Neils Web Site
RV9A
Firewall Forward
Work Logs Found:
142
Category Work Time:
417 Hours
Date
Hours
Work Log Summary
Details
05-24-2024
3.00
Replace mixture with Vaniere cable
Details
05-20-2024
9.00
Install baffle gaskets
Details
05-15-2024
2.00
Install prop to trim top cowel
Details
05-22-2017
3.00
Start connecting GEA24 harness to EGT CHT
Details
05-16-2017
3.00
Run wire harnes from GEA 24 to probe locations
Details
05-15-2017
3.00
Install EGT Probes
Details
05-12-2017
3.00
Install stainless steel primer lines
Details
02-28-2017
3.00
Change support for ignition wires
Details
02-27-2017
3.00
Change Battery and Start Relay Connection
Details
02-01-2017
4.00
Torque prop bolts - Safety Wire and istall spinner
Details
09-13-2016
4.00
Revised Scat Tubing routing - Continued
Details
09-12-2016
4.00
Revised Scat Tubing routing
Details
09-06-2016
3.50
Fabricate right lower cowel inlet seal and clamp
Details
09-05-2016
2.00
Bond forward air seals to clamps
Details
09-02-2016
3.50
Fabricate left lower cowel inlet seal and clamp
Details
09-01-2016
4.00
Install Cooling Blast Tubes on Magnetos and Altern
Details
08-25-2016
3.00
Drill debur and rivet air seal - Front
Details
08-24-2016
2.50
Drill debur and rivet air seal - left side
Details
08-23-2016
2.50
Drill debur and rivet air seal - aft
Details
08-19-2016
4.50
Fabricate Air Seal between baffle and top cowel
Details
08-18-2016
2.00
Plumb Oil cooler to engine
Details
08-17-2016
2.50
Install Oil Cooler
Details
08-16-2016
4.00
Fabricate and install 3 remaining tension rods
Details
08-15-2016
2.50
Fabricate and install Cyl 1&3 Tension rod
Details
08-12-2016
1.50
Route Magneto wires to lower plugs
Details
08-11-2016
3.00
Route Magneto wires to top spark plugs
Details
08-10-2016
1.00
Fill spark plug access holes in baffle per plans
Details
08-09-2016
3.00
Fabricate and install Baffle clips
Details
08-08-2016
4.00
Finished trimming baffle to fit under cowl
Details
08-05-2016
5.00
Continue triming top of baffle to fit under cowel
Details
08-04-2016
4.00
Continue triming top of baffle to fit under cowel
Details
08-03-2016
3.00
Continue triming top of baffle to fit under cowel
Details
08-02-2016
3.00
Continue triming top of baffle to fit under cowel
Details
08-01-2016
3.00
Continue triming top of baffle to fit under cowel
Details
07-22-2016
4.00
Started trimming baffles to fit under top cowl
Details
07-21-2016
2.50
Debur dimple and rivet right gusset
Details
07-20-2016
3.00
Debur dimple and rivet left gusset
Details
07-11-2016
3.00
Trim and fit Flywheel baffles
Details
07-07-2016
4.00
Fabricate forward baffle gussets
Details
07-06-2016
3.00
Rivet on ramps to stiffeners
Details
07-06-2016
1.00
Rivet left ramp support to left ramp
Details
07-05-2016
2.50
Cut matchdrill and fit left ramp support
Details
06-28-2016
2.50
Complete left intake ramp
Details
06-27-2016
2.50
Complete fitting of right baffle ramp
Details
06-22-2016
4.00
Continue triming and bending Baffle
Details
06-21-2016
5.00
Start trimming Baffles to fit air intakes
Details
06-20-2016
2.00
Reattach baffles to top of engine
Details
06-17-2016
2.00
Fill gaps BTW upper Cowel and Air intakes
Details
06-16-2016
2.00
Air Intake Ducts
Details
06-08-2016
2.00
Rivet lower fire wall
Details
06-07-2016
4.00
Complete installation of lower cowl bracket
Details
06-01-2016
4.00
Fit lower cowel bracket
Details
05-30-2016
3.00
Complete Left intake ramp and baffle
Details
05-25-2016
2.00
Drill engine support for lower cowel support brack
Details
05-24-2016
4.00
Run and connect control cables to Carb.
Details
05-23-2016
2.00
Fabricate brackes for Carb Heat and Finter Bypass
Details
05-11-2016
4.00
Complete Airbox fabrication
Details
05-09-2016
4.00
Complete lower Cowel Air gap fabrication
Details
05-03-2016
3.00
Fabricate and install flter bypass door
Details
05-02-2016
2.00
Start Filter bypass installation
Details
04-27-2016
3.00
Completed Carb heat assembly
Details
04-22-2016
8.00
Fabricate new AirBox
Details
04-13-2016
3.50
Run Throttle and Mixture cables
Details
04-11-2016
2.50
Cowel Air Inlet
Details
04-11-2016
2.00
Airbox heat input
Details
04-01-2016
2.50
Sand fiberglass / epoxy to shape
Details
03-30-2016
2.50
Epoxy fiberglass strips around cowl foam
Details
03-30-2016
2.00
Attached heat control cable
Details
03-29-2016
3.00
Carve foam plug in cowl to fit Air box
Details
03-28-2016
3.50
Start fill of gap between Air Box and Lower Cowel
Details
03-23-2016
2.50
Install Prop Governor Cable
Details
03-22-2016
2.00
Drill control cable bracket
Details
03-21-2016
4.00
Mount Prop Governor
Details
03-15-2016
5.00
Fabricate Carb Heat Valve
Details
03-11-2016
3.00
Mount Air Box / Carb and check for cowl fit
Details
03-10-2016
3.00
Drill and trim air box to top plate
Details
03-09-2016
4.00
Fit Air box Top Plate Horizontal and Vertical
Details
02-29-2016
2.00
Engine bolts
Details
02-29-2016
2.00
Cowl cleanup 1
Details
02-25-2016
3.00
Adjusted cowl hinges after bonding
Details
02-22-2016
3.00
Bonded lower right side and bottom hinges to cowl
Details
12-16-2015
3.00
Bond side hinges to top cowl with flox
Details
12-15-2015
3.00
Drill / deburr holes to lower cowel hinges for bon
Details
12-14-2015
3.00
Drill / deburr holes to upper cowel hinges for bon
Details
11-26-2015
5.00
Cut and trim side of bottom Cowl to fit top cowl
Details
11-24-2015
3.00
Fit bottom hing to lower cowl
Details
11-23-2015
3.00
Initial fit of top and bottom Cowl
Details
11-17-2015
4.00
Assemble Carb support plate and filter brackets
Details
11-16-2015
2.00
Drill top cowl to piano hinges
Details
11-12-2015
1.00
Cut top cowl as per layout
Details
11-11-2015
2.00
Lay out top cowl for triming
Details
11-10-2015
3.00
Finish installing cowl support piano hinges
Details
11-09-2015
1.50
Reseal Air Filter
Details
11-09-2015
3.00
Continue installing cowl hinges
Details
11-07-2015
1.00
Cut hole for oil door in upper cowl
Details
11-05-2015
3.00
Install piano hinge for top cowl attach to fusala
Details
11-02-2015
3.00
Temporarily fit lower cowl
Details
11-02-2015
1.00
Cut length of air box to fit lower cowel
Details
10-31-2015
4.00
Fit Air Box Filter
Details
10-29-2015
3.00
Start Air Box installation & fabrication
Details
10-28-2015
4.00
Mount Prop on Engine
Details
10-27-2015
2.50
Mount spinner rear bulkhead to prop
Details
10-26-2015
2.00
Fit spinner back plate to doubler
Details
10-26-2015
2.00
Drill out firewall to fusalage rivets
Details
10-25-2015
1.50
Cut slot in lower cowl for front gear
Details
10-23-2015
5.00
Fabricate Exit Air Attach Brack for lower cowel
Details
10-19-2015
4.00
Fabrication and initial fit of baffle on ramps
Details
10-17-2015
2.00
Start fabrication of forward baffles
Details
10-17-2015
3.00
Prelim fit cyl 1 & 2 baffles
Details
10-15-2015
4.00
Prelim fit of cyl 3 & 4 baffle
Details
10-14-2015
5.00
Continue baffle fabrication cyl 1&2
Details
10-08-2015
4.00
Continue baffle fabrication Cyl 3
Details
10-07-2015
3.50
Continue baffle fabrication Cyl 4
Details
10-06-2015
1.50
Reroute Breather over exhaust
Details
10-06-2015
3.00
Continue fabricating engine baffling Cyl 4
Details
10-01-2015
6.00
Start fabrication of engine baffle
Details
09-28-2015
3.00
Complete installation of Exhaust
Details
09-25-2015
3.00
Fabricate and install side exhaust hangers
Details
09-24-2015
2.00
Initial Tail Pipe fitup
Details
09-15-2015
4.00
Install Exhaust pipes to cylinders
Details
09-11-2015
1.00
Fuel pump drain
Details
09-11-2015
0.50
Attach fuel line between Gascolator and pump
Details
09-10-2015
2.00
Attach fuel lines between engine pump and carb
Details
09-09-2015
2.00
Fit Oil pressure and Breather tubes
Details
09-07-2015
1.00
Install control cable bracket and carburetor
Details
09-01-2015
5.00
Installed engine
Details
08-31-2015
1.00
Received O-320 Engine from Lycoming
Details
08-27-2015
1.50
Locate and drill firewall holes for Mixture and Pr
Details
07-08-2015
3.00
Run fuel line between boost pump and Gascollato
Details
07-07-2015
2.00
Sealed Heat Bypass vent to firewall
Details
07-07-2015
0.50
Sealed firewall front gear bolt hole
Details
07-06-2015
2.00
Seal and Bolt Gascollator to fire wall
Details
07-06-2015
2.00
Drilled and fit Heat Bypass vent to fire wall
Details
07-03-2015
4.00
Install Gascollator Doubler
Details
07-01-2015
0.50
Drill Gascolator fitting hole in firewall and doub
Details
06-25-2015
2.00
Drilled in Gascolator doubler plate
Details
06-24-2015
1.00
Battery Box Retainer
Details
06-23-2015
3.50
Debur, dimple, rivet, battery box to outside brack
Details
06-22-2015
4.00
Drill battery box to fire wall
Details
06-19-2015
4.00
Mount relays to firewall
Details
06-18-2015
2.00
Match drill dimple and counter sink relay doubler
Details
06-16-2015
2.00
Fabricate Relay Doubler
Details
SITE NAVIGATION
Contact Builder
EX-3 Home
RV9A Home
Category
# Logs
# Hours
All
858
3468
Avionics
106
456
DAR and Technical Co
6
12
Delivery & Invenory
3
23
Empennage
121
306
Engine
22
82
Finish
188
800
Firewall Forward
142
564
Fuselage
178
700
Miscellaneous
3
25
None
2
40
Wings
87
460