Powered By Kitlog Pro v2.0
Kupe's Zodiac 650B
Zodiac 650 B
Engine
Work Logs Found:
71
Category Work Time:
127 Hours
Date
Hours
Work Log Summary
Details
05-24-2022
3.50
Replaced Muffler
Details
10-08-2020
8.00
15 Hour Engine Inspection
Details
05-13-2020
3.00
Secure Outside Air Sceet Duct
Details
02-24-2020
3.00
Add Naca Vent to Lower Cowl
Details
10-21-2019
2.50
Engine Wiring/Hoses Re-secured 2
Details
10-17-2019
3.00
Engine Wiring/Hoses Re-secured 1
Details
08-19-2019
1.50
ULPower Service Bulletin No. 2015-01
Details
06-13-2019
2.00
Improve Throttle Cable Routing
Details
06-10-2019
2.00
ULPower Service Bulletin 2016-02
Details
12-17-2018
1.00
Aircraft Registered
Details
11-19-2018
6.00
Cabin Heat 5: Pilot Side Install
Details
11-15-2018
3.00
Cabin Heat 4: Control Cable/Skeet Hose Install
Details
11-12-2018
4.00
Cabin Heat 3: Pass-Thru Install
Details
11-07-2018
4.00
Cabin Heat 2, Siting the Holes
Details
10-30-2018
4.00
Oil Filter Secure, Cabin Heat 1
Details
04-12-2018
2.00
Engine Baffles Reinstall
Details
02-11-2018
2.00
Exhaust Pipe Installed
Details
09-21-2017
2.00
Post Engine Run Cleanup
Details
09-20-2017
3.00
First Engine Run (plus a little more)
Details
11-27-2016
1.50
Exhaust Pipe Installation
Details
08-06-2016
2.00
Sparl Plug Wire Mount/ Misc
Details
05-18-2016
0.50
Dual Throttle Linkage Complete
Details
04-29-2016
1.50
Throttle Installation Part 1
Details
12-20-2015
1.50
Engine Control Unit (ECU) Mount
Details
11-29-2015
1.00
Cowling Paint (Interior) Complete
Details
11-21-2015
1.50
Fuel Feed Line, Cowling Paint
Details
11-14-2015
1.00
Baffle Seal Fasteners
Details
11-01-2015
1.50
Cowl Paint and Oil Line Tightening
Details
08-26-2015
1.00
Final Cowl Fitting
Details
08-25-2015
1.00
Oil Filler Access Door Complete
Details
08-23-2015
1.50
Begin Oil Filler Access Door
Details
08-22-2015
1.50
Baffle Seals Complete
Details
08-12-2015
1.50
Baffle Seals 2
Details
08-11-2015
1.50
Complete Front Baffles/Start Baffle Seals
Details
08-09-2015
1.00
Front Baffles 3
Details
08-07-2015
1.00
Front Baffles 2
Details
08-05-2015
1.00
Front Baffles 1
Details
08-03-2015
1.50
Cowling Install 3
Details
08-01-2015
1.00
Cowling Install 2
Details
07-29-2015
1.00
Cowling Install 1
Details
07-28-2015
1.00
Cowling Fit 5
Details
07-26-2015
2.00
Cowling Fit 4
Details
07-25-2015
2.00
Cowling Fit 3
Details
07-23-2015
1.50
Cowling Fit 2
Details
07-22-2015
1.00
Cowling Fit 1
Details
07-21-2015
1.00
Propeller - First Fitting
Details
07-17-2015
1.50
Spark Plug Leads Complete
Details
07-16-2015
1.00
Final Install Baffles
Details
07-14-2015
1.00
Spark Plug Leads 2
Details
07-13-2015
1.00
Spark Plug Leads 1
Details
07-12-2015
1.00
EGT Probe Installaiton
Details
07-10-2015
1.00
Muffler Installation 2
Details
07-09-2015
1.00
Muffler Installation 1
Details
07-08-2015
1.50
Oil Pressure and CHT Sensors
Details
07-06-2015
1.00
Rectifier Regulator Hose
Details
07-05-2015
2.00
More Fuel Lines / Air Oil Separator Hoses
Details
07-04-2015
1.00
Fuel Line fitting
Details
07-03-2015
0.50
Oil Cooler Fitting 3
Details
07-02-2015
1.00
Oil Cooler Fitting 2
Details
07-01-2015
0.50
Oil Cooler Fitting 1
Details
06-30-2015
1.00
Baffles FItting 3
Details
06-29-2015
1.50
Baffles Fitting 2
Details
06-26-2015
1.50
Baffles Fitting
Details
06-25-2015
1.50
Install Air-Oil Separator and Fine Fuel Filter
Details
06-24-2015
1.50
Battery Box, Fuel Pump Housing Finish
Details
06-17-2015
2.00
Ignition Coil and Regulator/Rectifier
Details
06-16-2015
1.00
Mount Engine
Details
06-13-2015
2.00
Engine Prep for Mountng
Details
06-07-2015
2.00
Fuel Pump Setup
Details
06-07-2015
1.50
Engine Mount Cleanup and Paint
Details
06-06-2015
2.00
Engine Mount First Fitting
Details
SITE NAVIGATION
Contact Builder
Zodiac 650 B Home
Category
# Logs
# Hours
All
774
1452
Avionics
35
54
Brakes
21
35
Canopy
38
72
Cockpit
34
54
Electrical
73
120
Engine
71
127
Flight Test
1
1
Fuel
26
48
Fuselage
136
252
Landing Gear
19
28
Miscellaneous
28
54
Polishing
8
24
Rudder
25
70
Shop
7
8
Stabilizer
37
77
Wings
215
428
Copyright © 2001-2024 Matronics. All Rights Reserved.