Powered By Kitlog Pro v2.0
Steve & Nancy Riffe
RV8
Baffles
Work Logs Found:
52
Category Work Time:
161 Hours
Date
Hours
Work Log Summary
Details
07-23-2016
3.00
Baffle seals, oil door, hinge prep
Details
05-24-2016
3.00
RIvet sides and rear seals to baffles
Details
05-23-2016
3.00
Lower ramp seals-2
Details
05-19-2016
1.00
Lower cowl ramp seals-1
Details
05-18-2016
5.00
Front baffle seals-2
Details
05-09-2016
3.00
Front baffle seals-1
Details
05-07-2016
3.00
Side bafflle seals
Details
05-02-2016
3.00
Rear baffle seals
Details
05-01-2016
2.00
Blast tubes for mags
Details
04-29-2016
2.00
L. side bension rods installed
Details
04-28-2016
2.00
R. side tension rods finished
Details
04-25-2016
1.00
Add stiffener to #3, start tension rods
Details
04-24-2016
1.00
Install #1 baffle assembly
Details
04-23-2016
3.00
Finish snorkel
Details
04-22-2016
2.00
#2 baffle assembly-final riveting
Details
04-21-2016
4.00
Snorkel and #2 baffle work-5
Details
04-18-2016
4.00
Snorkel and #2 baffle work-3
Details
04-17-2016
2.00
Snrokel and #2 baffle work-2
Details
04-16-2016
3.00
Snorkle and #2 baffle work-1
Details
04-15-2016
2.00
Replace rivet on #1 baffle, start air filter insta
Details
04-14-2016
4.00
Rivet #1 baffle assembly
Details
04-13-2016
3.00
Final trim front baffles
Details
04-11-2016
2.00
Final trim fwd. side baffles
Details
04-10-2016
2.00
Install upper air ramps, trim baffles
Details
04-01-2016
1.00
Install #3 baffle, trim r. air ramp
Details
03-31-2016
4.00
Install oil cooler, rivet #3 baffle assembly
Details
03-30-2016
4.00
#4 baffle riveting-final
Details
03-29-2016
3.00
#4 Baffle riveting-2
Details
03-28-2016
4.00
#4 Baffle riveting-1
Details
03-26-2016
4.00
Oil cooler mounting-6
Details
03-25-2016
3.00
Oil cooler mounting-5
Details
03-24-2016
2.00
Clips for forward baffle to ramps
Details
03-23-2016
1.00
R side conical gussett
Details
03-21-2016
4.00
Oil cooler mounting-4, start conical gussets
Details
03-19-2016
4.00
Oil cooler mounting-3
Details
03-18-2016
2.00
Oil cooler mounting-2
Details
03-17-2016
4.00
Oil cooler mounting-1
Details
03-16-2016
5.00
Trim front baffles
Details
03-14-2016
3.00
Start front baffles
Details
03-10-2016
3.00
Doubler for #3 baffle
Details
03-09-2016
4.00
FAB work & paper clip marking
Details
03-08-2016
3.00
FAB snorkel fitting-2
Details
03-07-2016
6.00
Trimming baffles-2
Details
03-05-2016
4.00
Trimming baffles-1
Details
03-03-2016
4.00
R. baffle/ L. FAB work
Details
03-02-2016
4.00
Baffled by inlet ramps!
Details
03-01-2016
4.00
Fitting lower cowl to fwd. baffles
Details
02-29-2016
3.00
FAB snorkle fitting-1
Details
02-26-2016
4.00
Baffles #4, #3 & side plates
Details
02-25-2016
4.00
#3 Baffle install-1
Details
02-24-2016
2.00
Re-do of CB-1008B stiffener
Details
06-02-2015
5.00
Rivet doubler plates
Details
SITE NAVIGATION
Contact Builder
RV8 Home
Category
# Logs
# Hours
All
1451
2701
Avionics
7
10
Baffles
52
161
Canopy
105
173
Cowling
64
179
Empennage
263
356
Engine
10
18
F/W Forward
81
210
Final Assembly
77
161
Flying!
2
1
Fuselage
300
468
Instrument Panel
36
68
Interior
3
5
Landing Gear
21
35
Miscellaneous
10
15
Move
1
0
Practice Kit
6
Prop
15
39
Prop/Spinner
15
39
Shop
2
Tools
3
0
Wheel pants,fairings
25
68
Windscreen
34
113
Wing Install
43
108
Wing Tip Install
34
86
Wing Tip Nav Lights
7
21
Wings
145
210
Wiring
90
157
Copyright © 2001-2024 Matronics. All Rights Reserved.