KitLog pro

Powered By Kitlog Pro v2.0

My RV-8 Build Log
Work Logs Found: 17
Category Work Time: 46 Hours
 Date
Hours
Work Log Summary

Details

 12-14-2019
2.00
Replace GSA28 Pitch Servo
Details
       

 04-13-2019
6.00
Control Stick Installation
Details
       

 04-04-2019
2.00
Ailern Trim System Installation
Details
       

 03-31-2019
4.00
Flap Installation
Details
       

 03-30-2019
3.00
Flap Actuator Safety and Installation
Details
       

 03-28-2019
2.00
Rudder Horn to Steering Gear
Details
       

 01-06-2019
5.00
Control Surfaces Re-Install
Details
       

 05-29-2017
2.00
Forward Control Stick
Details
       

 01-12-2017
2.00
Control Tube and Rudder Pedal Reinstallation
Details
       

 09-30-2015
2.00
Flap Position System Control Box Install
Details
       

 09-29-2015
2.00
Flap Position System
Details
       

 09-26-2015
4.00
Forward Control Stick Mods
Details
       

 09-24-2015
2.00
Control Stick Test Fitting
Details
       

 08-27-2015
2.00
A/P Pitch Control Wiring continued...
Details
       

 08-20-2015
2.00
A/P Pitch Control Wiring
Details
       

 08-18-2015
2.00
Elevator Trim and A/P Servo wiring
Details
       

 06-13-2015
2.00
Elevator Neutral Position Adjustment
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.