Powered By Kitlog Pro v2.0
Christopher's Web Site
Safari 400
Cabin
Work Logs Found:
35
Category Work Time:
170 Hours
Date
Hours
Work Log Summary
Details
01-16-2017
2.00
E-Mag placard/Carpet templates
Details
02-22-2016
1.50
Quick Assembly Snapshot
Details
01-23-2016
6.00
Skids/Heater ducts/Pitot/Temp Gauge
Details
12-13-2015
10.00
Final Assemby for Cabin Paint
Details
12-05-2015
3.00
Anti-CorrosionTtreatment of the Frame
Details
11-22-2015
6.00
Panel Prep for Painting
Details
11-21-2015
6.00
Misc. Penetrations and Duct Prep.
Details
10-24-2015
7.00
Canopy Frame and Seat Belt Access
Details
09-24-2015
6.00
Console Nut Plates
Details
09-20-2015
9.50
Center Console Continued....
Details
08-23-2015
2.50
Interior Cabin Floor
Details
08-22-2015
4.00
Seat Panels and Cabin Floor
Details
08-21-2015
6.00
Seat panel fabrication
Details
08-18-2015
4.00
Headboard Modifications
Details
08-16-2015
8.00
Forward Progress!
Details
08-15-2015
8.50
Any further backwards and I'd have a tailstrike.
Details
08-14-2015
8.00
Fourth time is a charm
Details
08-04-2015
2.50
Right Interior Panel Refit
Details
08-03-2015
3.00
Pilot's collective well base panel assembly
Details
08-02-2015
7.00
Pilot Collective Well Rebuild
Details
08-01-2015
8.00
Copilot Collective Well Fabrication
Details
07-31-2015
3.00
Copilot Collective Well
Details
07-30-2015
3.00
Aft Kick Panel Fitting
Details
07-29-2015
5.00
Panel Mania....
Details
07-27-2015
4.00
Aft Kick Panel Layout
Details
07-26-2015
2.00
Back from Oshkosh! Co-pilot well panel
Details
07-16-2015
3.00
Left collective well panel fabrication
Details
07-15-2015
2.00
Left collective well panel template
Details
07-13-2015
4.00
Modify Floor and Kick Panels
Details
07-12-2015
5.00
Left Interior Panel Fabrication
Details
07-11-2015
8.00
Right Interior Panel
Details
07-10-2015
3.00
Kick Panel Fabrication and Floor Reinstallation
Details
07-09-2015
3.00
Kick Panel Fabrication
Details
07-08-2015
3.00
Sheetmetal Fabrication of Headboard Panel
Details
07-07-2015
3.00
Headboard Fabrication
Details
SITE NAVIGATION
Contact Builder
RV-14A Home
Safari 400 Home
Category
# Logs
# Hours
All
304
955
Avionics
12
29
Cabin
35
170
Certification
3
CHR Pre-shipping
4
Electrical
54
182
Engine
55
178
Exterior
24
93
Flight Controls
14
41
Interior
46
124
Landing Skids
6
24
Main Rotor
9
23
Miscellaneous
11
18
Painting
9
3
Rigging
7
16
Shop & Tools
6
22
Shop Supplies
1
Tail Rotor
4
14
Unpack & Inventory
3
12
Weight & Balance
1
6
Copyright © 2001-2024 Matronics. All Rights Reserved.