and install canopy tilt and release mechanism

 01-15-2016
6.00
Made the canopy releas mechanism
     

 01-08-2016
5.00
Installed side rails and prepared dash structure

 01-07-2016
7.00
Finished bagage walls and panel structure
     

 01-06-2016
4.00
Working on the subpanel

 01-05-2016
7.00
Finishing up Flaps, baggage, and windshield deice
       

 01-04-2016
9.00
Worked on Rudder, Baggage floor, and Flaps

 12-31-2015
7.50
Install brakes, brake lines, and start rudder cabl
       

 12-30-2015
4.50
Begin riveting in the baggage compartment flooring
     

 12-23-2015
6.00
Finish and install rudder pedals. Begin installing
     

 12-22-2015
3.50
constructing rudder pedals
     

 12-21-2015
6.00
Prep all the parts for the baggage floor
     

 12-18-2015
5.00
Finished riveting sec 29. Finished fuel lines sec
       

 12-17-2015
6.00
Started installing the fuel transfer system
       

 12-16-2015
3.00
Continue riveting fuselage halfs together

 12-15-2015
2.50
Begin riveting

 12-14-2015
5.00
Install bulkheads with cleko's

 12-10-2015
4.00
Redid the air vents for aluminum vents.
       

 12-09-2015
9.00
Finished R skin to firewall. mated front to back
       

 12-08-2015
4.00
Fresh air vents and side ribs back of baggage area

 12-07-2015
3.00
Replaced part F14133 with F14133-1

 12-04-2015
5.00
Install the seat back support
     

 12-03-2015
3.00
Start assembling seat back guides

 12-02-2015
6.00
Riveting back half of the R fuselage skin
     

 12-01-2015
6.00
Finish L side skin. Start R. fuselage skin

 11-30-2015
4.00
Finish L side skin plus prepare fairings

 11-24-2015
6.50
Completed left side riveting thru 29-15
       

 11-23-2015
8.00
Begin riveting on the left side skin

 11-19-2015
5.50
Prepare and install stiffiners on side skins

 11-17-2015
5.00
Dimple side skins. Countersink longerons.
     

 11-16-2015
4.00
Right side hinge for cowling

 11-13-2015
4.00
create piano hinge cowl connector for L side
     

 11-11-2015
8.00
Install control column and longerons
     

 11-10-2015
7.00
Final riveting together of the fwd and mid fuselag

 11-09-2015
7.00
Begin connecting the two forward fuselage halves
       

 11-05-2015
3.00
battery box installed and finished the lwr fuslg s
     

 11-04-2015
4.00
Firewall heater vents

 11-02-2015
8.00
Riveted forward bulkhead to firewall structure. Ve
     

 10-30-2015
6.00
tank seal and rivet firewall assembly to floor ass

 10-29-2015
6.00
sealed and riveted exhaust tunnel and sealed to fl
     

 10-28-2015
6.50
Completed riveting firewall and started on crew fl

 10-27-2015
7.00
Assembled the firewll and partially riveted
       

 10-26-2015
6.00
Rivet firewall
     

 10-23-2015
7.00
Finished riveting ribs to bottom and started tunne

 10-22-2015
3.00
Begin install aftbaggage floor ribs
     

 10-21-2015
2.00
Continue constructing the baggage floor

 10-13-2015
4.00
Back to working on the fuselage

 10-12-2015
3.00
Catchup
Details

 09-21-2015
1.50
Riveting on bottom skin

 09-17-2015
4.50
make and Install aft gear brace assembly
     

 09-16-2015
6.50
Prepare the middle bottom skin

 09-11-2015
3.00
Make and install idler bracket assembly

 09-09-2015
2.50
Installed seat belt attachments

 09-08-2015
3.00
Bolted and riveted ribs to main bulkhead
     

 09-03-2015
2.00
riviting rib parts and fluting edge ribs to match

 08-24-2015
4.00
Finish old parts and continue working on baggage r

 08-21-2015
5.00
Preparing ribs for baggage area
     

 08-20-2015
1.50
Rivet on rib stiffiners

 08-20-2015
3.00
Continue working on the bulkheads

 08-19-2015
6.50
Working on the third bulkhead

 08-18-2015
6.00
Working on the wing attach bulkhead assembly
     

 08-17-2015
5.00
Start on Mid Fuselage bulkhead
     

 07-27-2015
4.00
Inventory fuselage kit