KitLog pro

Powered By Kitlog Pro v2.0

Christopher's Web Site
Work Logs Found: 35
Category Work Time: 170 Hours
 Date
Hours
Work Log Summary

Details

 01-16-2017
2.00
E-Mag placard/Carpet templates
Details
       

 02-22-2016
1.50
Quick Assembly Snapshot
Details
       

 01-23-2016
6.00
Skids/Heater ducts/Pitot/Temp Gauge
Details
       

 12-13-2015
10.00
Final Assemby for Cabin Paint
Details
       

 12-05-2015
3.00
Anti-CorrosionTtreatment of the Frame
Details
       

 11-22-2015
6.00
Panel Prep for Painting
Details
       

 11-21-2015
6.00
Misc. Penetrations and Duct Prep.
Details
       

 10-24-2015
7.00
Canopy Frame and Seat Belt Access
Details
       

 09-24-2015
6.00
Console Nut Plates
Details
       

 09-20-2015
9.50
Center Console Continued....
Details
       

 08-23-2015
2.50
Interior Cabin Floor
Details
       

 08-22-2015
4.00
Seat Panels and Cabin Floor
Details
       

 08-21-2015
6.00
Seat panel fabrication
Details
       

 08-18-2015
4.00
Headboard Modifications
Details
       

 08-16-2015
8.00
Forward Progress!
Details
       

 08-15-2015
8.50
Any further backwards and I'd have a tailstrike.
Details
       

 08-14-2015
8.00
Fourth time is a charm
Details
       

 08-04-2015
2.50
Right Interior Panel Refit
Details
     

 08-03-2015
3.00
Pilot's collective well base panel assembly
Details
       

 08-02-2015
7.00
Pilot Collective Well Rebuild
Details
       

 08-01-2015
8.00
Copilot Collective Well Fabrication
Details
       

 07-31-2015
3.00
Copilot Collective Well
Details
       

 07-30-2015
3.00
Aft Kick Panel Fitting
Details
     

 07-29-2015
5.00
Panel Mania....
Details
       

 07-27-2015
4.00
Aft Kick Panel Layout
Details
       

 07-26-2015
2.00
Back from Oshkosh! Co-pilot well panel
Details
       

 07-16-2015
3.00
Left collective well panel fabrication
Details
       

 07-15-2015
2.00
Left collective well panel template
Details
       

 07-13-2015
4.00
Modify Floor and Kick Panels
Details
       

 07-12-2015
5.00
Left Interior Panel Fabrication
Details
       

 07-11-2015
8.00
Right Interior Panel
Details
       

 07-10-2015
3.00
Kick Panel Fabrication and Floor Reinstallation
Details
       

 07-09-2015
3.00
Kick Panel Fabrication
Details
       

 07-08-2015
3.00
Sheetmetal Fabrication of Headboard Panel
Details
       

 07-07-2015
3.00
Headboard Fabrication
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.