KitLog pro

Powered By Kitlog Pro v2.0

HANSRUDOLF'S WEB SITE
Work Logs Found: 23
Category Work Time: 60 Hours
 Date
Hours
Work Log Summary

Details

 03-20-2015
1.00
Completed Port Wing
Details

 03-15-2015
1.50
Closing of trailing edge
Details

 03-14-2015
2.00
Trailing Edge Stiffener
Details

 03-12-2015
6.00
Closing of Wing Skin
Details

 03-10-2015
1.00
Inspection Compliance
Details
     

 02-14-2015
2.00
First Inspection of Wing prior to Closing Wing Ski
Details

 02-05-2015
3.00
Back rivet tank bay stiffener and topskin
Details

 02-04-2015
3.00
Typical fuel line doublers for rib penetrations
Details
       

 02-03-2015
6.00
Install Plumbing of Aux and Main Tank
Details
       

 01-31-2015
3.00
Run conduit for Nav/Strobe lights, pump and pitot
Details
       

 01-30-2015
2.00
Install main tank cover
Details

 01-30-2015
3.00
Install inspection door frames and nut plates
Details

 01-30-2015
3.50
Fabricate Aux tank cover
Details

 01-28-2015
2.00
Finish flap and aileron
Details

 01-26-2015
2.00
Cut hole in bottom skin for Aux tank
Details
     

 01-25-2015
4.00
Install main fuel tank
Details
     

 01-20-2015
3.00
Install flaps and aileron
Details

 01-16-2015
2.00
Run aileron cables
Details
       

 01-16-2015
3.00
Install pitot system
Details
       

 01-15-2015
3.00
Install flap actuation system and flap springs
Details
     

 01-15-2015
2.00
Install aileron bellcrank and pulleys
Details

 01-10-2015
1.50
Initial Inspection of Wing
Details
       

 01-10-2015
1.00
Check pre-installed bolts for length and torque
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.