KitLog pro

Powered By Kitlog Pro v2.0

Neils Web Site
Work Logs Found: 49
Category Work Time: 148 Hours
 Date
Hours
Work Log Summary

Details

 05-10-2024
5.00
Install Tannis Preheat system
Details
       

 05-06-2024
2.00
Installed Odyssey Dry Cell main battery
Details
     

 05-01-2024
3.00
Electronic Ignition Backup Batteries
Details
     

 04-24-2024
3.00
Replace mixture with Vaniere cable
Details
       

 04-22-2024
9.00
Install baffle gaskets
Details
       

 04-15-2024
2.50
Install prop to trim top cowel
Details
     

 03-15-2024
1.00
Gascolator drain
Details
     

 03-11-2024
8.00
Trim cowel
Details
       

 03-06-2024
3.00
Install prop to allow trim cowl
Details
     

 03-02-2024
5.00
Install Mixture Cable
Details
       

 02-21-2024
1.50
Wire Starter
Details
     

 02-19-2024
2.00
Install Scat / Heat tubes
Details
       

 02-15-2024
2.00
Install Fuel Pump vent line
Details
       

 02-13-2024
2.00
Install oil Cooler lines
Details
     

 02-12-2024
2.50
Install Crank Case Breather hose
Details
       

 02-08-2024
2.00
Plumb fuel flow Transducer
Details
       

 02-07-2024
2.00
Plumb Oil Pressure Transducer
Details
     

 02-06-2024
6.00
Install Fuel Flow Transducer
Details
       

 02-01-2024
3.00
Mixture control cable installation
Details
       

 01-29-2024
3.00
Throttle control cable installation
Details
       

 01-24-2024
3.00
Prop control cable installation
Details
       

 01-22-2024
5.00
Heat control Bracket
Details
     

 01-18-2024
3.00
Install heat diverter and control cable
Details
     

 01-17-2024
3.00
Install Aux Heat valve and control cable
Details
     

 01-15-2024
3.00
Install Floor Heat valve and control cable
Details
     

 12-12-2023
3.00
Install EGT probes
Details
     

 12-08-2023
3.00
Install exhaust to engine
Details
     

 12-07-2023
2.00
Attach Exhaust cyl extensions
Details
     

 12-06-2023
2.00
Assemble heat muffs
Details
     

 12-04-2023
4.00
Safety wire baffles on buttom of cyls
Details
     

 11-28-2023
4.00
Bolt and seal baffel sections
Details
     

 11-27-2023
3.00
Continue dry fit of engine baffles
Details
     

 11-23-2023
3.00
Start dry fit of engine baffles
Details
     

 11-22-2023
2.00
Ground engine to aircraft frame
Details
     

 11-21-2023
5.00
Install Ignition module breakers
Details
     

 11-20-2023
4.00
Install lightweight flywheel and slip ring
Details
       

 11-07-2023
6.00
Lightspeed ignition input wiring
Details
       

 11-03-2023
2.00
Wiring from ignition modules to coils
Details
     

 11-01-2023
1.00
Install Current Limiter for Alternator
Details
     

 10-30-2023
0.50
‌Install alternator current limiter
Details
     

 10-27-2023
1.50
Run cables for lightspeed ignition
Details
     

 10-27-2023
2.00
Install right side cable runs
Details
     

 10-16-2023
1.00
Install plumbing on mechanical fuel pump
Details
     

 10-16-2023
1.00
Install oil temp sensor
Details
     

 07-13-2023
3.00
Finish installing bood Cowl
Details
       

 07-11-2023
2.00
Install Boot Cowl Instrment Panel trim
Details
     

 07-07-2023
3.00
Fasten Top, Side and Bottom of Boot Cowl
Details
     

 07-06-2023
3.00
Start installing Boot Cowl
Details
       

 07-05-2023
2.00
Receive and inventory FF Kit
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.