KitLog pro

Powered By Kitlog Pro v2.0

Kupe's Zodiac 650B
Work Logs Found: 71
Category Work Time: 127 Hours
 Date
Hours
Work Log Summary

Details

 05-24-2022
3.50
Replaced Muffler
Details
       

 10-08-2020
8.00
15 Hour Engine Inspection
Details
       

 05-13-2020
3.00
Secure Outside Air Sceet Duct
Details
       

 02-24-2020
3.00
Add Naca Vent to Lower Cowl
Details
       

 10-21-2019
2.50
Engine Wiring/Hoses Re-secured 2
Details
     

 10-17-2019
3.00
Engine Wiring/Hoses Re-secured 1
Details
       

 08-19-2019
1.50
ULPower Service Bulletin No. 2015-01
Details
       

 06-13-2019
2.00
Improve Throttle Cable Routing
Details
     

 06-10-2019
2.00
ULPower Service Bulletin 2016-02
Details
     

 12-17-2018
1.00
Aircraft Registered
Details
     

 11-19-2018
6.00
Cabin Heat 5: Pilot Side Install
Details
       

 11-15-2018
3.00
Cabin Heat 4: Control Cable/Skeet Hose Install
Details
       

 11-12-2018
4.00
Cabin Heat 3: Pass-Thru Install
Details
       

 11-07-2018
4.00
Cabin Heat 2, Siting the Holes
Details
       

 10-30-2018
4.00
Oil Filter Secure, Cabin Heat 1
Details
       

 04-12-2018
2.00
Engine Baffles Reinstall
Details
       

 02-11-2018
2.00
Exhaust Pipe Installed
Details
       

 09-21-2017
2.00
Post Engine Run Cleanup
Details
     

 09-20-2017
3.00
First Engine Run (plus a little more)
Details

 11-27-2016
1.50
Exhaust Pipe Installation
Details
       

 08-06-2016
2.00
Sparl Plug Wire Mount/ Misc
Details
       

 05-18-2016
0.50
Dual Throttle Linkage Complete
Details
       

 04-29-2016
1.50
Throttle Installation Part 1
Details
       

 12-20-2015
1.50
Engine Control Unit (ECU) Mount
Details
       

 11-29-2015
1.00
Cowling Paint (Interior) Complete
Details
     

 11-21-2015
1.50
Fuel Feed Line, Cowling Paint
Details
       

 11-14-2015
1.00
Baffle Seal Fasteners
Details
     

 11-01-2015
1.50
Cowl Paint and Oil Line Tightening
Details
       

 08-26-2015
1.00
Final Cowl Fitting
Details
     

 08-25-2015
1.00
Oil Filler Access Door Complete
Details
       

 08-23-2015
1.50
Begin Oil Filler Access Door
Details
       

 08-22-2015
1.50
Baffle Seals Complete
Details
       

 08-12-2015
1.50
Baffle Seals 2
Details
       

 08-11-2015
1.50
Complete Front Baffles/Start Baffle Seals
Details
       

 08-09-2015
1.00
Front Baffles 3
Details
     

 08-07-2015
1.00
Front Baffles 2
Details
       

 08-05-2015
1.00
Front Baffles 1
Details
       

 08-03-2015
1.50
Cowling Install 3
Details
       

 08-01-2015
1.00
Cowling Install 2
Details
       

 07-29-2015
1.00
Cowling Install 1
Details
       

 07-28-2015
1.00
Cowling Fit 5
Details
       

 07-26-2015
2.00
Cowling Fit 4
Details
       

 07-25-2015
2.00
Cowling Fit 3
Details
       

 07-23-2015
1.50
Cowling Fit 2
Details
       

 07-22-2015
1.00
Cowling Fit 1
Details
       

 07-21-2015
1.00
Propeller - First Fitting
Details
       

 07-17-2015
1.50
Spark Plug Leads Complete
Details
       

 07-16-2015
1.00
Final Install Baffles
Details
       

 07-14-2015
1.00
Spark Plug Leads 2
Details
       

 07-13-2015
1.00
Spark Plug Leads 1
Details
       

 07-12-2015
1.00
EGT Probe Installaiton
Details
       

 07-10-2015
1.00
Muffler Installation 2
Details
       

 07-09-2015
1.00
Muffler Installation 1
Details
     

 07-08-2015
1.50
Oil Pressure and CHT Sensors
Details
       

 07-06-2015
1.00
Rectifier Regulator Hose
Details
       

 07-05-2015
2.00
More Fuel Lines / Air Oil Separator Hoses
Details
       

 07-04-2015
1.00
Fuel Line fitting
Details
       

 07-03-2015
0.50
Oil Cooler Fitting 3
Details
       

 07-02-2015
1.00
Oil Cooler Fitting 2
Details
       

 07-01-2015
0.50
Oil Cooler Fitting 1
Details
       

 06-30-2015
1.00
Baffles FItting 3
Details
       

 06-29-2015
1.50
Baffles Fitting 2
Details
       

 06-26-2015
1.50
Baffles Fitting
Details
       

 06-25-2015
1.50
Install Air-Oil Separator and Fine Fuel Filter
Details
       

 06-24-2015
1.50
Battery Box, Fuel Pump Housing Finish
Details
       

 06-17-2015
2.00
Ignition Coil and Regulator/Rectifier
Details
       

 06-16-2015
1.00
Mount Engine
Details
       

 06-13-2015
2.00
Engine Prep for Mountng
Details
       

 06-07-2015
2.00
Fuel Pump Setup
Details
       

 06-07-2015
1.50
Engine Mount Cleanup and Paint
Details
       

 06-06-2015
2.00
Engine Mount First Fitting
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.