KitLog pro

Powered By Kitlog Pro v2.0

Jeff's RV14A Builder's Log
Work Logs Found: 9
Category Work Time: 27 Hours
 Date
Hours
Work Log Summary

Details

 06-21-2015
2.00
Finish filling and sanding elevator fairing tips

 06-20-2015
2.25
Body-filling elev tip fairings
Details

 06-15-2015
4.00
Horiz stab tip fairings
Details
       

 06-14-2015
1.50
Rudder bottom tip fairing attachment
Details

 06-13-2015
3.00
Fairing tips filler layups and attach
Details
       

 05-31-2015
8.50
Rudder top tip, elevator tips
Details
       

 05-26-2015
2.50
Rudder tail nav light doubler
Details

 05-25-2015
1.50
Prepping fairing flanges
Details

 05-25-2015
1.50
Prepping fairing flanges
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.